• Nenhum resultado encontrado

Como pesquisas futuras, propõem se discussões críticas das barreiras encontradas nesta pesquisa na implementação da ferramenta Last Planner System em obras do sector da Construção civil. Além disso, sugere-se a aplicação prática das 7 diretrizes propostas com o intuito de observar a sua funcionalidade e aplicabilidade.

REFERÊNCIAS

ABDELHAMID, T.; SALEM, S. LEAN CONSTRUCTION: A NEW PARADIGM FOR

MANAGING CONSTRUCTION PROJECTS. In: The International Workshop on

Innovations in Materials and Design of Civil Infrastructure. Anais...Cairo, Egypt: 2005 ACKOFF, L. R. Planejamento Empresarial. Rio de Janeiro: LTC, 1976.

ADAMU, I.; HOWELL, G. Applying lean construction technique in Nigerian

construction industry. In: 20 Annual Conference of the International Group for Lean

Construction. Anais...San Diego, USA: 2012

AHIAKWO, O. et al. A case study of Last Planner System implementation in

Nigeria. In: 21 Annual Conference of the International Group for Lean Construction. Anais...Fortaleza, Brazil: 2013

ALARCÓN, L.; CALDERÓN, R. A production planning support system for

construction projects. In: 11 Annual Conference of the International Group for Lean

Construction. Anais...Virginia, USA: 2003

ALARCÓN, L. F.; DIETHELMAND, S.; ROJO, O. Collaborative Implementation of

Lean Planning Systems in Chilean Construction Companies. In: 10 Annual

Conference of the International Group for Lean Construction. Anais...Gramado, Brazil: 2002

ÁLVAREZ, H. M. EL EFECTO EN LA PRODUCCIÓN DE LA CONSTRUCCIÓN AL

APLICAR LA METODOLOGÍA LAST PLANNER. Tesis: (Maestría en Administración

de la Construcción). Universidade Panamericana, Guadalajara - México, 2013. ALVES, G. O novo e precário mundo do trabalho. São Paulo: Boitempo, 2000. ANTILL, J. M.; WOODHEAD, R. W. Método de la Ruta Crítica y sus Aplicaciones

a la Construcción. México D. F: Limusa Noriega Editores, 1995.

ANTUNES, J. Sistemas de Produção: Conceitos e Práticas para projeto e gestão

da produção enxuta. Porto Alegre: Bookman, 2008.

ANTUNES, R. Adeus ao trabalho? Ensaio sobre as metamorfoses e a

ANTUNES JUNIOR, J. A. V. A lógica das perdas nos sistemas de produção: uma

analise critica. In: XIX ENENPAD. Anais...João Passoa: 1995

ANTUNES JUNIOR, J. A. V. Em direção a uma teoria geral do processo na

administração da produção: uma discussão sobre a possibilidade de unificação da teoria das restrições e a teoria que sustenta a construção dos sistemas de produção com estoque zero. Tese: (Doutorado em Administração) - Escola de

Administração, Universidade Federal do Rio Grande do Sul, Porto Alegre, 1998. ARDITI, D. Diffusion of network planning in construction. Journal of the Construction

Engineering and Management, ASCE, v. 109, p. 1–12, 1983.

ASLESEN, S.; BERTELSEN, S. Last Planner in a Social Perspective–A

Shipbuilding Case. In: 16 Annual Conference of the International Group for Lean

Construction. Anais...Manchester, UK: 2008

BALLARD, G. The Last Planner. Lean Construction Institute, p. 1–8, 1994.

BALLARD, G. LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION

CONTROL. In 15: Annual Conference of the International Group for Lean

Construction. Anais...Gold Coast, Australia: 1997

BALLARD, G. Phase Scheduling. Lean Construction Institute, v. 7, p. 1–3, 2000ª. BALLARD, G. Crew Level Planning. Lean Construction Journal, p. 15–24, 2015. BALLARD, G.; HOWELL, G. Implementing lean construction: stabilizing work

flow. Lean construction. Anais...1997

BALLARD, G.; HOWELL, G. Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, v. 124, n. 1, p. 11– 17, 1998.

