55
56 REFERÊNCIAS BIBLIOGRÁFICAS
AGUIAR, G. F.; PEINADO, J. Compreendendo o Kanban: Um Ensino Interativo Ilustrado. da Vinci, Curitiba, v. 4 , n. 1, p. 133-146, 2007
BALLARD, G. The Last Planner. Northern California Construction Institute.
California, Monterrey, 1994.
BALLARD, G.; HOWELL, G. Shielding Production: An Essential Step in Production Control. Journal of Construction Engineering and Management, 1998.
BALLARD, G. Improving Workflow Reliability. Proceedings of the 7th International Group of Lean Construction, 1999.
BALLARD, G. The Last Planner System of Production Control. Faculty of Engineering, The University of Birmingham, 2000.
BAZONI, A. A. F.; ZENI, A.; FRANÇA, R. T.; TORRICELLI, T. A.; DAOLIO, R. P. G.
Implantação do Diagrama de Ishikawa em uma Empresa do Segmento de Tintas e Materiais para Construção para Solucionar Problemas de Estocagem e Recebimento.
Gestão em Foco, Edição número 7, 2015.
BERTRAND, J. W. M.; WORTMANN, J. C.; WIJNGAARD, J. Production Control: A Structural and Design Oriented Approach. Elsevier: Amsterdam, 1990.
BOAVENTURA, E. M. Metodologia da Pesquisa: Monografia, Dissertação e Tese.
São Paulo: Atlas, 2004.
BONI, A. C.; PALIARI, J. C.; SERRA, S. M. B. Sistema puxado de planejamento e controle da produção. XV Encontro Nacional do Ambiente Construído. Alagoas, Maceió, 2014.
CAMPOS, V. F. Gerenciamento da Rotina de Trabalho do Dia-a-dia. Minas Gerais.
INDG Tecnologia e Serviços Ltda., 1999.
CARRION, C. W.; Aplicação do Método DMAIC na Construção Civil: Estudo Caso de Obra Habitacional. XII SIMPEP. São Paulo, 2005.
57 CHINI, A. R.; VALDEZ, H. E. ISO 9000 and the US construction industry. Journal of management in engineering, v. 19, n. 2, p. 69 – 77, 2003.
CHINWEUDE, O. A. A review of safety and quality issues in the construction industry. KICEM J. Constr. Eng. Project Manage, 42–48, 2013.
COSTA, D. B. Diretrizes para a Concepção, Implementação e Uso de Sistema de Indicadores de Desempenho para Empresas da Construção Civil. Dissertação (mestrado).
Programa de Pós-graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, 2003.
CRESWELL, J.W. (2010). Projeto de Pesquisa. Métodos Qualitativo, Quantitativo e Misto. 3. ed. Porto Alegre: Artmed. 296 p.
CUNHA, V. L. S. Melhoria Contínua no Sistema de Controlo da Qualidade.
Dissertação (mestrado). Programa de Mestrado Integrado em Engenharia Metalúrgica e de Metais, Faculdade de Engenharia da Universidade do Porto, Porto, 2010.
Dale, B. Managing quality. Blackwell, U.K, 2007.
DEPEXE, M. D.; PALADINI, E. P. Dificuldades relacionadas à implantação e certificação de sistemas de gestão da qualidade em empresas construtoras. Revista Gestão Industrial. Universidade Tecnológica Federal do Paraná. Ponta Grossa, Paraná, 2007.
FIREMAN, M. C. T.; FORMOSO, C. T.; ISATTO, E. L. Integrating Production and Quality Control: monitoring making-do and unfinished work. Annual Conference of the International Group for Lean Construction, IGLC, Fortaleza, 2013.
FORMOSO, C; SOMMER, L; KOSKELLA, L; ISATTO, E. L. An Exploratory Study on the Measurement and Analysis of Making-Do in Construction Sites. Annual Conference of the International Group for Lean Construction, IGLC, Lima, 2011.
FORMOSO, C. T. Termo de Referencia para o Processo de Planejamento e Controle da Produção em Empresas Construtoras. Porto Alegre: NORIE/UFRGS, 1999.
GIL, A. C. Como elaborar projetos de pesquisa. 5. ed. São Paulo: Atlas, 2010.
58 GODOY, M. H. C.. Brainstorming. Belo Horizonte: Editora de Desenvolvimento Gerencial, 2001.
GRENHO, L. F. S. Last Planner System e Just in Time na Construção. Universidade do Porto, 2009.
HAMZEH, F.; BERGSTROM, E. The Lean Transformation: A Framework for Successful Implementation of the Last Planner System in Construction. Colorado State University. Fort Collins, Colorado, 2010.
HERAVITORBATI, A.; COFFEY, V.; TRIGUNARSYAH, B. Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects. Int. J. Innov. Manage. Technol., 465–470, 2011.
HOLANDA, M. A.; PINTO, A. C. B. R. F. Utilização do Diagrama de Ishikawa e Brainstorming para Solução do Problema de Assertividade de Estoque em uma Indústria da Região Metropolitana de Recife. XXIX Encontro Nacional de Engenharia de Produção.
Salvador, Bahia, 2009.
