Mestrado em Engenharia do Ambiente 5º ano / 9º semestre Impactes Ambientais

N/A
N/A
Protected

Academic year: 2021

Share "Mestrado em Engenharia do Ambiente 5º ano / 9º semestre Impactes Ambientais"

Copied!
30
0
0

Texto

(1)

3 ª aula

Prof. Doutora Maria do Rosário Partidário

Quadro legal e institucional para AIA a nível

europeu e nacional / Legal and institutional

framework for EIA at European and national levels

Processo e produtos / Process and products

Selecção de acções / Screening

Mestrado em Engenharia do Ambiente

5º ano / 9º semestre

(2)

SISTEMA DE AIA /

EIA SYSTEM

- Legislação / Legislation

- Processo / Process

- Actores / Actors

- Produtos / Products

(3)

Directive 85/337/CEE of 27 June,

modified by Directive 97/11/CE of March 3rd,

on the assessment of the effects of certain public and

private projects on the environment

http://europa.eu.int/comm/environment/eia/full-legal-text/9711.htm

Scope of application:

'project’:

- the execution of construction works or of other installations or schemes,

-other interventions in the natural surroundings and landscape including those involving the extraction of mineral resources;

(4)

Directive 85/337/CEE of 27 June,

modified by Directive 97/11/CE of March 3rd,

on the assessment of the effects of certain public

and private projects on the environment

Scope of “environment”:

• human beings, fauna and flora,

• soil, water, air, climate and the landscape, • material assets and the cultural heritage,

• the inter-action between the factors mentioned in the first and second indents.

(5)

Directive 85/337/CEE of 27 June,

modified by Directive 97/11/CE of March 3rd

The information to be provided by the developer:

• a description of the project comprising information on the site, design and size of the project,

• a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant adverse effects,

• the data required to identify and assess the main effects which the project is likely to have on the environment,

• an outline of the main alternatives studied by the developer and an indication of the main reasons for his choice, taking into account the environmental effects,

• a non-technical summary of the information mentioned in the previous indents.

(6)

Key features

-Establishes the European model of EIA

-Positive list (Annex I - mandatory and Annex II - discretionary) -Voluntary scoping

-Assessment of alternatives

-Annex III - criteria for the significance of environmental impacts -Public participation and institutional engagement

-Requirements for information on the decision

Directive 85/337/CEE of 27 June,

(7)

Aarhus Convention and

European Directive 2003/4/CE of 28 January

http://www.unece.org/env/pp/

Access to information, Public participation in environmental decision-making and Access to justice in environmental matters

European Directive 2004/35/CE - environmental

responsibility

(8)

UNECE Convention on EIA in a Transboundary

Context (Espoo Convention)

http://www.unece.org/env/eia/

Adopted in 1991, entered into force in 1997

Environmental threats do not respect national borders.

Governments have realized that to avert this danger they must notify and consult each other on all major projects under

consideration that might have adverse environmental impact across borders.

44 countries are now signatories to the Convention

The Espoo Convention is a key step to bringing together all

(9)

INSTITUTIONAL FRAMEWORK FOR EIA IN

EUROPE

DG ENVIRONMENT

Responsible for the administration of European Directives and for overviewing member-states activities in implementing EIA, ensuring they are fulfilled.

Other sectoral DG in their areas of responsibility (for example DG Transports, DG Regions, DG Energy)

(10)

EIA in the EU

COWI study (2009) concerning the report on the application and effectiveness of the EIA Directive

General findings of the Study:

-The EIA procedures ensures that environmental

considerations are taken into account in the decision-making process

-The EIA procedures ensures transparency in the environmental decision-making

The Study:

-Contains analysis of 27 MS

-Examines organisational and legal arrangements in place, expertise and level of experience

-It is the fourth review of the EIA Directive, previously in 2003, 1997 and 1993.