BALLARD, G.; HOWELL, G. A. An Update on Last Planner. In: 11 Annual Conference of the International Group for Lean Construction. Anais...Virginia, USA: 2003

BALLARD, H. G. LEAN CONSTRUCTION AND EPC PERFORMANCE

IMPROVEMENT. In: 1 Annual Conference of the International Group for Lean

BALLARD, H. G. “Work Structuring. ”. Lean Construction Institute, v. Paper #5, 1999.

BALLARD, H. G. The Last Planner System of Production Control. Thesis: (Doctor Engineering) Faculty of Engineering, The University of Birmingham, England, 2000b. BALLARD, H. G.; CASTEN, M.; HOWELL, G. PARC: A CASE STUDY. In: 4 Annual Conference of the International Group for Lean Construction. Anais...Birmingham, UK: 1996

BARROS, D. E. S.; ALARCÓN, L. F. DIRECTRICES Y RECOMENDACIONES PARA

UNA BUENA IMPLEMENTACIÓN DEL SISTEMA LAST PLANNER EN PROYECTOS DE EDIFICACIÓN EN CHILE. Memoria: (Pregrado en Ingenieria Civil),

Departamento Ingenieria Civil, Universidad de Chile, Santiago de Chile, 2011.

BERNARDES, M. M. E S. Planejamento e controle da produção para empresas

da construção civil. Rio de Janeiro: LTC Editora, 2003.

BERNARDES, M. M. S. Desenvolvimento de um modelo de planejamento e

controle da produção para micro e pequenas empresas da construção. Tese:

(Doutorado em Engenharia Civil) – Curso de Pós-graduação em engenharia civil. Universidade Federal do Rio Grande do Sul, Porto Alegre, 2001.

BERTELSEN, S.; KOSKELA, L. MANAGING THE THREE ASPECTS OF PRODUCTION IN CONSTRUCTION. International Group for Lean Construction, v. 10, p. 1–10, 2002.

BORTOLAZZA, R. C.; COSTA, D. B.; FORMOSO, C. T. Análise Quantitativa da

Implementação do Sistema Last Planner no Brasil. In: Simposio Brasileiro de

Gestão e Economia da Construção - SIBRAGEC. Anais...2005

BORTOLAZZA, R. C.; FORMOSO, C. T. A quantitative analysis of data collected

from the last planner system in Brazil. In:14 Annual Conference of the International

Group for Lean Construction. Anais...2006ª

BORTOLAZZA, R. C.; FORMOSO, C. T. ANÁLISES QUANTITATIVAS EM UM

MODELO DE PLANEJAMENTO E CONTROLE DA PRODUÇÃO BASEADO NO LAST PLANNER. In: XI Encontro Nacional de Tecnologia do Ambiente Construído. Anais...2006b

BOTERO, L. F. B.; VILLA, M. E. Á. Last planner, un avance en la planificación y control de proyectos de construcción Estudio del caso de la ciudad de Medellín. Ingeniería y

Desarrollo, n. 17, p. 148–159, 2005.

BRANCO, T. B.; GRANJA, A. D. ANÁLISE DO RITMO DE PRODUÇÃO E

NIVELAMENTO DOS RECURSOS NA ETAPA DE PLANEJAMENTO - UTILIZAÇÃO

DA TÉCNICA DE LINHAS DE BALANÇO EM EMPREENDIMENTOS

HABITACIONAIS REPETITIVOS. Dissertação: (Mestrado em Engenharia civil)

Curso de Pós Graduação em engenharia civil, UNICAMP, Campinas, 2007.

CARRANCO, M. R. F.; PALACIOS, V. H. R. Applying the Last Planner Control

System To a Construction Project : a Case Study in Quito , Ecuador. In: 10 Annual

Conference of the International Group for Lean Construction. Anais...2002

CODINHOTO, R. et al. ANÁLISE DE RESTRIÇÕES : DEFINIÇÃO E INDICADOR DE

DESEMPENHO. In: III SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA

CONSTRUÇÃO. Anais...2003

COELHO, H. O.; FORMOSO, C. T. Diretrizes e requisitos para o planejamento e

controle da produção em nível de médio prazo na construção civil. Dissetação:

(Mestrado em Engenharia CIvil) Programa de pós-graduação em engenharia civil, UFRGS, Porto Alegre, 2003.

