Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion

N/A
N/A
Protected

Academic year: 2017

Share "Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion"

Copied!
10
0
0

Texto

Loading

Imagem

Table 2. Total Processing Time for 10-Jobs, 10-Machines by Palmer’s Heuristic Model
Table 3. Total Processing Time for 10-Jobs, 10-Machines by Gupta’s Heuristic Model

Referências

Documentos relacionados

To find the running time, notice that if η is the number of generations, μ the population size, n the quantity of genes of any chromosome (problem input) and as it is

Our problem is to some extent related with the classical parallel machine scheduling problem (PMSP), in which there are n jobs to schedule in m machines aiming

En perspectiva los datos obtenidos proporcionan una nueva comprensión sobre la necesidad de conocer la visión de todos los actores al momento de desarrollar propuestas turísticas,

No contexto deste trabalho de investigação tentar-se-á compreender, também, qual a inter-relação entre a literacia científica e literacia em leitura. A inter-relação

The two points considered at the alternate sides, of the tangents through the diameter of the circle, and then the line joining these points divides the circle

Model is presented in AON (Activity on Node) structure. Resources are renewable. The renewable resources have limited capacities. Activities are allowed to move only in their free

Em 2005, ocorre a criação do Programa Nacional de Reorientação da Formação em Saúde (Pró-Saúde), tendo como proposta a integração ensino-serviço a par r

O conhecimento dos processos que regulam a estabilização da matéria orgânica do solo (MOS) é necessário para predizer as alterações nos estoques de C com