(1)

SAFIR2010 SAFIR2010 Finnish

Finnish national national research research programme programme on NPP safety on NPP safety 2007

2007 - - 2010 2010

Prepared by Eija Karita Puska Director of SAFIR2010

www.vtt.fi/safir2010 [email protected]

(2)

SAFIR2010

National research programmes

In Finland

In Finland publicpublic researchresearch is is organisedorganised into into researchresearch programmes

programmes withwith 33--4 4 yearyear durationduration The tradition

The tradition datesdates backback to 1989/1990to 1989/1990 Currently

Currently in nuclearin nuclear powerpower plantplant safety: safety: SAFIR2010 2007

SAFIR2010 2007--2010 ( 6,7 M2010 ( 6,7 M€€ for 2008)for 2008) Currently

Currently in wastein waste management:management:

KYT2010 2006

KYT2010 2006--2010 (appr. 1 M2010 (appr. 1 M€€ for 2008)for 2008)

(3)

SAFIR2010

SAFIR2010

The Finnish Ministry of Trade and Industry (MTI) launched a The Finnish Ministry of Trade and Industry (MTI) launched a new national four

new national four--year research year research programmeprogramme on nuclear power on nuclear power plant safety from 2007 to 2010

plant safety from 2007 to 2010 The research

The research programmeprogramme is strongly based on the chapter 7a, is strongly based on the chapter 7a,

“Ensuring expertise“Ensuring expertise””, of the Finnish Nuclear Energy Act, of the Finnish Nuclear Energy Act

The programmeThe programme is the newest link in chain of public research is the newest link in chain of public research programmes

programmes on nuclear safety that have proved to excel in on nuclear safety that have proved to excel in order to maintain and develop know

order to maintain and develop know--how in Finlandhow in Finland

The programmeThe programme covers essentially the themes of the SAFIRcovers essentially the themes of the SAFIR-- programme

programme 2003-2003-20062006

In addition to the State Nuclear Waste Management Fund In addition to the State Nuclear Waste Management Fund (VYR), also other key

(VYR), also other key organisationsorganisations operating in the area of operating in the area of nuclear safety are funding the

nuclear safety are funding the programmeprogramme Foreign funding possible

Foreign funding possible

(4)

SAFIR2010

Safety challenges for SAFIR2010

Plant design, construction and Plant design, construction and

change management change management

taking science and technology development into account

severe accidents

Safety

Safety assessmentassessment

Deterministic analysis and

experiments (high fuel burn-up, models)

Risk-informed safety management (living PSA

applications, internal and external threats, automation and human factors)

Plant life cycle and comprehensive safety assessment

Plant

Plant life managementlife management

Loviisa 1 and 2 plant units

operation permit application, 50 years operation lifetime

Olkiluoto 1 and 2 plant units

operation permit ~ 40 years age 2018, periodic safety review 2008 Olkiluoto 3 design basis 60 years plant life

Safety culture,

Safety culture, organisationorganisation and and human factors

human factors

assessment method improvement safety management and change management

networking operational environment generation change

new technologies

(5)

SAFIR2010

national research programmes on nuclear power plant safety

To ensureTo ensure the basic preparedness in nuclear safety area in Finland, by the basic preparedness in nuclear safety area in Finland, by ensuring that

ensuring that

That we have the proper expertise That we have the proper methods

To To enhanceenhance the basic preparedness in nuclear safety area in Finland the basic preparedness in nuclear safety area in Finland via education and training in the research projects

via education and training in the research projects

new experts

experienced experts

150 persons working annually in the program, but practically all do also contract work or other projects, since program volume 45-50 person years annually

To act as an important

To act as an important networknetwork

Domestic via the steering and reference group with some 90 persons from the end users (STUK, TVO, Fortum, VTT, others)

International via information and decisions on international projects (OECD/NEA and others)

(6)

SAFIR2010

Organisation and quality management of SAFIR2010

Steering Group

Reference Groups and

ad hoc groups

Projects

Project realisation

SAFIR2010 management handbook

According to

Management system of research organisation Steering and strategic planning

Strategic planning in the area and scientific

quidance

(7)

SAFIR2010

Steering Group of SAFIR2010

Deputy Director Marja-Leena Järvinen, Chairperson, STUK Section Head Keijo Valtonen, STUK

Director Kari Hiltunen, Tekes

Senior Technology Advisor Piia Moilanen, Tekes Technology Manager Timo Vanttola, VTT