COSTA, M.; FIREMAN, T.; SANTOS, A. D. O. DIAGNÓSTICO DO SISTEMA DE

PLANEJAMENTO E CONTROLE DA PRODUÇÃO DE UMA EMPRESA DA CAPITAL ALAGOANA. In: XXIII Encontro Nacional de Tecnologia do Ambiente

Construído. Anais...2010

COSTA, L. K. DA. O USO DO SISTEMA LAST PLANNER COMO FERRAMENTA

PARA CONTROLE DE PRODUÇÃO : APLICABILIDADE E ESTUDO DE CASO.

Trabalho de conclução de curso: (Engenharia Civil), Universidade Federal de Santa Maria, Rio Grande do Sul, 2014.

DANIEL, E. I.; PASQUIRE, C.; DICKENS, G. Exploring the Factors That Influence

the Implementation of the Last Planner ® System on Joint Venture Infrastructure Projects : a Case Study Approach. In: 24 Annual Conference of the International

DEKIER, Ł. The Origins and Evolution of Lean Management System. Journal of

International Studies, v. 5, n. 1, p. 46–51, 2012.

DRESCH, A.; LACERDA, D. P.; ANTUNES JR, J. A. V. Design Science Research. Porto Alegre: Springer International Publishing Switzerland, 2015.

EMDANAT, S.; LINNIK, M.; CHRISTIAN, D. A Framework for Integrating Takt

Planning , Last Planner System and Labor Tracking. In: 24 Annual Conference of

the International Group for Lean Construction. Anais...2016

ENGELMANN, H.; GEHBAUER, F.; STEFFEK, P. Software Agents To Support

Decision Making in Design and Execution Planning. In: 16 Annual Conference of

the International Group for Lean Construction. Anais...2008

FERNANDEZ-SOLIS, J. L.; LAGOO, N.; RYBKOWSKI, Z. K. A Seminal Case Study on Application of Last Planner System with Cash Flow Data for Improvement in Construction Management Practices. Engineering Management Reviews, v. 1, n. 1, p. 1–6, 2012.

FORMOSO, C. T. A knowledge based framework for planning house buildings

projects. These: (Phd. Civil Engineering) – Departament of quantity and Building

Surveying. Universidade of Salford, 1991.

FORMOSO, C. T. et al. Termo de referência para o processo de planejamento e

controle da produção em empresas construtoras. Dissertação: (Mestrado em

Engenharia CIvil) Programa de pós-graduação em engenharia civil, UFRGS, Porto Alegre, 1999.

FORMOSO, C. T. Planejamento e controle da produção em empresas de

construção. Porto Alegre: UFRGS, 2001.

FORMOSO, C. T.; MOURA, C. B. Evaluation of the impact of the Last Planner

system on the performance of construction projects. In: 17 Annual Conference of

the International Group for Lean Construction, IGLC17. Anais...2009

FOSSE, R.; BALLARD, G. Lean Design Management in Practice With the Last

Planner System. In: 24 Annual Conference of the International Group for Lean

FRANDSON, A.; BERGHEDE, K.; TOMMELEIN, I. D. Takt-Time Planning and the Last Planner. Iglc-22, p. 571–580, 2014.

FRIBLICK, F.; OLSSON, V.; RESLOW, J. Prospects for implementing Last Planner

in the construction industry. Proceedings of IGLC17: 17th Annual Conference of the

International Group for Lean Construction. Anais...2009

FUJIMOTO, T. The evolution of a manufacturing system at Toyota. 1. ed. ed. [s.l.] New York:Oxford University Press, 1999.

FURLANETTO, A.; NETO, D. G. Planejamento, programação e controle da

produção. [s.l.] Monografia (Especialista em MBA de gerência da produção) Direitoria

de pós-graduação da Universidade do Extremo Sul Catarinense - UNESC, 2004. GEHBAUER, F. Lean Organization : Exploring Extended Potentials of the Last Planner System. Proceedings IGLC-16, p. 3–13, 2008.

GHINATO, P. Sistema Toyota de produção: mais do que simplesmente Just-in-Time.

Produção, v. 5, n. 2, p. 169–189, 1995.

GHINATO, P. Elementos Fundamentais do Sistema Toyota de Produção. Produção

& Competitividade: Aplicações e Inovações, 2000.

