7
0
0

Texto

(1)

July 9, 2010

Sample Procurement Plan

I. General

1.

Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision

15 of Updated Procurement Plan, June 2010]

2.

Date of General Procurement Notice: Dec 24, 2006

3.

Period covered by this procurement plan: The procurement period of project covered

from year June 2010 to December 2012

II. Goods and Works and non-consulting services.

1.

Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as

stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable

procurement methods (not limited to the list below) will be determined by the

Procurement Specialist /Procurement Accredited Staff based on the assessment of the

implementing agency’s capacity.]

Procurement Method

Prior Review Threshold

US$

Comments

1.

ICB and LIB (Goods)

Above US$ 500,000

All

2.

NCB (Goods)

Above US$ 100,000

First contract

3.

ICB (Works)

Above US$ 15 million

All

4.

NCB (Works)

Above US$ 5 million

All

5.

(Non-Consultant Services)

Below US$ 100,000

First contract

[Add other methods if necessary]

2.

Prequalification. Bidders for _Not applicable

_ shall be prequalified in accordance with

the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3.

Proposed Procedures for CDD Components (as per paragraph. 3.17 of the

Guidelines: [Refer to the relevant CDD project implementation document approved by

the Bank or delete if not applicable]

4.

Reference to (if any) Project Operational/Procurement Manual: Project

Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by

<mention name of PIU>

5.

Any Other Special Procurement Arrangements: [including advance procurement and

retroactive financing, if applicable]

5 ICB works packages will be financed under

retroactive financing

6.

Summary of the Procurement Packages planned during the first 18 months after project

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

July 9, 2010

effectiveness ( including those that are subject to retroactive financing and advanced

procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1

2

3

4

5

6

7

Ref.

No.

Description

Estimated

Cost

US$

million

Packages

Domest

ic

Prefere

nce

(yes/no)

Review

by Bank

(Prior / Post)

Comments

Summary of

the ICB

(Works)

82

5

No

Prior

Summary of

the ICB

(Goods)

43.77

15

No

Prior

Summary of

the NCB

(Works)

64.53

18

No

Post

1

st

contract

for Prior

Review

Summary of

the NCB

(Goods)

1.86

4

No

Post

1

st

contract

for Prior

Review

Summary of

the ICB

(Non-Consultant

Services)

0.45

1

No

Prior

III. Selection of Consultants

1.

Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated

in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method

Prior Review Threshold

Comments

1.

Competitive Methods (Firms)

Above US$ 100,000

2.

Single Source (Firms)

All

3.

Individual

Above US$ 50,000

2.

Short list comprising entirely of national consultants: Short list of consultants for

services, estimated to cost less than $_

300,000

_equivalent per contract, may comprise

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the

Consultant Guidelines.

3.

Any Other Special Selection Arrangements: [including advance procurement and

retroactive financing, if applicable or delete if not applicable]

(3)

July 9, 2010

1

2

3

4

5

6

Ref. No.

Description of

Assignment

Estimated

Cost

US$

million

Packages

Review

by Bank

(Prior /

Post)

Comments

Summary of

number of

contracts that

will be let

under QCBS

4.17

7

Prior

Summary of

number of

contracts that

will be let

under other

methods

0.83

1

Prior

CQS

(4)

Page 1

PROCUREMENT

PLAN

Brazil : Rio Grande do Sul SWAp

General Information

Country:

Brazil

Banks Approval Date of the Original Procurement Plan:

2017-07-26

Revised Plan Date(s): (comma delineated, leave blank if none)

2017-10-20

Project ID:

P120830

GPN Date:

Project Name:

Rio Grande do Sul SWAp

Loan / Credit No:

IBRD / 81550

Executing Agency(ies): Secretariat of Planning, Mobility and Regional Development of the State of Rio Grande do Sul

WORKS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess Prequalification(Y/N) Actual Amount(US$) ProcessStatus Draft Pre-qualificationDocuments Evaluation ReportPrequalification Draft Bidding Document/ Justification Specific ProcurementNotice / Invitation Bidding Documents asIssued Proposal Submission /Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-SEPLAN-RS-25438-CW-RFP / Contratação de empresa para execução das obras do Programa CREMA Santa Maria/Cachoeira do Sul (DAER)