Technology Manager Liisa Heikinheimo, VTT Manager Pekka Pyy, TVO

Head of Section Marjo Mustonen, TVO

Manager Sami Hautakangas, Fortum Power & Heat Manager Ritva Korhonen, Fortum Nuclear Services Professor Rainer Salomaa, TKK

Professor Riitta Kyrki-Rajamäki, LTY Counsellor Jaana Avolahtí, KTM

Harri Heimburger, STUK (permanent expert) Jan-Erik Lindbäck, SKI (permanent expert)

Juhani Hyvärinen, Fennovoima (permanent expert)

Senior Engineer Jorma Aurela, KTM contact person, KTM Programme director Eija Karita Puska, secretary, VTT

(8)

SAFIR2010

SAFIR2010 - administration

The organisationThe organisation of the programmeof the programme

Main features similar to SAFIR2003 – 2006

www-pages include also a password-entry for minutes of meetings and other material

www.vtt.fi/safir2010

MTI chose the administrative organisation and the director in December 2005 on basis of an open call for competition

(9)

SAFIR2010

VTT in SAFIR2010

VTT is the coordination unit VTT is the coordination unit

VTT is the main/responsible partner in 26 out of the 30 research VTT is the main/responsible partner in 26 out of the 30 research projects in 2008 (25 out of 30 in 2007)

projects in 2008 (25 out of 30 in 2007) VTT has a key role in the funding of

VTT has a key role in the funding of VTTsVTTs SAFIR projects in SAFIR projects in 2008 with 2,48 M

2008 with 2,48 M €€ (2,37 M €(2,37 M € in 2007)in 2007)

(10)

SAFIR2010

SAFIR2010 funding

Reshaping

Reshaping of of fundingfunding structurestructure byby changechange of of legislationlegislation, , prepared

prepared byby MinistryMinistry of of TradeTrade and and IndustryIndustry (KTM). The (KTM). The changechange of of legislationlegislation tooktook placeplace 1.1.2004.1.1.2004.

Funding

Funding byby KTM, STUK and UtilitiesKTM, STUK and Utilities waswas replacedreplaced byby fundingfunding fromfrom a separatea separate fundfund administratedadministrated withinwithin VYR (Valtion VYR (Valtion

Ydinj

Ydinjäätehuoltorahasto, tehuoltorahasto, StateStateNuclearNuclearWasteWasteManagement FundManagement Fund))

Funding

Funding is collected is collected to VYR fund to VYR fund from from Finnish Finnish utilities utilities Fortum and TVO pro

Fortum and TVO pro MWth MWth (currently ( currently 240 € 240 € / / MWth) MWth ) according

according to their to their operation/ operation / construction construction permits permits Sligthly

Sligthly positive positive trend trend in volume in volume and funding and funding from from 2007 to 2007 to

2008 2008

(11)

SAFIR2010

SAFIR2010 VYR-funding 2007 and 2008

SAFIR2010 VYR-funding 2007 and 2008

0 100 200 300 400 500 600 700

1. Hum an

2. Au toma

tion

3. Core

4. Th erma

l

5. Se vere

6. M

aterials 7. Co

ncrete

8. PS A

k€

2007 2008

(12)

SAFIR2010

SAFIR2010 Total funding in 2007 and 2008

SAFIR2010 Total funding in 2007 and 2008

0 200 400 600 800 1000 1200 1400 1600 1800

1. Hum an

2. A uto

mation

3. Co re

4. Thermal

5. Se ver

e

6. Mate rials

7. Co ncrete

8. PSA

k€

2007 2008

(13)

SAFIR2010

Projects

The Steering Group will present an annual proposal to MTI of VYR The Steering Group will present an annual proposal to MTI of VYR-- financed entirety of research projects:

financed entirety of research projects:

8 areas and more than 1 project/area OneOne//severalseveral yearyear projectsprojects

A real project (beginning, end, deliverables)

Annual decisions on funding, a ”promise” system for coming years Updated project plans yearly for the call for proposals

Funding

Funding structurestructure: VYR / : VYR / otherother fundingfunding

Research institutions and organisations conducting technological

research can get a maximum of 60 % of VYR-funding of the total cost of a project

universities can get a maximum of 100 % of the marginal cost of a project.

