Sample Procurement Plan

N/A
N/A
Protected

Academic year: 2021

Share "Sample Procurement Plan"

Copied!
6
0
0

Texto

(1)

July 9, 2010

Sample Procurement Plan

(Text in italic font is meant for instruction to staff and should be deleted in the final version of the

PP)

(This is only a sample with the minimum content that is required to be included in the PAD. The

detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance

with the guidelines. The initial procurement plan will cover the first 18 months of the project and

then updated annually or earlier as necessary).

I. General

1.

Bank’s approval Date of the procurement Plan

[Original: December 2007]: Revision

15 of Updated Procurement Plan, June 2010]

2.

Date of General Procurement Notice:

Dec 24, 2006

3.

Period covered by this procurement plan:

The procurement period of project covered

from year June 2010 to December 2012

II. Goods and Works and non-consulting services.

1.

Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as

stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable

procurement methods (not limited to the list below) will be determined by the

Procurement Specialist /Procurement Accredited Staff based on the assessment of the

implementing agency’s capacity.]

Procurement Method

Prior Review Threshold

US$

Comments

1.

ICB and LIB (Goods)

Above US$ 500,000

All

2.

NCB (Goods)

Above US$ 100,000

First contract

3.

ICB (Works)

Above US$ 15 million

All

4.

NCB (Works)

Above US$ 5 million

All

5.

(Non-Consultant Services)

Below US$ 100,000

First contract

[Add other methods if necessary]

2.

Prequalification. Bidders for _

Not applicable

_ shall be prequalified in accordance with

the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3.

Proposed Procedures for CDD Components (as per paragraph. 3.17 of the

Guidelines: [Refer to the relevant CDD project implementation document approved by

the Bank or delete if not applicable]

4.

Reference to (if any) Project Operational/Procurement Manual:

Project

Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by

<mention name of PIU>

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

July 9, 2010

5.

Any Other Special Procurement Arrangements: [including advance procurement and

retroactive financing, if applicable]

5 ICB works packages will be financed under

retroactive financing

6.

Summary of the Procurement Packages planned during the first 18 months after project

effectiveness ( including those that are subject to retroactive financing and advanced

procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1

2

3

4

5

6

7

Ref.

No.

Description

Estimated

Cost

US$

million

Packages

Domest

ic

Prefere

nce

(yes/no)

Review

by Bank

(Prior / Post)

Comments

Summary of

the ICB

(Works)

82

5

No

Prior

Summary of

the ICB

(Goods)

43.77

15

No

Prior

Summary of

the NCB

(Works)

64.53

18

No

Post

1

st

contract

for Prior

Review

Summary of

the NCB

(Goods)

1.86

4

No

Post

1

st

contract

for Prior

Review

Summary of

the ICB

(Non-Consultant

Services)

0.45

1

No

Prior

III. Selection of Consultants

1.

Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated

in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method

Prior Review Threshold

Comments

1.

Competitive Methods (Firms)

Above US$ 100,000

2.

Single Source (Firms)

All

3.

Individual

Above US$ 50,000

2.

Short list comprising entirely of national consultants: Short list of consultants for

(3)

July 9, 2010

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the

Consultant Guidelines.

3.

Any Other Special Selection Arrangements: [including advance procurement and

retroactive financing, if applicable or delete if not applicable]

4.

Consultancy Assignments with Selection Methods and Time Schedule

1

2

3

4

5

6

Ref. No.