INTERNATIONAL GROUP FOR LEAN CONSTRUCTION. About. Disponível em:
<http://www.iglc.net/>. Acesso em: 26 de outubro de 2016.
ISHIKAWA, K. Controle de qualidade total: à maneira japonesa. Rio de Janeiro:
Campos, 1993. P. 79
KETHERS, S.; SCHOOP, M. Reassessment of the Action Workflow Approach:
Empirical Results. In: International Workshop on the Language-Action Perspective on Communication Modelling. Aachen, Alemanha, 2000.
KIM, C; PARK, T; LIM, H; KIM, H. On-Site Construction Management Using Mobile Computing Technology. Automation in Construction, v. 35, p. 415-423, 2013.
KIM, Y. S; OH, S. W; CHANG, H. J; LEE, J. B; KIM, H. S. A PDA and Wireless WebIntegrated System For Quality Inspection and Defect Management of Apartment Housing Projects. Automation in Construction, v. 17, n. 2, p. 163-179, 2008.
59 KIMOTO, K; ENDO, K; IWASHITA, S; FUJIWARA, M. The Application of PDA as Mobile Computing System on Construction Management. Automation in Construction, v. 14, n. 4, p. 500-511, 2005.
KNIBERG, H.; SKARIM, M.; Kanban e Scrum: Obtendo o Melhor de Ambos.
Disponível em: <https://www.infoq.com/br/minibooks/kanban-scrum-minibook>. Acesso em: 02 de novembro de 2016.
KOSKELA, L. Application of the New Production Philosophy to Construction. CIFE Technical Report #72, 75p.Stanford University, Palo Alto, California, 1992.
KOSKELA, L.; Na Exploration Towards a Production Theory and its Application to Construction. Dissertação (doutorado). Technical Research Centre of Finland, Espoo, 2000.
KUREK, J.; PANDOLFO, L. M.; PANDOLFO, A.; RINTZEL, R.; TAGLIARI, L.
Implantação dos Princípios da Construção Enxuta em uma Empresa Construtora. Revista de Arquitetura da IMED, v. 2, n.1, 2013.
LANTELME, E. M. V.; TZORTZOPOULOS, P. FORMOSO, C. T. Indicadores de Qualidade e Produtividade para a Construção Civil. Universidade Federal do Rio Grande do Sul. Porto Alegre, 2001.
LEÃO, C. F; ISATTO, E. L; FORMOSO, C. T. Proposta de Modelo para Controle Integrado da Produção e da Qualidade com Apoio da Computação Móvel. Ambiente Construído, Porto Alegre, v. 16, n. 4, p. 109-124, 2016.
LUNGUINHO, A. H. G.; CARVALHO, M. T. Aplicação dos Princípios Lean Construction em uma Obra do Distrito Federal. XIV ENTAC, Juiz de Fora, 2012.
MARTINS, G. A. Estudo de Caso: Uma Estratégia de Pesquisa. São Paulo: Atlas, 2006.
MENDES, JR. R. E HEINECK, L. F. M. Preplanning method for multi-story building construction using line of balance. Annual Meeting of the International Group for Lean Construction, Guarujá, IGLC, 1998.
60 MIGUEL, P. A. C.; Qualidade: enfoques e ferramentas. 1a ed. São Paulo: Artliber, 2006.
MONDEN, Y. Produção sem estoques: uma abordagem prática do sistema de produção da Toyota. São Paulo: IMAN, 1984.
MOURA, C. B. Avaliação do Impacto do Sistema Last Planner no Desempenho de Empreendimentos da Construção Civil. Universidade Federal do Rio Grande do Sul. Porto Alegre, 2008.
NOURBAKHSH, M; ZIN, R. N; IRIZARRY, J; ZOLFAGHARIAN, S; GHEISARI, M.
Mobile Application Prototype For On-Site Information Management in Construction Industry. Engineering, Construction and Architectural Management, v. 19, n. 5, p. 474-494, 2012.
OLIVEIRA, G. S.; PONTES, D. L.; KAMIYA, I. K.; LEITE, A. A. F. Análise Ergonômica do Trabalho em uma Usina Hidrelétrica com o Auxílio da Ferramenta da Qualidade o Diagrama de Ishikawa. XVIII Simpósio de Engenharia de Produção. São Paulo, 2010.
PEINADO, J.; GRAEML, A. R. Administração da Produção: Operações Industriais e Serviços . Curitiba: UnicemP, 2007.
POKSINSKA, B.; EKLUND, J. A. E.; DAHLGAARD, J. J. ISO 9001:2000 in small organizations: Lost opportunities, benefits and influencing factors. International Journal of Quality and Reliability Management, v. 23, n. 5, p. 490 – 512, 2006.
PRODANOV, C. C.; FREITAS, E. C. Metodologia do Trabalho Científico: Métodos e Técnicas da Pesquisa e do Trabalho Acadêmico. Universidade FEEVALE. 2a Edição. Novo Hamburgo, Rio Grande do Sul, 2013.
ROCHA, M. Q. B. Elaboração de Indicadores e Uso de Ferramentas de Controle da Qualidade na Execução de Obras Prediais. Dissertação (mestrado). Programa de Pós-graduação em Engenharia Civil, Universidade do Estado do Rio de Janeiro, Rio de Janeiro, 2007.