• Nenhum resultado encontrado

COMO FAZER UMA PROPOSTA PARA O GEMINI

N/A
N/A
Protected

Academic year: 2021

Share "COMO FAZER UMA PROPOSTA PARA O GEMINI"

Copied!
56
0
0

Texto

(1)

Mini-Workshop

COMO FAZER UMA PROPOSTA

PARA O GEMINI

Marília J. Sartori (LNA)

(2)



Chamada para Propostas 2010B



Instrumentos oferecidos



Destaques

COMO FAZER UMA PROPOSTA PARA O GEMINI



Tempo disponível (fila, intercâmbio) - Novas regras



Programa

Phase I Tool

(PIT):



Alvos: AR



Condições observacionais

(3)

Instrumentos disponíveis



Gemini Norte

Instrumento

Instrumento DescriçãoDescrição

GMOS-N Imageador e espectrógrafo no óptico: fenda longa, multi-objeto e campo integral

GMOS-N

e campo integral

NIRI Imageador e espectrógrafo de baixa resolução no IV próximo NIFS Espectrógrafo de campo integral (IFU) no IV próximo

Altair

Sistema de óptica adaptativa, oferecido para imageamento e espectroscopia com NIRI e NIFS

(4)

Optical Imaging

 5.5'x5.5' FOV; 0.073” pixels  Broad (ugriz) and NB filters Spectroscopy

 R ~ 600 – 4400

 Long-slit: 0.25 – 5.0” wide slits; 108” and 330” long.

GMOS: Gemini Multi-Object Spectrograph

(GN&GS)

and 330” long.

 Multi-slit: ~60 0.5”+ slits are possible.  IFU: 5”x7” 1000 element science +

500 elements for sky. Detectors

 3 E2V 2048x4608 pixels

 Planning now for GMOS-North

upgrade to Hamamatsu CCDs in about 6 months.

(5)

Imaging

 f/6 0.12”/pix 120” FOV (natural seeing)  f/14 0.05”/pix 51” FOV (L band, AO)  f/32 0.02”/pix 22” FOV (M band, AO)  1 to 5 µm Y,J,H,K,L,M +NB filters

HR 8799 b, c, d HR8799 family of planets

NIRI: Near-IR Imager

 1 to 5 µm Y,J,H,K,L,M +NB filters

 Seeing-limited and Altair NGS/LGS AO Spectroscopy

 R ~ 450-1650 single long slit  f/6: 0.2-0.8” x 50-110” slits  f/32: 0.1-0.2 x 22” slits

 ALADDIN-2 detector  1024x1024 pixels  0.9 to 5.5 µm

(6)

Integral Field Spectroscopy

 Image slicer w/ 29 slices

 3”x3” field

 ~70 detector pixels along each

slice

NIFS: Near-IR Integral Field Spectrometer

slice

 Spaxels ~0.1”x0.04”

 R ~ 5000

 z ,J ,H, K bands

HAWAII-2RG detector

 2048x2048 pixels

 0.9 – 2.5μm

(7)

Altair Adaptive Optics

 177 element DM, 10 W sodium laser

 LGS science operations ~1 to 2 weeks/month

(resource limited)

 NGS Strehl 0.2 to 0.4 (best at H, K)

 LGS Strehl ~0.3 at 2.2 µm (FWHM = 0.083”),

PSF stable for a month at a time PSF stable for a month at a time

 LGS sky coverage ~40% (4% for NGS)

 Working to increase sky coverage and reduce

(8)

Detector

 7 – 26 μm

 320x240 Si:As IBC array

 Chopping and nodding

MICHELLE: Mid-IR Echelle Spectrometer

 Chopping and nodding

(15” chop throw)

Imaging

 FOV 32”x24”; 0.1” pixels

 FWHM ~0.3” at 10 μm

Spectroscopy

 R ~100 – 3000 long slit

 R ~10,000 – 30,000 echelle

 Slits 0.36”-1.3” wide x 43.2”

(9)

Instrumentos disponíveis



Gemini Sul

Instrumento

Instrumento DescriçãoDescrição

GMOS-S Imageador e espectrógrafo óptico: fenda longa, multi-objeto e campo integral

