• Nenhum resultado encontrado

Designing an advanced available-to-promise mechanism compatible with the make-to-forecast production systems through integrating inventory allocation and job shop scheduling with due dates and weighted earliness/tardiness cost

N/A
N/A
Protected

Academic year: 2017

Share "Designing an advanced available-to-promise mechanism compatible with the make-to-forecast production systems through integrating inventory allocation and job shop scheduling with due dates and weighted earliness/tardiness cost"

Copied!
12
0
0

Texto

Loading

Imagem

Fig. 2. Interruptions in machine idle time

Referências

Documentos relacionados

A partir da escolha do tema, foi possível concluir que a fiscalização é um importante mecanismo para prevenir a prática de ilícitos, sendo o meio adequado para

To illustrate the ability of the benchmark to facilitate the comparison of various scheduling & control approaches, the same data set has been chosen (C0) and the same

Com isso, destaca-se a importância dos fatores pessoais como a criatividade, alinhados a fatores organizacionais, como a autonomia, que promovem uma cultura

Os m étodos físicos (capina manual ou m ecânica) predom inaram sobre os demais m étodos durante m uito tem po.. Os im plem entos m ecânicos tradicionais ou novos

No merecimento da vítima pela situação, o efeito de interacção revelou que para os participantes com uma baixa crença no mundo justo geral, na condição estudante (vítima do

O Estado de Santa Catarina possui aproximadamente 1.259.081 hectares de formações naturais campestres. Esse ecossistema apresenta uma alta diversidade de espécies

Lee and Kim [17] developed a parallel genetic algorithm for solving the problem of scheduling jobs for general earliness and tardiness penalties with a common due date..

Iniciando a análise dos resultados presentes na Tabela 3 por meio do que ocorre com a variável raça/cor, é possível notar semelhanças com as descritivas no sentido de