• Nenhum resultado encontrado

Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand under permissible delay in payments: A new approach

N/A
N/A
Protected

Academic year: 2017

Share "Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand under permissible delay in payments: A new approach"

Copied!
22
0
0

Texto

Loading

Imagem

Fig. 1.   α-cut of a triangular fuzzy number  When  k 1 = k 2 = k 3 = k  , we have fuzzy point ( , , )k k k = k 
Fig. 2. Inventory level at any time
Fig. 3. Interest earned in scenario 1.1.1.1. (a) Fig. 4. Interest payable in scenario 1.1.1.1
Fig. 7. Interest earned in scenario 1.1.1.2 Fig. 8. Interest payable in scenario 1.1.1.2 The interest earned on accumulated amountW for the time period  [ M B, 3 ] =   WI e ( B 3 − M )
+5

Referências

Documentos relacionados

Desse modo, a ideia de aprendizagem docente constitui-se como elemento basilar da pedagogia universitária, na medida em que se consolida a partir da articulação entre modos de ensinar

Pricing and inventory control policy for non-instantaneous deteriorating items with time- and price-dependent demand and partial backlogging.. Hiwa Farughi a* , Narges Khanlarzade b

Finally, demand functions and their elasticities are calculated for two different cases: one considering five groups of animal proteins (Chicken; Milk and Eggs; Fish;

In this paper, we have extended their model by incorporating the following realistic facts: (1) an ending – inventory to be positive or zero, (2) limited floor space, (3) a

Under constant Weibull deteriorating parameters  ,  and the allowable credit period T 1 , the increase in the rate of inflation enhances the optimum cycle

We consider the impact of safety factor on the continuous review inventory model involving controllable lead time and backorder price discount with mixture of

This paper has presented production-inventory models for deteriorating items having varying demand patterns with Weibull-distribution deterioration and partial backlogging under

A multi-period model was developed to obtain optimal replenishment schedules for such items using a general ramp-type demand pattern that allows for three-phase variation in