GMOS-S

campo integral

Phoenix Espectrógrafo echelle de alta resolução no IV próximo (1-5µm) NICI Imageador coronográfico de duplo canal no IV próximo (1-5µm) T-ReCS Imageador e espectrógrafo de fenda longa no IV médio

(10)

Long slit echelle spectrograph



4 pix slit R~50,000



3 pix slit R~65,000



2 pix slit R~80,000

Phoenix: Near-IR Spectrograph

Resolving velocity



2 pix slit R~80,000



∆λ: 0.005*λ, 1500 km/s (not

cross-dispersed)



21 order sorting filters

Aladdin-2 detector



1024x512 pixels



0.9-5.5 μm

(11)

85 element curvature AO system

 Strehl ratio: up to 40% at 1.6μm



Lyot coronagraph

Dual channel imager

 2 Aladdin-2 1024x1024 arrays

NICI: Near IR Coronagraphic Imager

 2 Aladdin-2 1024x1024 arrays

 FOV: 18”x18”; 18mas/pixel

 0.9 – 5.5μm

 Filters: J-M, NB, and specialized

1.6μm methane filters

 Spectral and angular differential

imaging for planet searches

Contrast >10

6

inside 1-2”

FeII/BrG/H2 composite of Eta Carina

(Image courtesy Kris Davidson)

(12)

Detector

 320x240 Raytheon SBRC

 5-28μm

 Chop and Nod (15” chop throw)

T-ReCS: Thermal Region

Camera+Spectrograph

(13)

Intercâmbio de tempo

Observatório

Observatório InstrumentoInstrumento DescriçãoDescrição

Keck HIRES Espectrógrafo óptico echelle de alta resolução COMICS Câmara e espectrógrafo no infravermelho médio

Subaru

COMICS Câmara e espectrógrafo no infravermelho médio FOCAS Câmara e espectrógrafo óptico de fontes fracas HDS Espectrógrafo óptico de alta dispersão

IRCS Câmara e espectrógrafo infravermelho

MOIRCS Imageador e espectrógrafo multi-objeto no IV próximo

(14)

Chamada para Propostas 2010B



Período: 01/08/2010 – 31/01/2011

Data limite para submissão das propostas 31/03/2010

Reunião da NTAC 28/04/2010

Reunião da ITAC 26-27/05/2010

Reunião da ITAC 26-27/05/2010

Esqueletos dos programas disponíveis para Fase II 14/06/2010 Início da revisão da Fase II - 7 dias é o prazo esperado

para resposta pelos NGOs (a partir de "For Review") e pelos CSs do Gemini (a partir de "For Activation").

02/07/2010 Data limite para submissão do detalhamento dos

(15)



Gemini Norte:

60 horas

= 4,2% fração efetiva

Destaques para 2010B



60 horas

= 4,2% fração efetiva



Gemini Sul

(16)

Destaques para 2010B



Regras para propostas estabelecidas pela NTAC

(http://www.lna.br/gemini/ngo/GemNTAC.html)



A NTAC NÃO MAIS IMPÕE LIMITES AO TAMANHO

(17)

Destaques para 2010B

 Regras para Propostas (http://www.lna.br/gemini/ngo/GemNTAC.html)

 A NTAC não impõe limite ao tamanho das propostas. Recomenda, contudo, que a distribuição de horas entre as bandas científicas seja seguida como limitação de tamanho: aproximadamente 30%, 30% e 40% para as Bandas 1, 2 e 3, respectivamente.

e 40% para as Bandas 1, 2 e 3, respectivamente.

