• Nenhum resultado encontrado

Scheduling Problem with Human Energy Recovery Function under Nonlinear Time-dependent Deterioration

N/A
N/A
Protected

Academic year: 2017

Share "Scheduling Problem with Human Energy Recovery Function under Nonlinear Time-dependent Deterioration"

Copied!
7
0
0

Texto

Loading

Imagem

TABLE I T HE R ESULTS OF C OMPARISONS Makespan RMAC RAMNC T b T < U ? k C max C max 10 0.054 Yes 4 253.06 258.55 0.056 Yes 4 254.42 260.58 0.059 Yes 4 256.49 263.68 0.100 Yes 4 287.37 310.59 20 0.054 No 258.55 258.55 0.056 No 260.58 260.58 0.059 No 263.

Referências

Documentos relacionados

Iniciando a análise dos resultados presentes na Tabela 3 por meio do que ocorre com a variável raça/cor, é possível notar semelhanças com as descritivas no sentido de

where the first term is the setup cost of the i th product in a given sequence per unit time and the second term is the holding cost of the i th product (based on the

In this paper, the problem of single machine total weighted tardiness was considered and because of immense complexity, a genetic algorithm was presented so as to obtain near

scheduling problem with unequal release date of jobs, worker with learning ability and the machine with deteriorating effect where the objective is the total weighted

This paper considered the single machine scheduling problem with restrictive common due date involving tardiness and earliness penalties.. This type of prob- lem became more