Description of

Assignment

Estimated

Cost

US$

million

Packages

Review

by Bank

(Prior /

Post)

Comments

Summary of

number of

contracts that

will be let

under QCBS

4.17

7

Prior

Summary of

number of

contracts that

will be let

under other

methods

0.83

1

Prior

CQS

(4)

Page 1

PROCUREMENT

PLAN

Brazil : BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT

General Information

Country:

Brazil

Banks Approval Date of the Original Procurement Plan:

2017-04-28

Revised Plan Date(s): (comma delineated, leave blank if none)

2017-08-23

Project ID:

P147157

GPN Date:

Project Name:

BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT

Loan / Credit No:

IBRD / 84150

Executing Agency(ies): Company for Development and Regional Affairs of the State of Bahia, Luis Eduardo Magalhaes Foundation, Company for Water Engeneering and for Sanitation of Bahia

WORKS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess Prequalification(Y/N) Amount (US$)Estimated Actual Amount(US$) ProcessStatus Draft Pre-qualificationDocuments Evaluation ReportPrequalification Draft Bidding Document/ Justification Specific ProcurementNotice / Invitation Bidding Documents asIssued Proposal Submission /Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-NA-155-O-#TIT_LPN# / Obras para os subprojetos de abastecimento de água e esgotamento .

Post Request for Bids Open - National 8,796,992.00 0.00Canceled 2015-06-08 2015-06-17 2015-06-19 2015-06-22 2015-07-01 2016-07-01

GOODS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Procurement Process Prequalification (Y/N) Estimated Amount (US$) Actual Amount (US$) Process Status Draft Pre-qualification Documents Prequalification Evaluation Report

Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-NA-227-B-#TIT_LPN# / Aquisição de 100 veículos utilitários, duas VANS e dois veículos tipo pick up.

Prior Request for Bids Open - National 1,755,969.00 0.00Canceled 2015-10-20 2015-11-03 2015-11-03 2015-11-10 2015-11-20 2016-05-20

NON CONSULTING SERVICES

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess Prequalification(Y/N) Amount (US$)Estimated Actual Amount(US$) ProcessStatus Draft Pre-qualificationDocuments Evaluation ReportPrequalification Draft Bidding Document/ Justification Specific ProcurementNotice / Invitation Bidding Documents asIssued Proposal Submission /Opening / Minutes

Bid Evaluation Report and Recommendation

for Award

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-NA-279-S-LOC / Contratação de empresa para coleta de dados para a Linha de Base do Projeto Bahia Produtiva.

Post Request for

Quotations Limited - National 222,369.00 0.00 Pending

Implementation 2016-09-29 2017-09-29

BR-CERB-BA-16687-NC-RFQ / Analises Fisico Quimica de Mananciais.

IBRD / 84150 Household Water and Sanitation Post Request forQuotations Open - National Single Stage - OneEnvelope 60,000.00 0.00PendingImplementation 2017-06-25 2017-08-20 2018-02-16

CONSULTING FIRMS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Estimated Amount (US$)

Actual Amount

(US$) Process Status Terms of Reference

Expression of Interest Notice

Short List and Draft Request for Proposals

Request for Proposals as Issued Opening of Technical Proposals / Minutes Evaluation of Technical Proposal Combined Evaluation Report and Draft Negotiated Contract

Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-NA-70-CF-SBCC / Contratação de empresa especializada para fiscalizar a execução dos subprojetos de abastecimento de água.

Post Quality And

Cost-Based Selection Open - National 172,000.00 0.00 Pending

Implementation 2014-11-03 2014-11-03 2014-11-03 2014-11-03 2015-12-31 BR-NA-225-CF-SCC /

Contratação de empresa especializada para prestação de serviços de Assistência Técnica Agropecuária e Extensão Rural (Equipe Multidisciplinar).

Post

Consultant Qualification Selection

Open - National 815,789.00 0.00Pending

Implementation 2016-01-05 2016-02-23 2017-02-23

BR-NA-285-CF-SCC / Contratação de empresa para formação dos Conselhos Municipais por meio de plataforma EAD.

Post

Consultant Qualification Selection

Open - National 20,000.00 0.00Pending

Implementation 2016-09-14 2016-10-28 2016-10-28 BR-NA-283-CF-SCC /

Contratação de empresa para a realização de estudo, análise, formação e acompanhamento dos subprojetos das cadeias produtivas do Bahia Produtiva.