(18)



Keck: até 5 noites no modo clássico



noites inteiras pré-agendadas - min. 1 e max. 2 noites em

qualquer das janelas:

 17--30/08/10 - 16--27/10/10 - 14--25/12/10

Intercâmbio de tempo

 17--30/08/10 - 16--27/10/10 - 14--25/12/10

 Todas as propostas para tempo no Keck devem também

completar a Keck cover page. Envie esta página por e-mail para o presidente da NTAC.



mais informações:

http://www.gemini.edu/sciops/observing-

(19)



Subaru: 5 a 10 noites no modo clássico



noites inteiras pré-agendadas - min. 1 e max. 4 noites em

qualquer das janelas abaixo:

 tempo brilhante: 17--26/10 ou 16--24/12/10

Intercâmbio de tempo

 tempo brilhante: 17--26/10 ou 16--24/12/10  cinza: 11--15/12/10

 escuro: 02--08/11 ou 06/01/11



Os programas em modo clássico são geralmente de noites

(20)



The Keck and Subaru TACs requested

1 and 5 nights of exchange

time on Gemini, respectively

, to use GMOS-North (1 night),

Michelle (2 nights), NIRI (1 night) and TReCS (2 nights).



Only the US and the UK forwarded exchange proposals from the

Intercâmbio de tempo em 2010A

Only the US and the UK forwarded exchange proposals from the

NTACs to ITAC, and the 6 available nights were filled by

proposals in the

top third of their programs

.



The successful proposals use HIRES and Suprime-Cam. More

instruments were offered in 10A for the Subaru exchange time,

and there were requests for HDS as well as Suprime-Cam and

MOIRCS. The dark March and April nights on Subaru were very

heavily oversubscribed.

(21)



O GMOS-Norte deverá ter disponível os

novos CCDs sensíveis no

vermelho

a partir de

1 de dezembro de 2010

.

 São bem-vindas as propostas que podem aproveitar a melhoria da resposta no vermelho e os novos filtros Z e Y, para alvos com 2h < AR <13,5h. Propostas para as quais a melhoria da resposta no

Destaques para 2010B

AR <13,5h. Propostas para as quais a melhoria da resposta no vermelho seja necessária, não devem ser submetidas para alvos com 17h < AR < 2h.

 A Calculadora de Tempos de Integração (ITC) está disponível tanto para os novos quanto para os antigos detectores. Os tempos

(22)
(23)

 As páginas web do Gemini sobre instrumentação

 Phase I Tool (PIT) - para preparar e submeter a proposta (usar

exclusivamente a versão atual) http://www.gemini.edu/sciops/instruments/?q=sciops/instruments

 Instruções para instalação

http://www.gemini.edu/sciops/observing-with-gemini-new/phase-i-and-s/w-tools/phase-i-tool-pit?q=node/11088

Principais ferramentas para preparar

uma proposta

new/phase-i-and-s/w-tools/phase-i-tool-pit?q=node/11088

 Arquivos para instalação disponíveis na página web do Gemini: semestre 2010B http://files.gemini.edu/~software/phase1/

 Veja também a relação das modificações efetuadas na versão atual

http://www.gemini.edu/sciops/observing-with-gemini-new/phase-i-and-s/w-tools/phase-i-tool-pit?q=node/11085

 Siga as instruções de preenchimento do Cookbook

(24)



Gemini HelpDesk

- para qualquer tipo de dúvida sobre os

instrumentos ou sobre as propostas

http://www.gemini.edu/sciops/helpdesk/?q=sciops/helpdesk



Calculadoras de tempo de integração (

ITC

)

Principais ferramentas para preparar

uma proposta

Calculadoras de tempo de integração (

ITC

)

http://www.gemini.edu/sciops/instruments/integration-time-calculators



Listas de checagem

para o conteúdo das propostas

 NTAC/BrGO (nova): http://www.lna.br/gemini/ngo/GemPIT.html

(25)



Atualizado para 2010B



Mais informações:

http://www.gemini.edu/sciops/observing-with-gemini/proposal-submission/phase-i-tool-pit



A partir de 2010B,

limites de palavras

estão sendo

Phase I Tool (PIT)



A partir de 2010B,

limites de palavras

estão sendo

impostos para todos os parceiros:



Abstract

=

200 palavras



Scientific Justification

=

1000 palavras



Technical Justification

=

1000 palavras

(26)



Phase I Tool (PIT)



Science justification



Instrument configuration

(27)

Estratégias para Propostas



Redes GMOS

 Consultar “GMOS grating – demand and execution” para verificar se a rede escolhida é usualmente utilizada

(28)
(29)

Estratégias para Propostas



Limites de acessibilidade dos alvos



Confira primeiro os limites de acessibilidade aos alvos para

2010B

 Gemini Norte: os alvos devem estar limitados às coordenadas

17h < AR < 13,5h e -37 < dec < +79 17h < AR < 13,5h e -37 < dec < +79

 Gemini Sul: os alvos devem estar limitados às coordenadas 16h

< AR < 12h e -89 < dec < +28



Há restrições adicionais para os programas que requerem

acesso irrestrito (por exemplo, observações MOS que exigem

pré-imagem, observações longas ou observações com

restrições rigorosas).