IBRD / 81550 Eligible Expenditure Program(EEP) Prior Request for Bids Open - International Single Stage - OneEnvelope 0.00PendingImplementation 2016-06-01 2016-06-29 2016-08-23 2016-10-11 2016-11-17 2021-10-22

BR-SEPLAN-RS-25442-CW-RFP / Contratação de empresa(s) para execução das obras do Programa CREMA Passo Fundo: Lote1-Passo Fundo/Cruz Alta e Lote 2-Passo Fundo/Palmeira das Missões (DAER)

IBRD / 81550 Eligible Expenditure Program(EEP) Prior Request for Bids Open - International Single Stage - OneEnvelope 0.00PendingImplementation 2016-06-01 2016-06-30 2016-08-24 2016-10-25 2016-11-30 2021-11-04

GOODS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess Prequalification(Y/N) Actual Amount(US$) ProcessStatus Draft Pre-qualificationDocuments Evaluation ReportPrequalification Draft Bidding Document/ Justification Specific ProcurementNotice / Invitation Bidding Documents asIssued Proposal Submission /Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-SEPLAN-RS-24447-GO-RFB / Aquisição de bens de TIC (estações trabalho, softwares para escritório, notebooks, projetores, televisores, switchs, tablets, rack para equipamento servidor, nobreak para equipamento servidor, terminal videoconferência, etc.) (SDECT -Fortalecimento)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-09-30 2017-10-15 2017-10-30 2017-11-14 2018-01-18 2018-07-17

BR-SEPLAN-RS-26248-GO-RFB / Aquisição de bens de TIC para o DECAP e CEL (estações de trabalho, monitores, etc.) (SPGG - Gerenciamento PROREDES)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-26250-GO-RFQ / Aquisição de 18 cadeiras para o Departamento de Captação de Recursos-DECAP (SPGG - Gerenciamento Proredes)

IBRD / 81550 Technical Assistance on Public Sector Management Post

Request for Quotations Limited

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-06 2018-01-01 2018-06-30 BR-SEPLAN-RS-26253-GO-RFB

/ Aquisição de bens de TIC necessários à implantação da IEDE (SPGG - IEDE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01 BR-SEPLAN-RS-26254-GO-RFB

/ Aquisição de pacote de softwares para integração SOA e serviços de implantação e suporte técnico (SPGG - IEDE)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-26255-GO-RFB

/ Aquisição de hardware para armazenamento e serviços de implantação e suporte técnico (SPGG - IEDE)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-10-01 2017-10-16 2017-10-31 2017-11-15 2018-01-19 2018-07-18 BR-SEPLAN-RS-26260-GO-RFB

/ Aquisição de um veículo pick-up (SPGG - IEDE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-09-15 2017-09-30 2017-10-15 2017-10-30 2018-01-03 2018-07-02 BR-SEPLAN-RS-26261-GO-RFB

/ Aquisição de um veículo aéreo -DRONE

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-09-15 2017-09-30 2017-10-15 2017-10-30 2018-01-03 2018-07-02 BR-SEPLAN-RS-26263-GO-RFB

/ Aquisição de uma impressora plotter (SPGG - IEDE)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-09-15 2017-09-30 2017-10-15 2017-10-30 2018-01-03 2018-07-02 BR-SEPLAN-RS-26264-GO-RFB

/ Aquisição de equipamentos de georreferenciamento (Kit receptor GPS (base/rover), receptor portátil GPS e bússola) para fiscalização e acompanhamento do convênio com o Exército (SPGG-IEDE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending Implementation 2017-10-10 2017-10-25 2017-11-09 2017-11-24 2018-01-28 2018-07-27 BR-SEPLAN-RS-28662-GO-RFB / Aquisição e instalação de estações telemétricas (60) e pluviômetros automáticos (100) (SEMA-GRD)

(5)

Page 2 BR-SEPLAN-RS-28672-GO-RFB

/ Aquisição de sistema de video-wall com software (SEMA-GRD)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28678-GO-RFB / Aquisição de 2 veículos tracionados (SEMA-SIRAM)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28700-GO-RFB

