A disruption production model with exponential demand
Texto
Imagem
Documentos relacionados
Pricing and inventory control policy for non-instantaneous deteriorating items with time- and price-dependent demand and partial backlogging.. Hiwa Farughi a* , Narges Khanlarzade b
An Economic production Quantity model with time dependent demand under fuzzy environment, Int.. of
A two-stage integrated approach of sustainable procurement and postponement method is proposed for the multi-product ATO production system to deal demand uncertainty, green house
Preemptive fuzzy goal programming (P-FGP) model for aggregate production and logistics planning with interval demand and uncertain production capacity is proposed
(17-18) it can be observed that when shortage cost is high, machine repair time is high; deterioration rate is low, the number of machine breakdowns is high; inventory holding
This paper has presented production-inventory models for deteriorating items having varying demand patterns with Weibull-distribution deterioration and partial backlogging under
A multi-period model was developed to obtain optimal replenishment schedules for such items using a general ramp-type demand pattern that allows for three-phase variation in
A conventional approach for solving an economic production quantity (EPQ) model with multi-delivery policy and quality assurance is to use mathematical modeling for deriving the