(11)

EIA in the EU

COWI study (2009) concerning the report on the application and effectiveness of the EIA Directive

Specific findings - most problematic areas:

-Screening - the use of thresholds, lack of capacity in ensuring sound screening, variations in application, combined procedures

-(Cumulative effects - require more guidance, lack of experience on how to address)

-(Alternatives - not sufficiently address, proponents resist to study environmental alternatives)

-Transboundary consultations - different procedures, time frames applied in the various Member States. Language differences and cost of translation

-Quality control - challenges in assuring quality -Monitoring - lack of provisions in the EIA Directive

(12)

LEGISLAÇÃO FUNDAMENTAL DE

AVALIAÇÃO DE IMPACTE AMBIENTAL

PORTUGAL

LEGISLAÇÃO NACIONAL FUNDAMENTAL

Decreto-Lei nº 69/2000 de 3 de Maio, com a redação

anexa ao Decreto-Lei nº 197/2005 de 8 de

Novembro

Portaria nº 330/2001 de 2 de Abril (Portaria das

(13)

QUADRO INSTITUCIONAL PARA AIA

PORTUGAL

Autoridade de AIA

A entidade da Administração Pública responsável pela coordenação e administração do processo de AIA e a quem compete a promoção e condução da participação pública

Projectos Anexo I (grandes projectos) - Agência Portuguesa do Ambiente

Projectos do Anexo II - Comissões de Coordenação e Desenvolvimento Regional (CCDR)

(14)

QUADRO INSTITUCIONAL PARA AIA

PORTUGAL

Comissão de Avaliação

Grupo especializado, de técnicos representantes da Administração e consultores independentes, responsável pela apreciação técnica no processo de AIA.

(15)

QUADRO INSTITUCIONAL PARA AIA

PORTUGAL

Entidade licenciadora ou competente

para a autorização

A entidade competente da Administração Pública para tomar uma decisão de autorização ou de licenciamento sobre o projecto proposto

(16)

Process of Environmental Impact

Assessment (IAIA,1999):

Screening Scoping EIS preparation Quality Review Decision Post-evaluation

Does the project require an EIA?

What are key environmental issues?

Impacts assessment, mitigation measures, monitoring and environmental management

Were impacts and mitigation measures well

identified, and a monitoring programme defined? Approval or rejection

(17)

EIA PROCESS IN

PORTUGAL

APRECIAÇÃO TÉCNICA SCREENING SCOPING EIS PREPARATION QUALITY REVIEW DECISION POST-EVALUATION I

POST-EVALUATION II (All cases)

(only for EIA developed at Previous Studies phase)

(18)

Depend on EIA systems:

• Positive lists - explicitely state conditions for EIA

submission, with or without thresholds

• Negative ou exclusion lists - explicitely state

conditions to exclude a project from EIA submission, with

or without thresholds

• Initial studies to determine if a given projects must be

submitted, or not, to EIA.

(19)

Screening criteria

•Project category (classification, objectives, characteristics, type of manufactured products...);

•Location (protected areas, coastal areas, ….);

•Dimension (area, extension, flows, tension, amount of resources being used, nr of units,...);

•Other similar projects in the neighbourhood (cumulative effects); •Time horizon;

•Investment value (Equator Principles); •Two or more of the above criteria.

(20)

Screening in Portugal

1- Projects identified in the positive list - Annex I and Annex II 2- Exclusion from EIA (for projects on the positive list)

3- Joint decision by the environmental minister and the sector minister (for projects not on the positive list)

4- Preliminary assessment (for projects on the positive list but below thresholds) 1. Positive list 2. Exclusion 4. Preliminary assessment 3. Joint decision EIA Y/N: EIA Y/N: EIA EIA

(21)

EIA Directive -positive list Annex I

(22)

EXEMPLOS DA LISTA POSITIVA E LIMIARES

DE PROJECTOS

ANEXO I (Decreto-Lei nº 69/2000 de 3 de Maio com redação dada pelo

197/2005 de 8 de Novembro) EXEMPLO

….

7-a) Construção de vias para o tráfego ferroviário de longo curso e aeroportos cuja pista de descolagem e de aterragem tenha um comprimento de pelo menos 2100 m.

b) Construção de auto-estradas e de estradas destinadas ao tráfego motorizado, com duas faixas de rodagem, com separador, e pelo menos duas vias cada, e

c) Construção de itinerários principais e de itinerários complementares, de acordo com o Decreto-Lei nº 222/98, de 17 de Julho, com troços superiores a 10 km

….