GONZALEZ, V.; ALARCON, L. F.; MUNDACA, F. Investigating the relationship

between planning reliability and project performance. Production Planning &

Control. Anais...2007

GRENHO, S. L. F.; COSTA, M. F. M. DA. Last Planner System E Just-in-Time Na

Construção. [s.l.] Dissertação (Mestrado em Engehnaria Civil-Especialização em

construções) Faculdade de Engenharia, Universidade do Porto, Portugar, 2009. HAMZEH, F. R. The Lean Journey: Implementing The Last Planner ® System in Construction. Proceedings of the 19th conference for the International Group of

Lean Constrution IGLC-19, n. July, p. 379–390, 2011.

HAMZEH, F. R.; BALLARD, G.; TOMMELEIN, I. D. Improving construction work flow - The connective role of lookahead planning. Proceedings of IGLC16: 16th Annual

HOLMSTRÖM, J.; KETOKIVI, M.; HAMERI, A.-P. Bridging Practice and Theory: A Design Science Approach. Decision Science Institute, v. 40, n. 1, p. 65–87, 2009. HOPP, W. J.; SPEARMAN, M. L. Factory phisics. 1. ed. New York: McGraw-Hill, 2008.

HORMAN, M. J. et al. Using buffers to manage production: a case study of the

pentagon renovation project. ANNUAL CONFERENCE OF THE INTERNATIONAL

GROUP FOR LEAN CONSTRUCTION, 11. Anais...Virginia, USA: 2003

HOWELL, G. A. WHAT IS LEAN CONSTRUCTION. INTERNATIONAL GROUP FOR

LEAN CONSTRUCTION, v. 7, p. 1–10, 1999.

HUBER, B.; REISER, P. The marriage of CPM and lean construction. Annual

Conference International Group for Lean Construction (IGLC-11), 2003.

LEAN I. Principles Lean. Disponível em:

<https://www.lean.org/WhatsLean/Principles.cfm>.

ISATTO, E. L. et al. Lean Construction: diretrizes e ferramentas para o controle

de perdas na construção civil. [s.l.] Porto Alegre, SEBRAE/RS., 2000.

JIMÉNEZ, P. C.; BOTERO, L. F. B. IMPLEMENTACIÓN DEL SISTEMA DE

PLANEACIÓN Y CONTROL “LAST PLANNER” EN EL TRAMO 2B DEL CORREDOR PARCIAL DE ENVIGADO PARA MEJORAR LA CONFIABILIDAD Y REDUCIR LA INCERTIDUMBRE EN LA CONSTRUCCIÓN. [s.l.] Tesis (Maestrpia en

ingeniería - énfasis gestión de la construcción), Universidad EAFIT, Medellín - Colombia, 2012.

JUNIOR, R. M. et al. ANÁLISE DE OBRAS DE EDIFICAÇÕES MULTIFAMILIARES EM RELAÇÃO AO PLANEJAMENTO DE CURTO PRAZO. ANTAC, 2008.

KALSAAS, B. T.; SKAAR, J.; THORSTENSEN, R. T. IMPLEMENTATION OF LAST

PLANNER IN A MEDIUM-SIZED CONSTRUCTION SITE. Proceedings for the 17th

Annual Conference of the International Group for Lean Construction. Anais...2009 KEMMER, S. L. et al. PLANEJAMENTO DE MÉDIO PRAZO: CONTRIBUIÇÃO AO GERENCIAMENTO DO PLANO COM BASE EM APLICAÇÃO PRÁTICA. XI Encontro

KOSKELA, L. Aplicattion of the new production philosophy in the construction

industry. [s.l.] Standfor University. Stanford - USA, 1992.

KOSKELA, L. MANAGEMENT OF PRODUCTION IN CONSTRUCTION : A THEORETICAL VIEW. International Group for Lean Construction, v. 7, p. 241–252, 1999.

KOSKELA, L. An exploration towards a production theory and its application to

construction An exploration towards a production theory and. [s.l.] Thesis

(Engineering Doctoral Thesis). Helsinki University of Technology, Espoo - Finland, 2000.

KOSKENVESA, A.; KOSKELA, L. Ten years of last planner in Finland - Where are

we? IGLC 2012 - 20th Conference of the International Group for Lean Construction. Anais...2012

LACERDA, D. P. et al. Design Science Research: Método de pesquisa para a engenharia de produção. Gestao e Producao, v. 20, n. 4, p. 1–21, 2013.