VYR fundingVYR funding collectedcollected fromfrom TVO and Fortum TVO and Fortum PowerPower & Heat& Heat 240 240

€/€/MWthMWth accordingaccording to operationto operation permitspermits of NPPsof NPPs in Finland in Finland

(14)

SAFIR2010

SAFIR2010 Projects in 2008

For 2008

For 2008 altogetheraltogether 31 31 projectproject proposalsproposals, , appliedapplied VYR VYR fundingfunding 3,37 M

3,37 M€€, , availableavailable VYR VYR fundingfunding 2,532 M2,532 M€€ plus 0,246 Mplus 0,246 M€€ in in JuneJune 2008 2008 duedue to to changechange in in legistlationlegistlation

Evaluation

Evaluation processprocess::

Reference group evaluations & evaluation meetings in November Steering Group meeting and proposal in December

Final

Final fundingfunding decisionsdecisions byby VYR in VYR in MarchMarch 2008/July2008/July 20082008 Total

Total volumevolume in 2008 plannedin 2008 planned as 30 as 30 researchresearch projectsprojects and and adminstration

adminstration, 45 person , 45 person yearsyears and 6,7 Mand 6,7 M€€ Final

Final VYR VYR decisionsdecisions in Marchin March 2008 / 2008 / JulyJuly 2008, yet2008, yet projectsprojects werewere allowedallowed to startto start ’with’with ownown risk’risk’ 1.1.20081.1.2008

(15)

SAFIR2010

SAFIR2010 research areas

SAFIR2010 research

SAFIR2010 research programmeprogramme is divided in eight research is divided in eight research areas, which are:

areas, which are:

1.1. OrganisationOrganisation and human factorsand human factors 2.2. Automation and control roomAutomation and control room 3.3. Fuel and reactor physicsFuel and reactor physics

4.4. Thermal hydraulicsThermal hydraulics 5.5. Severe accidentsSevere accidents

6.6. Structural safety of reactor circuitStructural safety of reactor circuit 7.7. Construction safetyConstruction safety

8.8. Probabilistic safety analysis (PSA)Probabilistic safety analysis (PSA)

These research areas include both research projects of the These research areas include both research projects of the named topic and interdisciplinary co

named topic and interdisciplinary co--operation projects.operation projects.

(16)

SAFIR2010

SAFIR2010 VYR &Total Funding 2008

SAFIR2010 VYR and total funding 2008

0 200 400 600 800 1000 1200 1400 1600 1800

1. Hum an

2. A uto

mation

3. Core 4. T

hermal

5. Severe

6. Materials 7. C

onc rete

8. PSA

k€

VYR Total

(17)

SAFIR2010

SAFIR2010 VYR Funding 2008

SAFIR2010 VYR funding 2008

1. Human

6 % 2. Automation 10 %

3. Core 15 %

4. Thermal 5. Severe 19 %

11 % 6. Materials

21 % 7. Concrete

9 %

8. PSA 9 %

(18)

SAFIR2010

SAFIR2010 Total Funding 2008

SAFIR2010 Total Funding 2008

1. Human 5 %

2. Automation 8 %

3. Core 14 %

4. Thermal 14 % 5. Severe

11 % 6. Materials

24 % 7. Concrete

14 %

8. PSA 10 %

(19)

SAFIR2010

SAFIR2010 Funding Sources 2008

SAFIR2010 funding structure 2008

VYR 44 %

TVO 1 % NKS

2 % VTT

37 %

Others 14 %

Fortum EU 2 %

0 %

(20)

SAFIR2010

SAFIR2010 Cost Distribution in 2008

SAFIR2010 cost distribution 2008

Personnel 84 % Mat&suppl

4 %

Other 4 % Ext serv

Travel3 %

5 %

(21)

SAFIR2010

SAFIR2010 Projects 2008

Area1: Organisation and human factors

MANOR:

MANOR: Safety management and Safety management and organisatorialorganisatorial learning, VTT, learning, VTT, VYR 80 k

VYR 80 k€€, total 215 k, total 215 k€€

SAFEEX: Expert work in safety critical environment, HUT& TTL, SAFEEX: Expert work in safety critical environment, HUT& TTL, VYR 80 k

VYR 80 k€€, total 100,3 k, total 100,3 k€€

(22)

SAFIR2010

SAFIR2010 Projects 2008

Area 2: Automation and control room

MODSAFE:

MODSAFE: ModelModel--based safety evaluation of automation based safety evaluation of automation systems,

systems, VTT&HUT&othersVTT&HUT&others, VYR 135 k, VYR 135 k€€, total 190 k, total 190 k€€ CERFAS:

CERFAS: CertificationCertification facilitiesfacilities for software, VTT&TUT, VYR 80 for software, VTT&TUT, VYR 80 k€k€, , totaltotal 110 k€110 k€

OPRACTI:

OPRACTI:Operator practices and humanOperator practices and human--system interfaces in system interfaces in computer

computer--based control stations, VTT, VYR 72 kbased control stations, VTT, VYR 72 k€€, total 226 k, total 226 k€€

(23)

SAFIR2010

OPRACTICE- project in 2007

Control room operator wearing a head

Control room operator wearing a head--mounted camera in a simulator mounted camera in a simulator test at the

test at the LoviisaLoviisa training simulator.training simulator.