Post

Consultant Qualification Selection

Open - National 20,000.00 0.00Pending

Implementation 2016-09-23 2016-11-18 2017-11-18

BR-NA-284-CF-SCC / Contratação de empresa para elaboração do plano de emancipação dos distritos de irrigação.

Post

Consultant Qualification Selection

Open - National 20,000.00 0.00Pending

Implementation 2016-10-04 2016-11-18 2017-11-18 BR-NA-287-CF-CD /

Contratação de empresa para o desenvolvimento de aplicativo para realização de compras on-line das aqusições a serem realizadas pelas entidades beneficiadas pelo Projeto.

Post Direct Selection National 30,000.00 0.00PendingImplementation 2016-09-13 2017-09-13

BR-NA-280-CF-SCC / Contratação de empresa para a elaboração dos Planos de Negócios dos empreendimentos coletivos dos Editais voltados aos Subprojetos Orientados para o Mercado referentes ao Componente 01- Inclusão Produtiva e Acesso a Mercados.

Post

Consultant Qualification Selection

(5)

Page 2 BR-NA-68-CF-SBCC /

Contratação de empresa especializada para elaborar e analisar subprojetos de abastecimento de água

Post Quality And

Cost-Based Selection Open - National 258,000.00 0.00Canceled 2015-12-01 2016-01-04 2016-01-06 2016-01-08 2015-03-31

INDIVIDUAL CONSULTANTS

Activity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Amount (US$)Estimated Actual Amount(US$) Process Status Terms of Reference

Invitation to Identified/Selected

Consultant

Draft Negotiated

Contract Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BR-NA-183-CI-3CV / Contratação de consultoria para prestar serviços de capacitação ao Projeto Bahia Produtiva, com o objetivo de apoiar o planejamento, implementação, acompanhamento e avaliação dos processos de capacitação de gestores, colaboradores e equipe

Post Individual ConsultantSelection Limited 63,000.00 0.00PendingImplementation 2015-07-30 2017-07-30

BR-NA-65-CI-IC / Contratação de consultoria para o Desenvolvimento de Designer e embalagens da agricultura familiar

Post Individual Consultant

Selection Limited 10,000.00 0.00 Pending Implementation 2014-08-01 2015-12-31 BR-NA-203-CI-IC / Contratação de consultor para desenvolvimento de sistema informatizado para elaboração de projetos de desenvolvimento subterritorial.

Post Individual Consultant

Selection Limited 40,000.00 0.00 Pending

Implementation 2015-10-16 2016-01-16

BR-NA-229-CI-IC / Assessorar a equipe do Projeto Bahia Produtiva no processo de seleção de profissionais especializados em Planos de Negócios, orientar e acompanhar a elaboração dos Planos de Negócios por esses profissionais. O consultor também irá supervisi

Post Individual ConsultantSelection Limited 60,000.00 0.00PendingImplementation 2016-01-11 2017-01-11

BR-NA-246-CI-IC / Contratação de consultor especialista em Tecnologia da Informação.

Post Individual ConsultantSelection Limited 55,000.00 0.00PendingImplementation 2016-09-02 2017-09-02 BR-NA-275-CI-IC / Contratação

de consultor especialista em mercado para desenvolvimento da estratégia de atuação do Projeto na implementação de alianças produtivas.

Post Individual Consultant

Selection Limited 39,100.00 0.00 Pending

Implementation 2016-10-05 2017-10-05

BR-NA-274-CI-IC / Contratação de consultor especialista em desenvolvimento territorial para elaborar a estratégia de arranjos produtivos territoriais integrados aos Planos Territoriais de Desenvolvimento Sustentável.

Post Individual ConsultantSelection Limited 52,632.00 0.00PendingImplementation 2016-08-24 2017-08-24

BR-NA-272-CI-IC / Contratação de consultor especialista em desenvolvimento territorial para desenvolver as orientações metodológicas de Planejamento Territorial.

Post Individual Consultant

Selection Limited 47,740.00 0.00 Pending

Implementation 2016-10-04 2017-10-04

BR-NA-276-CI-IC / Contratação de consultor especialista em desenvolvimento territorial para desenvolvimento do Sistema de Informações Territoriais do estado da Bahia.