LAUFER, A. Essentials of Project planning: owner ’s perspective. Construction

management and economics: ASCE, v. 6, n. 2, p. 1990, 1990.

LAUFER, A. et al. The multiplicity concept in construction Project planning.

Construction management and economics: ASCE, p. 1998, 1998.

LAUFER, A.; TUCKER, R. L. Is construction project planning really doing its job ? A critical examination of focus , role and process. Taylor & Francys, v. 5, p. 243–266, 1987.

LAUFER, A.; TUCKER, R. L. Competence and timing dilema in construction planning.

Construction management and economics: ASCE, n. 6, p. 339–355, 1988.

LEINO, A.; ELFVING, J. Last Planne and zero accidents program integration -

Workforce involvement perspective. 19th Annual Conference of the International

Group for Lean Construction 2011. Anais...2011

LIKER, J. K. . O Modelo Toyota: 14 principios de gestão do maior fabricante do

mundo. Porto Alegre: Bookman, 2005.

LOWE, R. H. et al. A comparison of locationbased scheduling with the traditional

critical path method. (American College of Construction Lawyers, Ed.)San Francisco:

2012

MADERS, B. Técnica de programação e controle da construção repetitiva – linha

de balanço – estudo de caso de um conjunto habitacional. [s.l.] Dissertação de

Mestrado – Programa de Pós-Graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, 1987.

MAGALHÃES, R. M.; MELLO, L. C. B. DE B.; BANDEIRA, R. A. DE M. Planejamento e controle de obras civis: estudo de caso múltiplo em construtoras no Rio de Janeiro.

Gestão & Produção, n. 0, 2014.

MENDES JUNIOR, R. Programação da produção na construção de edifícios de

múltiplos pavimentos. [s.l.] Tese (doutorado) - Departamento de Engenharia de

Produção e Sistemas, Universidade Federal de Santa Catarina, 1999.

MONDEN, Y. Toyota Production System: An Integrated Approach to Just-In-

Time. 1. ed. ed. [s.l.] USA: Industrial Engineering and Management Press, 1983.

MONTECINO, D. A. D. Aplicación del sistema de planificación Last Planner a la

construcción de un edificio habitacional de mediana altura. [s.l.] Memoria

(Pregrado en Ingenieria Civil), Departamento Ingenieria Civil, Universidad de Chile, Santiago de Chile, 2007.

MOURA, C. B.; FORMOSO, C. T. Análise quantitativa de indicadores de planejamento e controle da produção: impactos do Sistema. Ambiente Construído, v. 9, n. 3, p. 57–74, 2009.

OHNO, T. Toyota Production System: beyond large-scale production. 1. ed. ed. USA: Productivity Press, 1988.

OHNO, T. O SISTEMA TOYOTA DE PRODUCAO: ALEM DA PRODUCAO EM

LARGA ESCALA. Porto Alegre: Editora Bookman, 1997.

OLIVIERI, H.; GRANJA, A. D. INTEGRAÇÃO DE SISTEMAS DE PLANEJAMENTO

E CONTROLE DA PRODUÇÃO PARA EMPREENDIMENTOS DA CONSTRUÇÃO CIVIL. Tese: (Doutorado em Engenharia Civil) Programa de pós-graduação faculdade

de de Engenharia Civil, Arquitetura e Urbanismo, Universidade Estadual de Campinas, Campinas, 2016.

OLIVIERI, H.; SEPPÄNEN, O.; GRANJA, A. D. Integrating Lbms, Lps and Cpm: A Practical Process. 24th Annual Conference of the International Group for Lean

Construction, p. 3–12, 2016.

ORDUZ, E. D. Aplicación De La Metodologia De Planeacion Last Planner En El

Mejoramiento De La Productividad, Efectividad Y Eficiencia En El Sistema Constructivo Aporticado (Lean Construccion). Trabajo de grado: (Graduación

Ingenieria Civil)-Escuela de Ingenieria Civil, Universidad Industrial de Santander, Colombia-Santander, 2007.