Control room operators' physical navigation and movement paths i Control room operators' physical navigation and movement paths in a n a simulator test at the

simulator test at the LoviisaLoviisa training simulator.training simulator.

(24)

SAFIR2010

SAFIR2010 Projects 2008

Area 3: Fuel and reactor physics

POKEVA:

POKEVA: Development and validation of Fuel performance Development and validation of Fuel performance codes, VTT, VYR 190k

codes, VTT, VYR 190k€€, total 322 k, total 322 k€€

TRICOT: Tridimensional core transient analysis methods, VTT, TRICOT: Tridimensional core transient analysis methods, VTT, VYR 120 k

VYR 120 k€, total 330 k€, total 330 k€€

TOPAS: Total reactor physics analysis system, VTT, VYR 96 TOPAS: Total reactor physics analysis system, VTT, VYR 96 k€k€, total 294 k, total 294 k€€

(25)

SAFIR2010

TOPAS –project in 2007

PSG (Probabilistic Scattering Game) code calculation of VVER

PSG (Probabilistic Scattering Game) code calculation of VVER--440 fuel 440 fuel bundle.

bundle.

CAD model of the VENUS

CAD model of the VENUS--3 LWR pressure vessel steel benchmark 3 LWR pressure vessel steel benchmark with partial length shielded assemblies (left) and a cross secti

with partial length shielded assemblies (left) and a cross section of the on of the corresponding tree

corresponding tree multigridmultigrid of the MultiTransof the MultiTrans calculation.calculation.

(26)

SAFIR2010

SAFIR2010 Projects 2008 Area 4: Thermal hydraulics

NUMPOOL:

NUMPOOL:Numerical Numerical modellingmodelling of condensation pool, VTT, of condensation pool, VTT, VYR 40 k

VYR 40 k€€, total 100 k, total 100 k€€ THARE:Improved

THARE:Improved thermal hydraulic analyses of nuclear reactor thermal hydraulic analyses of nuclear reactor and containment, VTT, VYR 151k

and containment, VTT, VYR 151k€€, total 318 k, total 318 k€€ SGEN: CFD

SGEN: CFD modellingmodelling of NPP Steam Generators, VTT, VYR 46 of NPP Steam Generators, VTT, VYR 46 k€k€, total 127 k, total 127 k€€

PACSIM: Improvement of PACTEL Facility Simulation PACSIM: Improvement of PACTEL Facility Simulation Environment PACSIM, LTY, VYR 58 k

Environment PACSIM, LTY, VYR 58 k€€, total 81 k, total 81 k€€

CONDEX: Condensation experiments with PPOOLEX facility, CONDEX: Condensation experiments with PPOOLEX facility, LTY, total 290 k

LTY, total 290 k€€

LABRIG: Large break loss of coolant accident test rig, LTY, VYR LABRIG: Large break loss of coolant accident test rig, LTY, VYR 10 k€10 k€, total 30 k, total 30 k€€

(27)

SAFIR2010

CONDEX and ECE –projects in 2007

Drywell compartment of the new PPOOLEX thermal hydraulic test Drywell compartment of the new PPOOLEX thermal hydraulic test facility at LUT.

facility at LUT.

Volume fraction, temperature and velocity contours in PPOOLEX Volume fraction, temperature and velocity contours in PPOOLEX simulation

simulation..

(28)

SAFIR2010

SAFIR2010 Projects 2008 Area 5: Severe accidents

RADECO:

RADECO: Release of radioactive materials from a degrading Release of radioactive materials from a degrading core, VTT, VYR 30 k

core, VTT, VYR 30 k€€, total 85 k, total 85 k€€

CHEMPC: Primary circuit chemistry of fission products, VTT, CHEMPC: Primary circuit chemistry of fission products, VTT, VYR 96 k

VYR 96 k€€, total 209 k, total 209 k€€ COMESTA:

COMESTA: CoreCore meltmelt stabilization, VTT, VYR 120 kstabilization, VTT, VYR 120 k€, €, totaltotal 280 280 k€k€

HYRICI:

HYRICI: Hydrogen risk in containments and particle bed issues, Hydrogen risk in containments and particle bed issues, VTT, VYR 56 k

VTT, VYR 56 k€€, total 152,3 k, total 152,3 k€€

(29)

SAFIR2010

COMESTA –project in 2007

HECLA

HECLA--2 test of COMESTA project. 50 kg of molten steel was poured 2 test of COMESTA project. 50 kg of molten steel was poured into the concrete container.

into the concrete container.

