• Nenhum resultado encontrado

Vehicle routing and tour planning problem: a cement industry case study

N/A
N/A
Protected

Academic year: 2020

Share "Vehicle routing and tour planning problem: a cement industry case study"

Copied!
141
0
0

Texto

Loading

Imagem

Table 1 - TSP Solving Methods.
Figure 2 - Examples of the SOP (right) and the TSPPC (left).
Figure 3 - Best route at time t 0. Figure 4 - Best route at time t 1.
Figure 4 - Two routes example for the All or Nothing Assignment.
+7

Referências

Documentos relacionados

The patient’s height is re- portedly a more reliable guide for obtaining an appropriate ureteral stent length than direct ure- teral measurement using a guide wire and ureteral

It is important to note also that in 5 out of 10 stocks, the p-values of the t -tests of the 5-150 moving average strategy show that the difference between mean buys and (or)

Por fim, no que diz respeito à questão “Desde o início do ano lectivo anterior quantas vezes teve uma atividade sexual não desejada, porque a outra pessoa usou força física (torceu

Primeiramente devem ser determinadas as grandezas que envolvem o experimento, os valores obtidos para cada grandeza e a incerteza de cada instrumento utilizado na

Conclusão: Sob essa óptica, altos índices de gravidez em idade precoce se apresenta como um problema de saúde pública ainda fortemente presente no Brasil, o qual está

Engenheira Sanitarista, Especialista em Engenharia de Segurança no Trabalho, Mestra em Engenharia Civil com ênfase em Recursos Hídricos e Saneamento Ambiental Instituição:

The aim of the present study was to eva- luate the presence of OAB syndrome, nocturia, urgency, and urge incontinence in patients with mild, moderate and severe OSAS, and measure

In the vast majority of reported cases, the epithelial component is essen- tially high-grade urothelial cell carcinoma, while the sarcomatous constituents can consist of