ORIHUELA, P.; CANCHAYA, L.; RODRIGUEZ, E. Gestión Visualdel Sistema Last

Plannermediante El Modelado Bim. Simpósio Brasileiro de Gestão e Economia da

Construção. Anais...2015

RECK, R. H.; FORMOSO, C. T. AVALIAÇÃO DA APLICAÇÃO DO ÍNDICE DE BOAS PRÁTICAS DE Planejamento em empresas construtoras da região METROPOLITANA DE PORTO ALEGRE. In: ENCONTRO NACIONAL DE

TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 13., 2010. Canela, n. 1, 2010.

ROCHA, F. et al. Logística e Lógica na construção lean: um processo de gestão

transparente na construção de edifícios. [s.l.] Fortaleza: Fibra, 2004.

ROSAS, E.; RÍOS, L.; CARRERA, D. Implementing last planner in open pit mining

projects: Case study. 19th Annual Conference of the International Group for Lean

Construction 2011, IGLC 2011. Anais...2011

SAMAD, G. EL; HAMZEH, F. R.; EMDANAT, S. Last Planner System – the Need for

New Metrics. Proceedings for the 25th Annual Conference of the International Group

for Lean Construction. Anais...Heraklion, Greece: 2017

SEARS, S. K. et al. Construction project management. New Jersey: John Wiley & Sons, 2015.

SEPPÄNEN, O.; MODRICH, R.-U.; BALLARD, G. Integration of Last Planner

System and Location-Based Management System. 23 Annual Conference of the

SERPELL, A.; ALARCÓN, L. F. Planificación y Control de Proyectos. Ediciones

Universidad Católica de Chile, 2001.

SHAPIRA, A.; LAUFER, A. Evolution of involvement and effort in construction planning throughout project life. International Journal of Project Management, v. 11, n. 3, p. 155–164, 1993.

SHINGO, S. Sistema de produção com estoque zero: o sistema Shingo para

melhorias contínuas. Porto Alegre: Bookman, 1996ª.

SHINGO, S. O Sistema Toyota de Produção do ponto de vista da Engenharia de

Produção. 2. ed. ed. Porto Alegre: Bookman, 1996b.

SOARES, A. Diretrizes para a manutenção e o aperfeiçoamento do processo de planejamento e controle da produção em empresas construtoras. Escola de

Engenharia da Universidade Federal do Rio Grande do Sul, p. 139, 2003.

SOMMER, L. Contribuições para um método de identificação de perdas por improvisação em canteiros de obras. p. 150, 2010.

SPEARMAN, M. L.; HOPP, W. J. Factory Physics: Foundations of Manufacturing

Management. USA: McGraw-Hill, 1996.

STRADAL, O.; CACHA, J. Time space scheduling method. Journal of construction

Division, ASCE, p. 1982, 1982.

TAYLOR, F. Princípios de administração cientifica. [s.l.] São Paulo: Atlas, 1990. TOMMELEIN, I. D.; BALLARD, H. G. Lookahead planning: screening and pulling. SEMINÁRIO INTERNACIONAL SOBRE LEAN CONSTRUCTION, 2. São Paulo, 1997

TOYOTA MOTOR COMPANY. Disponível em: <http://www.toyota-global.com/>.

TREMBLAY, M. C.; HEVNER, A. R.; BERNDT, D. J. Focus groups for artifact

refinement and evaluation in design research. Communications of the association for information systems, v.26, p. 599-618, 2010

ULUBEYLI, S.; KAZAZ, A.; ER, B. Planning Engineers’ Estimates on Labor Productivity: Theory and Practice. Procedia -Social and Behavioral Sciences, v. 119, n. 119, p. 12–19, 2014.

VAISHNAVI, V. K.; KUECHLER, W. L. Design Science Research Methods and

Patterns. New York: Auerbach, 2007.

VAN AKEN, J. E. Management research on the basis of the design paradigm: The quest for field-tested and grounded technological rules. Journal of Management

Studies, v. 41, n. 2, p. 219–246, 2004.

VIANA, D. et al. A survey on the last planner system: Impacts and difficulties for

implementation in Brazilian companies. Proceedings for the 18th Annual

Conference of the International Group for Lean Construction. Anais...2010

VIANA, D. D. Compreensão do sistema Last Planner de controle da produção

segundo a perspectiva da linguagem-ação. Dissertação: (Mestrado em Engehnaria

Civil) Programa de Pós-graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul-UFGS, Porto Alegre, 2011.