13 - Estações de tratamento de águas residuais de capacidade superior a 150 000 hab/eq

(23)

Anexo II (Decreto-Lei nº 69/2000 de 3 de Maio com

redação dada pelo 197/2005 de 8 de Novembro)

10 - Projectos de infra-estruturas

Todos Todos

k) Obras costeiras de combate à erosão

marítima… não previstos em PMOT…

Estradas nacionais e regionais: todas

….. Itinerários principais e itinerários

complementares. Estradas

nacionais e estradas regionais, de acordo com o Decreto-Lei nº 222/98, de 17 de Julho, em troços >= 10 km….

e) Construção de estradas, … (não incluídos no Anexo I)

Todos Todos

m) Obras de transferência de recursos hídricos entre bacias hidrográficas (não incluídas no Anexo I

Áreas sensíveis Caso geral

Tipo de projecto

Todos Todos os parques industriais com

indústrias de classe A ou área >= 10 ha e loteamentos área >= 10ha a) Projectos de loteamento e

(24)

Áreas Sensíveis

(Decreto-Lei nº 69/2000 de 3 de Maio com redação

dada pelo 197/2005 de 8 de Novembro)

i) Áreas protegidas, classificadas ao abrigo do Decreto-Lei nº 19/93, de 23 de Janeiro, com as alterações introduzidas pelo Decreto-Lei nº 227/98, de 17 de Julho;

ii) Sítios da Rede Natura 2000, zonas especiais de conservação e zonas de protecção especial, classificadas nos termos do Decreto-Lei nº 140/99, de 24 de Abril, no âmbito das Directivas nº 79/409/CEE e 92/43/CEE;

iii) Áreas de protecção dos monumentos nacionais e dos imóveis de interesse público definidos nos termos da Lei nº 13/85, de 6 de Julho.

(25)

Actors

Inherently active in the process:

• Project proponent

• Project designer

• EIS consultant company

• Authority responsible for project licensing or authorization

• Environmental authority (usually the Ministry)

• EIA authority

• EIS quality review commission

(26)

Directly involved:

• Environmental non-governmental organizations

• Other non-governmental organizations

• Courts

• Ombudsman for Justice (Provedor de Justiça)

• Media

• General public

(27)

Strategic-political:

• Members of Parliament

• Government

• Spatial territory managers

(28)

SELECÇÃO DE ACÇÕES DEFINIÇÃO DO ÂMBITO PREPARAÇÃO DO EIA

PROCEDIMENTOS EM AIA EM PORTUGAL

PDA EIA RECAPE Rel. Monitorização APRECIAÇÃO TÉCNICA DECISÃO PÓS-AVALIAÇÃO I Estudos Iniciais PÓS-AVALIAÇÃO II

(29)

Products

Depend on the system

In Portugal (only the main products):

• Estudos Iniciais / Initial Studies

• Proposta de Definição do Âmbito (PDA) / Scoping proposal

• Deliberação da Definição do Âmbito / Scoping decision

• Estudo de Impacte Ambiental (EIA) /EIS

• Relatório da Consulta Pública / Public Consultation report (PCR) • Parecer da Comissão de Avaliação / Comment on PCR

• Declaração de Impacte Ambiental (DIA) / Environmental Impact

Statement

• Relatório de Confomidade Ambiental do Projecto de Execução

(RECAPE) / Report on the project environmental conformity

(30)

SCREENING SCOPING EIS PREPARATION QUALITY REVIEW DECISION POST-EVALUATION I POST-EVALUATION II

PRINCIPAIS PRODUTOS DE AIA EM PORTUGAL

PDA / Scoping proposal

EIA /EIS RECAPE / Project Conformity Rel. Monitorização / Monitoring report Estudos iniciais / Initial studies

Referências

Documentos relacionados

Obviamente que o método teórico é o ideal, mas o método simplificado surge da ideia de que muitas equipas de controlo de qualidade não implementam um controlo no momento de

This investigation has two main purposes: to contribute to a better understanding of the anatomy of the subcutaneous tissue of the lower abdominal wall and simultaneously

Dica: O professor pode mostrar para o aluno uma mola deformada e informar que essa mola não irá funcionar no experimento.. Também deve ser aconselhado ao aluno que traga materiais

Neste âmbito e de acordo com o previsto no artigo n.º 2 da Lei n.º 47/2005, de 29 de agosto, os órgãos ficam impossibilitados de deliberar ou de decidir em matérias,

The questionnaire was developed with eight main themes: contents, digital learning resources, formative activities plan, online forums interac- tions, regulatory

muitas dúvidas e medos, dessa forma a oferta de serviço de educação em saúde visa reduzir as dúvidas sobre o tratamento de forma a aprimorar a adesão e segurança do

Enterococcus faecalis strain SN369 plasmid insertion sequence IS1216 transposase gene, partial cds; cadE and tetS genes, complete sequence; and TetS gene, partial cds

Concluiu-se que o Direito Educacional não recebe a valorização necessária no campo pedagógico, tendo em vista não ser considerado como fundamental na formação do