O "Laser Guide System" (LGS) no Gemini Norte tem uma

(30)

Estratégias para Propostas



Limites de acessibilidade dos alvos

 Michelle provavelmente só estará disponível para dois períodos

curtos durante o semestre 2010B, dependendo da demanda (a faixa de AR dos alvos não foi limitada previamente).

 Phoenix e T-ReCS provavelmente não estarão disponíveis no final do  Phoenix e T-ReCS provavelmente não estarão disponíveis no final do

semestre (depois de novembro de 2010), devido ao comissionamento do MCAO.

 A NTAC recomenda que as propostas para os instrumentos Michelle,

Phoenix e T-ReCS considerem também alvos alternativos, para o caso da proposta ser aprovada mas a demanda geral determinar a

disponibilidade do instrumento em época inacessível aos alvos prioritários.

(31)

Estratégias para Propostas



Distribuição de AR

 Consultar “Science Operations Statistics: RA distributions”

(32)



Phase I Tool (PIT)



Science justification



Instrument configuration



Target list

Phase I process



Target list



Technical Justification



ObsTime and Conditions are proxy for the actual metrics

(S/N, depth, etc)  integrating for the requested time

under the requested conditions will result in the requested

metrics.



Observing time and worse possible condition constraints so

(33)



There are four observing constraints:



Cloud cover (sky transparency)



Image quality (delivered EED)



Sky background

Observing Constraints



Sky background



Water vapour content (sky transparency)



Must also consider

airmass

(zenith distance) as it affects some of

the above.



Some of those are

wavelength dependent

(e.g. water vapour

content).



Given in percentiles: IQ =20%, 70%, 85%, Any

(34)



The percentiles represent the frequency of occurrence (e.g., 50%

of the time is dark or SB=50)



CC, IQ and WV are statistically defined: data from previous

semesters indicate that 20% of the time the image quality in K is

Observing Constraints

semesters indicate that 20% of the time the image quality in K is

0.35arcsec or better; or that 70% of the time we have thin

cirrus/patchy clouds or better conditions.



Conditions are highly seasonal. WV in Cerro Pachon is a factor of

2 higher during summer (Jan-Mar).



So, statistically, we should have IQ=20 20% of the time during

(35)
(36)
(37)
(38)



CC=50% - photometric or cloudless  stable flux (usually

monitored using the guide star counts).



CC=70% - patchy clouds. Transparent patches among thicker

clouds and/or thin cirrus  variable flux, loss of transmission by

Cloud Cover

clouds and/or thin cirrus  variable flux, loss of transmission by

0.3mag relative to nominal extinction. In practice, 25% flux

variation.



CC=90% - cloudy. All sky covered with clouds, transmission

poorer by 2mag relative to nominal, and variable. Stable guiding

may be dificult. Background too high for thermal IR.



Any – whatever else while we can still guide. For the ITCs,

(39)



Falta de programas para CC90 ou condições piores

 OpsWG Action 18.9: (All) improve the promotion of CC90 programs

including long term programs and especially strategic standards programs.

Estratégias para Propostas



O conjunto de propostas do Brasil deve fazer uso de toda a

gama de condições observacionais, como é exigido pelo

Gemini para todos os parceiros, para o preenchimento eficaz

da fila de observações.



A NTAC recomenda que as propostas somente solicitem as

melhores condições possíveis caso extremamente necessário

e por outro lado, se for viável, adotem condições de céu

(40)



Values are for the telescope pointing at zenith. So, 70% of

the time the IQ=0.8˝ or better in I-band at zenith.



