Table 1. Cost of rework in relation to the total costs of the enterprises.
Figure 1 presents a schematic of the criteria and  alternatives of methodologies adopted for rework  measurement in civil construction.
Figure 2. Classiication of causes of rework according to COAA. Source: COAA (2006).
Figure 5. Suggestion of causes of rework. Source: Fayek et al. (2004).
+4

Referências

Documentos relacionados

This paper proposes a new Fuzzy Goal Programming (FGP) model to handle the process of capital budget of companies in an economic environment under uncertainty.. For performance

Through case studies we have sought to take account of the interdisciplinarity of Management Science and Information Science in the study of strategic alignment, based on

To identify the environmental impacts, we have developed questions about general aspects as key inputs, machinery and equipment, quality control, maintenance, stock and

Preference-ranking model for a quality evaluation of hospital web sites (Bilsel et al., 2006); decision process for selecting external consultant in TQM program in small and

Therefore, this work uses an MIP model to represent the programming and scheduling sugarcane harvesting front problem and proposes heuristic methods to solve this problem in

The operation of the Bench Tests, employees on the production line is based on the performance test, aligned as described by Pereira (2009), being performed with speed variation

The following 13 themes were identiied: Project Management Ofice (PMO), Skills, Strategic Communities, Project Performance, Success Factors, Managers Projects, Innovation,

It should be noted that most of the articles that adopted indicators mentioned by managers and based on the literature, presented several measures of performance evaluation, and