Scientific and Technical Advisory Panel

The Scientific and Technical Advisory Panel, administered by UNEP, advises the Global Environment Facility (Version 5)

STAP Scientific and Technical screening of the Project Identification Form (PIF)

Date of screening: 26-3-2008 Screener: Douglas Taylor, STAP Secretary Panel member validation by: N.H. Ravindranath

I. PIF Information

GEFSECPROJECT ID: 3653 GEF AGENCY PROJECT ID:

COUNTRY(IES): Russia

PROJECT TITLE: Energy Efficiency in the Russian Federation (Umbrella Programme)

GEFAGENCY(IES): UNDP (coordinating agency), EBRD, UNIDO

OTHER EXECUTING PARTNERS:

GEFFOCAL AREAS: Climate Change

GEF-4STRATEGIC PROGRAM(S): CC-SP 1 and CC-SP 2 NAME OF PARENT PROGRAM/UMBRELLA PROJECT:

Full size project GEF Trust Fund

II. STAP Advisory Response (see table below for explanation)

1. Based on this PIF screening, STAP’s advisory response to the GEF Secretariat and GEF Agency(ies):

Minor revision required III. Further guidance from STAP

2. The “Umbrella Programme” on “Energy Efficiency in Russian Federation” has a very large potential for energy conservation as well as GHG emission reduction in a cost-effective way. It is a large project aiming to improve energy efficiency in buildings and industrial sector.

i) Scientific and Technological Interventions: IPCC (2007) (http://www.mnp.nl/ipcc/) has broadly

estimated a technical mitigation potential (over baseline) of 26-47%, economic mitigation potential of 13-37%

and market mitigation potential of 14% in Economics in Transition. The technologies identified with the largest mitigation potential for EITs include the following;

Measures covering the largest potential;

1. Pre- and post- insulation and replacement of building components 2. Efficient lighting, esp. shift to CFLs

3. Efficient appliances such as refrigerators and water heaters

Measures providing the cheapest mitigation options;

1. Efficient lighting and its controls

2. Water and space heating control systems 3. Retrofit and replacement of building components

The proposal lists a broad category of technical intervention in; heating, cooling, lighting, appliances, building operation, building construction material (embedded energy) in the building sector. In the Industrial sector the project aims to promote energy efficiency in ‘Industrial Production and Manufacturing”. Given there are hundreds of potential technological interventions in building and industrial sector, it is desirable to have criteria for selecting and prioritizing activities for technological interventions. The criteria could include

• GHG mitigation potential

• Financial viability of the investment or benefit-cost ratio

• Cost-effectiveness of mitigation potential

• Energy or carbon intensity of activity or material

• Ease of removal of barrier and potential impact on spread of technologies.

Referências

Documentos relacionados

PIF Information Copied from the PIF FULL SIZE PROJECT GEFTRUST FUND GEFPROJECT ID: 4841 PROJECT DURATION : 4 COUNTRIES : Uruguay PROJECT TITLE: Strengthening the Effectiveness of the

However, STAP may state its views on the concept emphasising any issues that could be improved and the proponent is invited to approach STAP for advice at any time during the

However, STAP may state its views on the concept emphasising any issues that could be improved and the proponent is invited to approach STAP for advice at any time during the

However, STAP may state its views on the concept emphasising any issues that could be improved and the proponent is invited to approach STAP for advice at any time during the

At the CEO endorsement phase, STAP expects that project proponents provide specific details on how to assure and enforce sustainability of bamboo plantations and processing without

PIF Information Full size project GEF Trust Fund GEFSECPROJECT ID:3555 GEF AGENCY PROJECT ID:4043 COUNTRYIES:INDIA PROJECT TITLE:ENERGY EFFICIENCY IMPROVEMENTS IN COMMERCIAL

However, STAP may state its views on the concept emphasising any issues that could be improved and the proponent is invited to approach STAP for advice at any time during the

One or more options that remain open to STAP include: i Opening a dialogue between STAP and the proponent to clarify issues ii Setting a review point during early stage project