/ Aquisição de bens de TIC (475 desktops e 6 no-breaks) (SEMA-SIRAM)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28723-GO-RFB / Aquisição de 1 equipamento servidor (SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28731-GO-RFB

/ Aquisição de bens de TIC (24 desktops com monitor alta performance) (SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28734-GO-RFB

/ Aquisição de 2 projetores alta resolução (SEMA-ZEE)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28736-GO-RFB

/ Aquisição de 2 veículos (SEMA - ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28738-GO-RFB

/ Aquisição de 1 impressora laser colorida (SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28739-GO-RFB / Aquisição de 2 câmeras fotográficas (SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28742-GO-RFB

/ Aquisição de 1 lente para câmera fotográfica (SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28754-GO-RFB

/ Aquisição de software Bonita (upgrade de licença) com serviços instalação, capacitação e suporte técnico e contratação de serviços de consultoria para o software Alfresco (SMARH -Gestão de Ativos)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01

BR-SEPLAN-RS-28767-GO-RFB / Bens de TIC-Sala PELT (4 estações de trabalho, 1 Notebook, 1 Monitor/TV Full HD 55 pol com pedestal, 1 câmera para videoconferência, 4 licenças software Microsoft Office PRO (ST-PELT)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18

BR-SEPLAN-RS-28775-GO-RFB / Aquisições de bens de TI para reestruturação do IPERGS (11 servidores, 55 microcomputadores, 14 Switches, 3 Nobreaks, 1 unidade de Backup, rack 42 U) (IPERGS)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18

BR-SEPLAN-RS-28985-GO-RFB / Aquisição de equipamentos para laboratório de pesquisa rodoviária (DAER)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01 BR-SEPLAN-RS-28987-GO-RFB

/ Aquisição de prensas hidráulicas e equipamentos para ensaios de módulo em misturas asfálticas e solos, incluindo estufa para adequado condicionamento das amostras durante o ensaio, para módulo de ligantes, fadiga e flow number (DAER)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01

BR-SEPLAN-RS-28988-GO-RFB / Aquisição de barra laser (DAER)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending Implementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01 BR-SEPLAN-RS-29010-GO-RFB / Aquisição de equipamentos para fiscalização e acompanhamento do convênio com o Exército (Notebook,HD 2TB, Telemetro, Inversor de tensão, Binóculo, Gravador de voz, Kit EPI) (SPGG - IEDE)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01

BR-SEPLAN-RS-29157-GO-RFB / Aquisição de material e equipamentos para sala de treinamento da SMARH, sala de reuniões e sala de abertura de licitações (placas de espuma acústica, tela de projeção, 3 apresentadores de slides, 5 cabos hdmi, 3 caixas de som) (CELIC - Modern Compras)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

(6)

Page 3 BR-SEPLAN-RS-29158-GO-RFB

/ Aquisição de mobiliário e material para a CELIC (sala de treinamento da SMARH, sala de reuniões e sala de abertura de licitações e departamentos)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01 BR-SEPLAN-RS-29161-GO-RFB

/ Aquisição de bens de TIC para a sala de treinamento, sala de reuniões, sala de abertura de licitações, pregoeiros e departamentos da CELIC (estações de trabalho e periféricos) (CELIC - Modern Compras)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01

BR-SEPLAN-RS-29163-GO-RFB / Aquisição de equipamentos para alienações, teste de amostras e fiscalização de entregas

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-15 2017-11-30 2017-12-15 2017-12-30 2018-03-05 2018-09-01

NON CONSULTING SERVICES

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess Prequalification(Y/N) Actual Amount(US$) ProcessStatus Draft Pre-qualificationDocuments Evaluation ReportPrequalification Draft Bidding Document/ Justification Specific ProcurementNotice / Invitation Bidding Documents asIssued Proposal Submission /Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-SEPLAN-RS-28705-NC-RFB / Serviço de digitação das coleções do Museu de Ciências Naturais da FZB (SEMA-SIRAM)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28717-NC-RFB

