Study of relationship between time overrun and productivity on construction sites

N/A
N/A
Protected

Academic year: 2017

Share "Study of relationship between time overrun and productivity on construction sites"

Copied!
12
0
0

Texto

Loading

Imagem

Table 1: Demographic profile of research participants
Table 2: Consultants and contractors perception of causes of time overrun in construction site
Table 3:  Rankings of causes of low productivity in construction site by organisation
Table 4: Relationship between time overrun and labour productivity
+2

Referências

Documentos relacionados

The best way to achieve this goal is to apply a solvent-free, pH-neutral, hydrophobic adhesive resin layer in a separate step, as confirmed by inferior in vitro and in vivo

The present study demonstrated that an auditory accessory stimulus can increase or decrease responsiveness to a visual target stimulus. In a simple reaction time task, a

This article addresses a case study performed in a lens factory, where the utilization of time and motion study allowed an increase in production capacity with a reduction in

The probability of attending school four our group of interest in this region increased by 6.5 percentage points after the expansion of the Bolsa Família program in 2007 and

Com o interesse na excelência operacional para essa organização, o autor considerou a importância da análise das competências dos profissionais do setor

Neste estudo observou-se uma prevalência discretamente maior destes fatores de risco nos idosos institucionalizados, o que corrobora com o fato da institucionalização ser, por si

Face aos resultados do presente estudo, pode-se concluir que existem relações significativas entre as atitudes e crenças antissociais e o comportamento

Com análise gráfica dos dados extraídos do lançamento do RT (altura x tempo) foi possível ao grupo de alunos levantar hipóteses, estabelecer relações e tirar