Deployment of Formal Methods in Industry: the Legacy of the FP7 ICT DEPLOY Integrated Project
4
0
0
Texto
Documentos relacionados
The research includes a statistical analysis of the characteristics of projects, the performance analysis of these projects, the classification of projects as the