[PDF] Top 20 The crew scheduling and routing problem in road restoration
Has 10000 "The crew scheduling and routing problem in road restoration" found on our website. Below are the top 20 most common "The crew scheduling and routing problem in road restoration".
The crew scheduling and routing problem in road restoration
... communication and transportation. In particular, recovering the transportation infrastructure is of ultimate importance in post-disaster situations, to enable the evacuation of victims ... See full document
169
The mixed capacitated arc routing problem with non-overlapping routes
... Lu and Dessouky, 2006; Tang and Miller- Hooks, 2006) or boundary crossing points (Lin and Kao, ...However, the literature has been scarce on the evaluation of zones ...(2002) and ... See full document
31
Using a maximal coing approach for the vehicle and crew scheduling: a case of study art baprata using
... Nowadays, the vehicle and crew scheduling is a hard and widely studied Combinatorial Opimizaion ...of the above menioned problem are prohibiive due to high computaional ... See full document
10
Optimization Algorithms for the Inventory Routing Problem
... In the last few years many European Countries have been facing economic crisis and in order to overcome it many cost-cutting policies have been developed and applied by many companies ... See full document
76
A biased-randomized heuristic for the home healthcare routing problem
... increase in average life expectancy as a result of new developments in medicine along with the decrease of the birth rate in developed countries is making the so called ... See full document
10
Robust optimization for a maritime inventory routing problem
... result in ships staying idle at ports during weekends by imposing penalty costs for arrivals at risky times ...weekends). The resulting schedule needs to be more robust with respect to delays from bad ... See full document
36
Vehicle routing and tour planning problem: a cement industry case study
... to the fact that the algorithm No.2 does not give always the same route for trucks requiring the same ...always the least occupied server at the time of reaching the ... See full document
141
The crew timetabling problem: an extension of the crew scheduling problem
... solution in the neighbourhood of the current solution at each step would be too time ...of the neighbourhood—a sub-neighbourhood—that contains a reduced number of high quality solutions is ... See full document
22
The smart waste collection routing problem: alternative operational management approaches
... technologies, and from these, four were classified as having as target application the route/collection optimization: Johansson (2006), Apaydin and Gonullo (2007), Rovetta et ...different ... See full document
26
Crew and Aircraft Electronic Market
... simple and that makes it easier to automate ...collusion and lies (to lower or inflate the price of the good under negotiation, respectively), and a powerful tool that automated agents ... See full document
102
A mixed load rural school bus routing problem with heterogeneous fleet: a study for the Brazilian problem
... formation and by their poor access to a functional education and transportation ...systems. In the last decade, the federal government has been encouraging the nucleation of ... See full document
86
An imperialist competitive algorithm for solving the production scheduling problem in open pit mine
... Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present ... See full document
13
A study of flow-based models for the electric vehicle routing problem
... Vehicle Routing Problem (EVRP) ´ e ent˜ ao uma variante dos problemas cl´ assicos do Traveling Purchaser Problem (TSP) e do Vehicle Routing Problem (VRP) em que s˜ ao considerados ... See full document
72
The multi-compartment vehicle routing problem in the collection of recyclable municipal solid waste
... studied in the literature. With the development of heuristics and the effort to improve them, the quality of the MCVRP solution increases, making it more appealing to ... See full document
101
Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem
... as the number of jobs increases. Due to this large neighborhood size and the resulting computational burden, a modification can be be made to restrict the neighborhood as much as possible ... See full document
30
Modeling a four-layer location-routing problem
... is the distribution cost including depot cost, shipment (between facilities) cost, and delivery (to customers) cost (fixed and variable costs of ...are the tour continuity constraints which ... See full document
10
Contributions to the single and multiple vehicle routing problem with deliveries and selective pickup
... In the Single Vehicle Routing Problem with Deliveries and Selective Pickups (SVR- PDSP) there are a set of customers to be served and a depot from where a vehicle departs to ... See full document
87
Evaluating agile scheduling methods for a job shop problem
... identify the critical factors that drive the decision about the degree of decentralization of the control ...that the identified elements do not act alone, but it is the ... See full document
90
Project Scheduling Problem for software development library : PSPSWDLIB
... Project Scheduling Problem (PSP) is a generic name given to a whole class of problems in which it is necessary to schedule in an optimal way, the time, cost and resources of ... See full document
8
Heuristic approaches for a flexible job-shop scheduling problem
... fabrication in the semiconductor industry) thus the workflow does not follow a particular pattern (Peng et ...found in job-shop environments (Figure 3a), also referred as a generalization of ... See full document
115
temas relacionados