(30)

SAFIR2010

SAFIR2010 Projects 2008

AREA 6: Structural safety of reactor circuit

PURISTA:

PURISTA: RiskRisk--informedinformed inspectionsinspections of of pipingpiping, VTT, VYR 87 k, VTT, VYR 87 k€€, , total

total 218 k218 k€€ FATE:

FATE: Fatigue endurance of critical equipment, VTT, VYR 57 Fatigue endurance of critical equipment, VTT, VYR 57 k€k€, total 114 k, total 114 k€€

WATCHEM: Water chemistry and oxidation in the primary WATCHEM: Water chemistry and oxidation in the primary circuit, VTT, VYR 68 k

circuit, VTT, VYR 68 k€€, total 148 k, total 148 k€€

RAKEMON: Monitoring of the structural integrity of reactor RAKEMON: Monitoring of the structural integrity of reactor circuit, VTT, VYR 86 k

circuit, VTT, VYR 86 k€€, total 206 k, total 206 k€€

FRAS: Fracture assessment of reactor circuit, VTT, VYR 147 FRAS: Fracture assessment of reactor circuit, VTT, VYR 147 k€k€, total 422 k, total 422 k€€

DEFSPEED: Influence of material, environment and strain rate DEFSPEED: Influence of material, environment and strain rate on environmentally assisted cracking.., VTT, VYR 142 k

on environmentally assisted cracking.., VTT, VYR 142 k€€, total , total 445 k

445 k€€

(31)

SAFIR2010

DEFSPEED –project in 2007

TEM image of channel deformation in a 0.16

TEM image of channel deformation in a 0.16 dpadpa 304L stainless steel304L stainless steel Micrograph of a dissimilar metal weld with schematic presentatio

Micrograph of a dissimilar metal weld with schematic presentation of n of sub-sub-size fracture resistance (Jsize fracture resistance (J-R) test specimens to be used for -R) test specimens to be used for

investigations on low temperature crack propagation properties o

investigations on low temperature crack propagation properties of the f the weld metal.

weld metal.

(32)

SAFIR2010

SAFIR2010 Projects 2008 Area 7: Construction safety

SERVICEMAN:

SERVICEMAN: Service life management system of concrete Service life management system of concrete structures in nuclear power plants, VTT, VYR 100 k

structures in nuclear power plants, VTT, VYR 100 k€€, total 210 , total 210 kk€€

IMPACT2010: Impact tests, VTT, VYR 50 k

IMPACT2010: Impact tests, VTT, VYR 50 k€€, total 490 k, total 490 k€€ SUSI: Structures under soft impact, VTT, VYR 100 k

SUSI: Structures under soft impact, VTT, VYR 100 k€, total 190 €, total 190 k€k€

(33)

SAFIR2010

IMPACT2010 in 2007

Test facility used in the IMPACT2010 project.

Test facility used in the IMPACT2010 project.

(34)

SAFIR2010

SAFIR2010 Projects 2008

Area 8: Probabilistic safety analysis (PSA)

CHARISMA:

CHARISMA:Challenges in riskChallenges in risk--informed safety management, informed safety management, VTT, VYR 111,4 k

VTT, VYR 111,4 k€€, total 331,8 k, total 331,8 k€€

FIRAS: Implementation of quantitative fire risk assessment in FIRAS: Implementation of quantitative fire risk assessment in PSA, VTT, VYR 100 k

PSA, VTT, VYR 100 k€, total 165 k€, total 165 k€€

EXWE: Extreme weather and nuclear power plants, FMI, VYR EXWE: Extreme weather and nuclear power plants, FMI, VYR 50,2 k

50,2 k€€, total , total 135,2135,2 k€k€

(35)

SAFIR2010

EXWE –project in 2007

Extreme

Extreme weatherweather conditionsconditions (trombs(trombs, , lightninglightning……))

Referências

Documentos relacionados

Rekisteröidyllä on lähtökohtaisesti oikeus soveltuvan tietosuojalainsäädännön mukaisesti: • saada tieto henkilötietojensa käsittelystä • saada pääsy omiin tietoihinsa ja tarkastaa