30
0
0

Texto

(1)
(2)

SAO PAULO, BRAZIL AND

SOUTH AMERICA

Area (km²)¹

Population

(thousand inhab)²

% Population

Brazil

8.514.877

183.987

-Sao Paulo

248.210

39.827

21,65%

RMSP

7.944

19.221

10,44%

Sao Paulo State

¹ IBGE – Res 05 , October 2002 ² Estimated Population – IBGE, 2007

(3)

METROPOLITAN REGIONS

Campinas Metropolitan Region

São Paulo Metropolitan Region

Baixada Santista

Metropolitan Region

Sao Paulo State

39 cities

19,2 million inhabitants*

9 cities

1,6 million inhabitants *

19 cities

2,6 million

inhabitants *

(4)

AREA OF OPERATION

São Paulo State Metropolitan Regions:

 São Paulo 39 cities, 19.5 million inhabitants

 Campinas 19 cities, 2.6 million inhabitants

 Baixada Santista 9 cities, 1.6 million inhabitants

São Paulo State Metropolitan Transportation Authority

Metropolitan mass transit system, including rail rapid transit.

Companies linked to the São Paulo State Metropolitan Transportation

Authority (STM):

 São Paulo Subway – Metrô

(Companhia do Metropolitano de São Paulo - Metrô)

 São Paulo Metropolitan Train Company – CPTM

(Companhia Paulista de Trens Metropolitanos – CPTM)

 Metropolitan Urban Transport Company – EMTU

(Empresa Metropolitana de Transportes Urbanos de São Paulo)

(5)

METROPOLITAN

TRANSPORTATION NETWORK

CPTM

METRÔ

EMTU

22 cities

São Paulo city

67 cities

(3 Metropolitan Regions)

2 million

passengers/day

3.4 million

passengers/day

2 million

passengers/day

262 km network

61 km network

33 km BRT Corridor

5,380 Bus fleet

6 lines

4 lines

844 lines

(6)
(7)

EXPANSION PLAN:

STM´s KEY DRIVERS

Improving the commuter rail system to 240 km with Metrô quality standard

Increasing the fleet: 107 new trainsets (47 Metrô / 60 CPTM)

Refurbishing the existing train fleet

Rationalizing the Metropolitan Bus System

Developing new bus corridors – BRT

(8)

INVESTMENT PROGRAM

R$ 20 billion

(9)

Suzano Grajaú Rio Grande da Serra EL Francisco Morato Mauá Ea Guaianazes 11 7 9 10 12 Luz Brás EA 13 8 6 Paraíso São Mateus Jabaquara Ferrazópolis São Bernardo Capão Redondo Santo André Alto do Ipiranga Autódromo Tucuruvi Paulista Palmeiras Barra Funda Freguesia Taboão Aeroporto

Zezinho Magalhães (Cecap)

(10)

Oratório /

Pq. São Lucas

+ 100 thousand

Passengers per day

in 2010

(extension)

Extension –

design

phase

2,3 km

Sacomã

Section

in Operation

Under

Construction

3,9 km

Vila

Prudente

Tamanduateí

Sacomã:

Transfer with Tiradentes

Express and EMTU

Daily Ridership

Today: 380 thousand

2010: 800 thousand

(11)

Luz República Higienópolis-Mackenzie Oscar Freire Fradique Coutinho Faria Lima Pinheiros Butantã Vila Sônia

São Paulo – Morumbi

Paulista

1st Phase

2nd Phase

Transfer with

Emerald Line

705 thousand Passengers

per day in 2010 (1st phase)

Transfer with

Blue, Red and Green

(12)

Capão Redondo

Campo Limpo

Vila das Belezas

Santo Amaro Largo Treze

Adolfo Pinheiro Borba Gato

Brooklin – Campo Belo Ibirapuera Água Espraiada Giovani Gronchi Moema Servidor Vila Clementino Chácara Klabin

Line in

Operation

Design Phase

5,7 km

Alto da Boa Vista

Daily Ridership

Today: 106 thousand

2010: 286 thousand

Integration

with Blue and

(13)

Design Phase

19 km

Integration with

Blue, Yellow, Ruby and

Diamond Lines

651 thousand

passengers transported

per day in 2014

LINE 6 – ORANGE (Project)

(14)

Saúde

Conceição

CONGONHAS AIRPORT TRAMWAY

(15)

Metrô standard:

Reliability

Safety (Signaling)

Speed (up to 5 min.

headway reduction,

more than doubling

service offer)

Station quality

Train quality

SURFACE RAIL RAPID SYSTEM UPGRADE

(16)

Mauá

Luz

Guapituba

Ribeirão PIres

(17)

Passengers transported

Luz – Guaianazes (today): 250 thousand/ day

Luz – Ferraz: 395 thousand/day

LINE 11 – CORAL - EAST EXPRESS

AND LIGHT METRÔ - FERRAZ / MOGI

(18)

BRÁS TATUAPÉ

LUZ

CECAP TPS 1 e 2 TPS 3 PENHA ENGº GOULART

USP LESTE COM. ERMELINO

Design Phase

28,1 km

CECAP:

Transfer with

Guarulhos – São Paulo

BRT corridor

Airport Express:

20 thousand passengers

transported per day

Design Phase

20,2 km

Jade Line:

106 thousand passengers

transported per day

Sapphire Line (existing)

(19)

INTEGRATED METROPOLITAN TRANSPORT

SYSTEM – BAIXADA SANTISTA

Linha A – Tramway

Linha B – BRT Corridor

Bus regular lines EMTU (integrated)

TERMINAL

BARREIROS TERMINALPORTO

(20)

Transfer with Jade

Line (CPTM trains)

Est. Tucuruvi METRÔ Term. Vila Galvão

Term. Emílio Ribas

Term. Antonio de Souza Term. CECAP Term. Taboão Município de São Paulo Município de Guarulhos Term Intermodal

140 thousand passengers

transported per day

Transfer with Blue

Line (subway)

Design Phase

22,5 km

(21)

NORTHWEST CORRIDOR – CAMPINAS

Under

Construction

32,7 km

Design

Phase

(22)

60 NEW TRAINSETS BY 2010

CPTM

(23)

47 NEW TRAINSETS BY 2010

Metrô

1st NEW TRAIN

In operation

(24)

PPP LINE 8 – DIAMOND:

REFURBISHING AND NEW TRAINS

3 TRAINS

REFURBISHED

BY 2010

Refurbishing of 12 trains:

Air conditioning

Increasing Motorization

24 New Trains

Public-Private

Partnership:

20 years of contract

Preventive and Corrective

(25)

REFURBISHING OF

CPTM TRAINSETS

(26)

REFURBISHING OF

CPTM TRAINSETS

(27)

REFURBISHING OF

METRÔ TRAINS

REFURBISHING OF TRAINS

LINES 1 and 3

(28)

HEADWAY REDUCTION

LINE

CURRENT HEADWAY

2010 HEADWAY

Line 1 – Blue

109 sec

95 sec

Line 2 – Green

150 sec

128 sec

Line 3 – Red

101 sec

80 sec

Line 4 – Yellow

-

131 sec

Line 5 – Lilac

307 sec

208 sec

Line 7 – Ruby

10 min

4 min

Line 8 – Diamond

9 min

5 min

Line 9 – Emerald

7 min

4 min

Line 10 – Turquoise

10 min

6 min

ABC Express (Line 10 – Turquoise)

-

8 min

Line 11 – Coral

11 min

8 min

East Express (Line 11 – Coral)

7 min

5 min

Line 12 – Sapphire

11 min

4 min

Line 13 – Jade

-

10 min

(29)

TRAVEL TIME GAIN

Routes

Current Time

Time Gain

(minutes/day)

(minutes/day)

Butantã

Luz

120

90

Capão Redondo

S

é

198

54

Graja

ú

Campo Belo

200

114

Graja

ú

Cl

ínicas

244

142

Graja

ú

S

é

244

128

Itaquera

Pinheiros

118

40

Lapa

Pinheiros

76

34

Tucuruv

í

Pinheiros

100

44

USP Leste

Pinheiros

128

62

Vila Prudente

Jabaquara

100

44

Vila Prudente

Pinheiros

166

114

Vila Prudente

S

é

80

40

Diadema

Vila Prudente

200

118

Francisco Morato

Paulista

192

62

Guarulhos

Tucuruvi

167

89

Itapevi

Paulista

166

46

Itaquaquecetuba

S

é

160

30

Perus

Pinheiros

106

32

Po

á

Luz

122

30

(30)

Referências

Documentos relacionados

2 ª RESERVA DE RECRUTAMENTO LISTA DEFINITIVA DE NÃO COLOCAÇÃO CANDIDATOS À

05/11/12 Participei do VIII Congresso da Federação de UPH do Presbitério de São Caetano do Sul na IP de Utinga em Santo André.. 12/01/13 Participei de uma Palestra da Federação na

• Abrangência geográfica: São Paulo, Santo André, São Bernardo do Campo, São Caetano do Sul, Osasco, Guarulhos, Santos, Praia Grande, Guarujá, Rio de Janeiro, Niterói,

Promptly, at ( τ − 2 ) , there is a reduction of 4.65 thousand hectares in soybean harvested area (statistically significant at the 1% level), an increase of 6.82 thousand hectares

Pires, Rio Grande da Serra, Salesópolis, Santa Isabel, Santana de Parnaíba, Santo André, São Bernardo do Campo, São Caetano do Sul, São Lourenço da Serra, São Paulo, Suzano,

; CADASTRAMENTO INTEGRAL DO Nº DO MOTOR, SE NECREGULARIZAÇÕES P/C DO COMPRADOR / IPVA 2022 PAGO / PRAZO PARA ENTREGA DA DOCUMENTAÇÃO SERÁ DE 30 DIAS ÚTEIS APÓS O

A presença das questões a resolver indica que o livro escolar de geometria dedutiva se modifica e também mostra como as proposições dos teoremas, dadas em sua

Como referiu a senhora deputada Isabel Berbereia, o combate às dependências tem que ser travado por todos, muito além de quaisquer partidarismos, por isso pergunto