VILLAS-BÔAS, B. T. MODELAGEM DE UM PROGRAMA COMPUTACIONAL PARA

O SISTEMA LAST PLANNER DE PLANEJAMENTO. Dissertação: (Mestrado em

Engehnaria Civil) Programa de Pós-graduação em Construção Civil, Universidade Federal do Paraná-UFPR, Curitiba, 2004.

VRIJHOEF, R.; KOSKELA, L.; HOWELL, G. Understanding construction supply

chains: na alternative interpretation. Anual conferencen of the international group

for lean construction, 9. Anais...Singapure: 2001

WOMACK, J. P.; JONES, D. T.; ROOS, D. The machine that changed the world. [s.l.] New York: Rawson and Associates, 1990.

WOMACK, J. P.; JONES, D. T.; ROOS, D. A mentalidade enxuta nas empresas:

Apêndice A: Mapeamento sistemático da

literatura

Em relação ao MSL, primeiro foram definidas as palavras que seriam pesquisadas nos buscadores dos Bancos de Dados, as quais deveriam ter aderência ao tema da pesquisa. Nesta parte, foram utilizados termos em inglês, português e espanhol, pois a busca foi realizada também em bases de dados internacionais. Sendo assim foram definidas as palavras “Last Planner System”, “sistema Last

Planner”, “Last Planner”, “último planejador”, “Planejamento e controle da produção”,

“production planning and control” e “PCP”. No processo de busca não foi determinada nenhuma delimitação de período, permitindo o retorno de todos os resultados relacionados ao tema, independentemente do ano de publicação.

Em seguida, foram selecionados os bancos de dados onde seriam realizadas as buscas. Aqui foram contemplados bancos de dissertações e teses Capes, banco de dissertações EAFIT, UIS, UNIANDES, UCHILE e UP, bancos de anais de congressos como ANTAC, CONTECC e IGLC, bancos de dados como EBSCOhost, EMERAL, IEEE e SCIELO, editoriais como ELSEVIER, SPRINGER e TAYLAR & FRANCIS, e revistas científicas como AMBIENTE CONSTRUIDO, ASCE, INGENIERIA Y DESARROLLO e SCIENTIFIC.NET.

Para o armazenamento das informações dos arquivos encontrados nos bancos de dados mencionados anteriormente, foi utilizado o software Microsoft Office Excel 2016. Com os dados dispostos na planilha eletrônica, começou o processo de remoção dos textos, excluindo aqueles que tinham duplicidade ou não tinham relação com o tema identificado por seu título ou resumo.

Após a exclusão dos textos com duplicidade, a análise do MSL realizada nesta pesquisa iniciou com um total de 156 textos (soma dos resultados de todos os bancos de dados procurados). Com essa quantidade de textos resultantes, foi criada uma base de dados onde os textos são filtrados pelas diferentes informações contida no arquivo. Nesses filtros classificou-se nome do autor, ano, país, banco de dados ou tipo de documento como é mostrado na Figura 55.

Figura 55. Base de dados

Uma vez selecionado o filtro desejado para os textos (botão superior esquerdo com nome “Ir aos Resultados”), na mesma base de dados é gerada uma planilha que contém os títulos dos arquivos (Figura 56).

Figura 56. Informação base de dados por filtro

Fonte: AUTORA

Os 156 textos contidos na base de dados, foram classificados e agrupados conforme sua proposta de pesquisa adotada: simulação computacional LPS, linguagem ação LPS, Last Planner System, jogo LPS, integração LPS com outros sistemas, ferramentas computacionais LPS e comparação entre o sistema tradicional e o LPS. Neste agrupamento observou-se que a maior quantidade de textos (119) tem como objetivo de estudo a implementação do Last Planner System. Consequentemente, foram desconsiderados os 37 arquivos restantes pois o objetivo deles não faziam parte desta pesquisa (Figura 57).

Figura 57. Proposta de pesquisa dos textos

Fonte: AUTORA 6 2 119 2 23 1 3 0 20 40 60 80 100 120 140 SIMULAÇÃO COMPUTACIONAL LPS LENGUAGEM-AÇÃO LPS IMPLEMENTAÇÃO LAST PLANNER SYSTEM