But if the target is at AM=1.5, delivered image quality for 70% is

IQ=1.02˝ or better

Image Quality

IQ=1.02˝ or better



Performance degradation is taken into account in the ITCs as a

dependence of wavelength and airmass



In the mid-IR, bins are defined as percent of the time IQ is

within 10/20/50% of the diffraction limit at 10

µ

m.



If program requires absolute image quality, remember to take

into account the elevation when selecting the IQ bin or

(41)
(42)



Sky transparency in thermal IR (L,M and mid-IR).



Atmospheric absorption is strongly wavelength dependent.



ITCs use model transmission spectra with 0.04nm

resolution.

Water Vapour

resolution.



Not relevant in the optical!

(43)



In the optical, created by moonlight and zodiacal light.



In the near-IR, by OH airglow and thermal background

emission. It is colour dependent, but assumed constant.



Only relevant for optical observations

.

Sky Background



Only relevant for optical observations

.



roughly speaking, Moon is below the horizon half the time

in queue mode. Thus SB=50 is dark time.



for queue scheduling purposes, the computed background

on a given night takes into account relative position of

(44)

 Observation: todo o processo de apontamento para o alvo (telescope

setup), reconfiguração do telescópio e do instrumento, aquisição do alvo, integração, readout, avaliação da qualidade dos dados e

calibração.

 exposições através de diferentes filtros e dithering/offsetting são partes de

Observation

 exposições através de diferentes filtros e dithering/offsetting são partes de

uma mesma observação

 observações do mesmo alvo com parâmetros instrumentais diferentes, por

(45)



O tempo total on-source depende do caso científico, mas

inclui todos os

overheads

:

 tempo de setup do telescópio

 tempo de configuração do instrumento

Overheads

 tempo de configuração do instrumento  tempo de readout de cada exposição

 tempo para mudança de filtros, redes, etc.  tempo de offsetting do telescópio

 eventuais observações de calibração (que forem necessárias, além das baseline calibrations)

(46)



New acquistion:



“Applicants for GMOS time should allow for

one

acquisition

for approximately

every 3 hours observed

(including overheads and calibrations).”

Overheads

(including overheads and calibrations).”



NIFS: “Long observations may be split over several

nights to better accommodate them in the queue. Please

allow for

one acquisition

for

every 1.5 - 2 hours

of

(47)



Airmass restrictions must be clearly stated in PhaseI or

will require approval from the corresponding site Head of

Science Operations.



Airmass/Elevation constraints are used to preserve

Phase I Constraints



Airmass/Elevation constraints are used to preserve

delivered IQ or reduce atmospheric diffraction effects.



Improving constraint bins also require approval. Relaxing

constraints do not (check your science!)

(48)



Todas as observações requerem uma estrela de guiagem

(

wavefront sensor (WFS) star

).



Como a viabilidade técnica de uma proposta depende em

parte da disponibilidade de estrelas WFS, todas as propostas

Estrela de Guiagem

parte da disponibilidade de estrelas WFS, todas as propostas

com alvos definidos devem incluir estrelas WFS adequadas.



Guide star brightness must be appropriate for

conditions.



Recomendação para GMOS:



use OIWFS for all observations, except

(49)

 Resumo e justificativa dos recursos observacionais (instrumento, dispersores, filtros, fendas).

 Justificativa da escolha das observational constraints.

 Resumo dos cálculos de tempos de exposição, incluindo os overheads.

Technical Justification

 Justificativa dos parâmetros de entrada da calculadora de tempo de integração (ITC), inclusive da razão S/R.

 As calibrações necessárias - caso as básicas (baseline calibrations) fornecidas pelo Gemini sejam suficientes, confirmar explicitamente, caso contrário, justificar as calibrações adicionais necessárias.

(50)



Calculadora de tempo de integração (ITC):



Anexar à proposta cópias das páginas web com a

resposta da ITC, em formato pdf.

Os gráficos da resposta da ITC (

Signal and

Technical Justification



Os gráficos da resposta da ITC (

Signal and

Background

e S/N) em ascii (arquivo txt) não são

úteis para a avaliação da comissão e não são

(51)



aba

Band 3

do PIT



serve para especificar como o programa pode ser

otimizado

para ser executado nesta banda.