/ Serviço de fornecimento de imagens óticas orbitais de acervo dimensionadas em quilômetros quadrados (SEMA-SIRAM)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28729-NC-RFB

/ Aquisição de software de geoprocessamento com serviços conexos (Pacote ArcGis Server: atualização de 2 licenças de ArcGis + aquis. 2 licenças, trf tec., operação assistida e suporte 5 anos)(SEMA-ZEE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18

BR-SEPLAN-RS-28743-NC-RFB / Serviço de telemonitoramento de frota veicular (SMARH -Gestão de Ativos)

IBRD / 81550 Technical Assistance on PublicSector Management Post Request for Bids Open - National Single Stage - OneEnvelope 0.00PendingImplementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18 BR-SEPLAN-RS-28780-NC-RFB

/ Serviço de instalação de rede lógica e elétrica (IPERGS)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Request for Bids Open - National

Single Stage - One

Envelope 0.00 Pending

Implementation 2017-11-01 2017-11-16 2017-12-01 2017-12-16 2018-02-19 2018-08-18

CONSULTING FIRMS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Actual Amount(US$) Process Status Terms of Reference Expression of InterestNotice Request for ProposalsShort List and Draft Request for Proposalsas Issued Opening of TechnicalProposals / Minutes Evaluation of TechnicalProposal

Combined Evaluation Report and Draft Negotiated Contract

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-SEPLAN-RS-15643-CS-LCS / Realização de 6 cursos voltados ao tema de Licitações Públicas, modalidade in company (CELIC).

IBRD / 81550 Technical Assistance on PublicSector Management Post Least Cost Selection Open - National 0.00PendingImplementation 2016-11-22 2016-12-27 2017-01-26 2017-02-25 2017-03-12 2017-05-06 2017-07-05 2018-01-01 BR-SEPLAN-RS-19004-CS-LCS

/ Inspeção e avaliação de segurança de rodovias e melhoria da gestão de segurança rodoviária utilizando o programa iRAP (DAER).

IBRD / 81550 Technical Assistance on Public

Sector Management Post Least Cost Selection Open - National 0.00 Pending

Implementation 2017-02-24 2017-03-31 2017-04-30 2017-05-30 2017-06-14 2017-08-08 2017-10-07 2018-04-05

BR-SEPLAN-RS-19007-CS-QCBS / Pesquisa de mercado visando relacionar os itens do catálogo de bens do Estado a produtos disponíveis no mercado, com seus respectivos códigos de barra (CELIC)

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-03-07 2017-04-11 2017-05-11 2017-06-10 2017-06-25 2017-08-19 2017-10-18 2018-08-14

BR-SEPLAN-RS-19010-CS-LCS / Realização de imageamento de alta resolução, aquisição de dados vetoriais (feições de hidrografia e de relevo), construção de modelos digitais de elevação (MDE), geração de ortoimagens da Reg Func. de Planejamento 1, compatível escala 1:25.000 (SPGG-IEDE)

IBRD / 81550 Technical Assistance on Public

Sector Management Post Least Cost Selection Open - National 0.00 Under

Implementation 2017-07-14 2017-07-14 2017-08-13 2017-07-28 2017-09-12 2017-09-27 2017-11-21 2018-01-20 2019-02-14

BR-SEPLAN-RS-19811-CS-QCBS / Elaboração de instrumentos de gestão ambiental para o DAER/RS (DAER).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending Implementation 2017-05-24 2017-06-28 2017-07-28 2017-08-27 2017-09-11 2017-11-05 2018-01-04 2018-10-31 BR-SEPLAN-RS-19830-CS-QCBS / Elaboração do plano diretor de tecnologia da informação e comunicação (PDTI) do Departamento Autônomo de Estradas de Rodagem (DAER).

