A New Approach to find Total Float time and Critical Path in a fuzzy Project Network
Texto
Documentos relacionados
To improve this and to facilitate supplier selection process, the paper discusses a fuzzy - AHP approach using triangular fuzzy numbers to represent decision makers’ comparison
The capacities of the arcs and the fuzzy costs (modal value and spreads) of the commodities are given in Table 11, and the solution of the fuzzy problem found by decomposition
In this paper, we propose a novel fuzzy time series model based on fuzzy logical relationships tree containing multi- orders relationships, in which the robustness of lower orders
Fuzzy Newton-Cotes formula, such as fuzzy trapezoidal method and fuzzy Simpson method are calculated by integration of fuzzy functions on two and three equally space points.. Also
The questions discussed in inverse DEA can be considered with fuzzy data, that is, assume that some data are fuzzy numbers and we increase some or all input levels of a given DMU
RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD.. Sandra Milena
In this paper we discuss fuzzy strongly continuous semigroups fuzzy dynamical systems relationships and results obtained in [1] on invariant sets and stability of such fuzzy sets,
It was also showed that project network its fuzzy earliest-start time, fuzzy earliest-finish time, fuzzy latest-start time and latest-finish time of each activity in Table
Addressing the study purpose of identifying and characterising executives’ inside-out firm- oriented and outside-in market-oriented mental models, this study has extended contemporary