Isto não significa que as condições observacionais devam ser

Banda 3

 Isto não significa que as condições observacionais devam ser

necessariamente relaxadas, mas que existe esse recurso caso elas possam ser relaxadas e isto for realmente necessário para aumentar as chances de ter o programa executado. Ver Advice for Band 3

Programs :

 IQ=85, CC=70 has a good chance of getting data (more than

70% of executed Band 3 observations are taken in IQ=85 or worse)

 IQ=70, CC=70 has some chance

 IQ=70 or better, CC=50 or better has little chance of getting

(52)

Aba

Band 3

Deve-se escolher a

resposta (

Yes

ou

No

)

para a pergunta

"

Consider this proposal

"

Consider this proposal

for band 3 if time

(53)

 Deve-se responder Yes, quando a proposta pode ser executada nesta banda, caso não seja classificada nas bandas 1 ou 2. Esta resposta não influencia a classificação da proposta no ranking científico, significa

apenas que ela poderá ser executada caso tenha sido classificada em banda 3.

Aba

Band 3

banda 3.

 Deve-se completar o tempo de execução mínimo em banda 3 (“Minimum Required Time”), que pode ser o mesmo da proposta padrão caso não sejam feitas modificações nas condições

observacionais ou outro tipo de modificação técnica.

 Deve-se também prencher o tempo total requisitado em banda 3 (“Total Requested Time”), no caso de ser diferente da proposta

(54)

 Deve-se especificar as condições observacionais para a execução em banda 3 (as codições Any/Any/ Any/Any não são válidas para a grande maioria dos programas). Havendo alterações viáveis de

otimização do programa, deve-se assinalar as condições

observacionais específicas para a banda 3. Caso não seja possível

Aba

Band 3

observacionais específicas para a banda 3. Caso não seja possível e/ou útil para o programa alterar as condições observacionais, então usando o botão “Set to Default Constraints”, as condições são

alteradas de Any/Any/ Any/Any para as “Global Default” definidas na aba Observations.

 No campo "Band 3 Consideration Text" deve-se justificar como os objetivos científicos propostos podem ainda ser alcançados com as

(55)



Deve-se responder

No

se a proposta se encaixar em

alguma das seguintes situações:

 condições observacionais muito rígidas  programa “time-critical”

Aba

Band 3

 programa “time-critical”  uso do sistema LGS.

(56)

Visitas ao Gemini



Gemini recebe visitantes em ambos os sítios, tanto para

interações com o

staff

nos escritórios como para

participação nas operações da fila



Tipo de visitantes:

 representantes dos NGOs 

 estudantes associados a programas em filaestudantes associados a programas em fila 

 PIsPIs/co/co--Is de programas em filaIs de programas em fila

 estudantes de graduação e pós como estagiários 

Recursos:

 LNA: passagem aérea para estudantes

Referências

Documentos relacionados

Há a possibilidade de escolher a coligada em que se está logado para exibir dados, caso não seja selecionada os dados considerarão todas as coligadas1. Em seguida, será gerado

logia avançada, com grande competição no mercado, tal como os de telecomunicações, para privilegiar-se dos ganhos de eficiência das operadoras, mantendo-se, tanto quanto possível,

Assim, a degradação dos fármacos em altas concentrações (25 mg L -1 ) por processo foto-Fenton mostrou-se mais eficiente tanto na degradação destes, bem como na

Fresh Mozzarella Cheese, ripe Tomato, Lettuce bouquet and Pesto sauce O queijo que vem de Itália….

◦ Deve-se também prencher o tempo total requisitado em banda 3 (“ Total Requested Time ”), no caso de ser diferente da proposta padrão, assinalando o botão “ Edit value ” (é

Quando prescrito pelas instruções de regata, a comissão de protestos pode penalizar sem audiência um barco que tenha infringido a regra 42, desde que um membro da

Sendo assim, o estudo da prática desses músicos pode muitas vezes atuar como um modelo, servindo como parâmetro para o ensino do instrumento, ou para, como é nosso

As ever, there is some suggestion that changes and revision are more likely to happen to prologues and epilogues than to other parts of the play text; but as with songs,