(7)

Page 4

BR-SEPLAN-RS-19869-CS-QCBS / Desenvolvimento de novas funcionalidades no Sistema de Gestão de Compras do Estado (GCE) e no Sistema de Gestão de Contratos Públicos (GCP) (CELIC).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-03-13 2017-04-17 2017-05-17 2017-06-16 2017-07-01 2017-08-25 2017-10-24 2018-10-19

BR-SEPLAN-RS-19870-CS-QCBS / Desenvolvimento de software do Sistema de Controle da Frota Veicular (CFV) (SMARH).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-03-07 2017-04-11 2017-05-11 2017-06-10 2017-06-25 2017-08-19 2017-10-18 2018-10-13

BR-SEPLAN-RS-19871-CS-QCBS / Desenvolvimento de software do Sistema de Gestão do Patrimônio Imóvel do Estado (GPEWEB) (SMARH).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-03-13 2017-04-17 2017-05-17 2017-06-16 2017-07-01 2017-08-25 2017-10-24 2018-10-19

BR-SEPLAN-RS-19876-CS-QCBS / Desenvolvimento de software do Sistema de Gestão de Riscos de Desastres do Estado do Rio Grande do Sul (GRD) do Centro de Operações de Defesa Civil (SEMA-GRD)

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-07-21 2017-08-25 2017-09-24 2017-10-24 2017-11-08 2018-01-02 2018-03-03 2019-02-26

BR-SEPLAN-RS-19882-CS-QCBS / Proposição de melhorias à gestão dos fundos previdenciários sob o Regime Próprio de Previdência Social dos servidores públicos do Estado do Rio Grande do Sul (IPERGS).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-09-01 2017-10-06 2017-11-05 2017-12-05 2017-12-20 2018-02-13 2018-04-14 2018-10-11

BR-SEPLAN-RS-19886-CS-QCBS / Apoio à implementação da gestão por processos na Secretaria do Desenvolvimento Econômico, Ciência e Tecnologia (SDECT).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-07-21 2017-08-25 2017-09-24 2017-10-24 2017-11-08 2018-01-02 2018-03-03 2019-02-26

BR-SEPLAN-RS-19878-CS-QCBS / Desenvolvimento de software do Sistema de Gestão Previdenciária (IPERGS).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-07-21 2017-10-06 2017-11-05 2017-12-05 2017-12-20 2018-02-13 2018-04-14 2019-04-09

BR-SEPLAN-RS-19835-CS-QCBS / Análise de eventos de estiagem e definição de critérios de outorga para utilização de recursos hídricos subterrâneos (SEMA-GRD).

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00Canceled 2017-08-01 2017-09-05 2017-10-05 2017-11-04 2017-11-19 2018-01-13 2018-03-14 2018-11-09

BR-SEPLAN-RS-29013-CS-QCBS / Contratação de empresa para elaboração do Plano de Projeto Global para a implantação da IEDE (SPGG -IEDE)

IBRD / 81550 Technical Assistance on Public Sector Management Post

Quality And

Cost-Based Selection Open - National 0.00 Pending

Implementation 2017-11-15 2017-12-20 2018-01-19 2018-02-18 2018-03-05 2018-04-29 2018-06-28 2018-12-25

Referências

Documentos relacionados

1-rural, o valor médio da terra-nua e das benfeitorias divulgado pelo INSTITUTO DE ECONOMIA AGRÍCOLA da Secretaria de Agricultura e Abastecimento do Estado de

Este teste permite verificar se a tinta existente pertence ao grupo das que formam a película por evaporação de solventes (ex: acrílica, borracha clorada, vinílica), pelo

Foi utilizado um modelo autoregressivo de séries temporais para entender as relações entre oscilação do nível, clima e vegetação na bacia do Guarantã, que se encontra em uma

A construção da primeira unidade Habitacional foi usada como “escola” para que os trabalhadores envolvidos pudessem aprender a tecnologia de construção e hoje está

Entre os meses de maio de 1999 e setembro de 2001 o sistema de remediação foi monitorado através de poços de monitoramento localizados a montante, jusante e interior da barreira,

thuringiensis, a grande variabilidade genética identificada entre os diferentes isolados leva a utilização de técnicas avançadas, como a PCR (Reação em Cadeia da

A construção de um paradidático em quadrinhos foi uma utopia transformada em realidade por nós. Pensando em buscar alternativas viáveis para a construção do conceito de

Esse amplo panorama do amor cristão, como fundamento do nosso serviço aos demais, a favor de um desenvolvimento sempre mais humano e ambientalmente sustentável, permite- nos