• Nenhum resultado encontrado

PUBLIC MANAGERS' PERCEPTION OF THE PERFORMANCE MEASUREMENT SYSTEM, WITH EMPHASIS ON THE PERFORMANCE PRISM

N/A
N/A
Protected

Academic year: 2021

Share "PUBLIC MANAGERS' PERCEPTION OF THE PERFORMANCE MEASUREMENT SYSTEM, WITH EMPHASIS ON THE PERFORMANCE PRISM"

Copied!
18
0
0

Texto

Loading

Referências

Documentos relacionados

A extracção de carbono pela água quente pretende estimar a fracção solúvel da matéria orgânica do solo, quantificando uma fracção de C orgânico

If analyzed data for 2007, the growth of companies by number of employees paid the services sector is the one with highest number of firms with high growth both in number

GROWTH is a collaborative project among California Institute of Technology (USA), University of Maryland College Park (USA), University of Wisconsin– Milwaukee (USA), Texas

The probability of attending school four our group of interest in this region increased by 6.5 percentage points after the expansion of the Bolsa Família program in 2007 and

In this work, different PQ instruments were subjected to the same tests condition in a laboratory and their performance were evaluated comparing the obtained values,

Esse entendimento é muito diferente de afirmar-se que o País vive em um Estado Permanente de Ponderação, com ausência de segurança sobre a hierarquização

velopment stage (V3), the dr of treatments varied betweert 40% below and 14% above the check (Tabte 2), indicating that: a) the plant was unable to react âdequately to

Espectro Raman do monocristal orientado do sal L7H2, para a geometria de espalhamento x(zz)x... Neste capítulo, faremos agora uma discussão integrada sobre as