Post Individual ConsultantSelection Limited 31,579.00 0.00PendingImplementation 2016-09-22 2017-09-22

BR-NA-277-CI-IC / Contratação de consultor especialista em mercado para desenvolvimento da estratégia de atuação do Projeto no mercado de orgânicos, fair trade e exportações.

Post Individual Consultant

Selection Limited 26,316.00 0.00 Pending

Implementation 2016-09-23 2017-09-23

BR-NA-182-CI-IC / Estudo e mapeamento do potencial hídrico dos municípios de abrangência do componente 2 do Projeto Bahia Produtiva.

Post Individual ConsultantSelection Limited 40,000.00 0.00Canceled 2015-05-19 2016-11-19

BR-NA-209-CI-3CV / Análise e estudo da cadeia produtiva de mandiocultura

Post Individual ConsultantSelection Limited 10,000.00 0.00Canceled 2016-01-07 2017-01-07 BR-NA-189-CI-IC / Análise e

estudo da cadeia produtiva de caprinocultura.

Post Individual Consultant

Selection Limited 40,000.00 0.00Canceled 2015-10-20 2015-12-20 BR-NA-187-CI-IC / Análise de

projetos de irrigação. Post

Individual Consultant

(6)

Page 3 BR-NA-184-CI-3CV /

Contratação de consultoria para prestar suporte técnico na implementação da Avaliação de Impacto do Projeto Bahia Produtiva. O consultor irá apoiar a Avaliação de Impacto prestando suporte ao pesquisador principal e à equipe do Projeto na

Post Individual ConsultantSelection Limited 29,000.00 0.00Canceled 2015-07-29 2017-07-29

BR-NA-185-CI-3CV / Contratação de consultoria para prestar suporte técnico durante a fase de implementação da Avaliação de Impacto do Projeto Bahia Produtiva._x000D_ Apoio a Avaliação de Impacto.

Post Individual ConsultantSelection Limited 15,000.00 0.00Canceled 2015-07-29 2017-07-29

BR-NA-188-CI-IC / Análise e estudo da cadeia produtiva de bovinocultura do leite.

Post Individual Consultant

Selection Limited 25,000.00 0.00Canceled 2015-06-01 2015-10-01 BR-NA-208-CI-IC / Análise e

estudo da cadeia produtiva de fruticultura.

Post Individual ConsultantSelection Limited 10,000.00 0.00Canceled 2015-11-30 2016-11-30 BR-NA-206-CI-IC / Análise e

estudo da cadeia produtiva de oleaginosas.

Post Individual Consultant

Referências

Documentos relacionados

Esse amplo panorama do amor cristão, como fundamento do nosso serviço aos demais, a favor de um desenvolvimento sempre mais humano e ambientalmente sustentável, permite- nos

1-rural, o valor médio da terra-nua e das benfeitorias divulgado pelo INSTITUTO DE ECONOMIA AGRÍCOLA da Secretaria de Agricultura e Abastecimento do Estado de

Este teste permite verificar se a tinta existente pertence ao grupo das que formam a película por evaporação de solventes (ex: acrílica, borracha clorada, vinílica), pelo

Foi utilizado um modelo autoregressivo de séries temporais para entender as relações entre oscilação do nível, clima e vegetação na bacia do Guarantã, que se encontra em uma

A construção da primeira unidade Habitacional foi usada como “escola” para que os trabalhadores envolvidos pudessem aprender a tecnologia de construção e hoje está

Entre os meses de maio de 1999 e setembro de 2001 o sistema de remediação foi monitorado através de poços de monitoramento localizados a montante, jusante e interior da barreira,

thuringiensis, a grande variabilidade genética identificada entre os diferentes isolados leva a utilização de técnicas avançadas, como a PCR (Reação em Cadeia da

A construção de um paradidático em quadrinhos foi uma utopia transformada em realidade por nós. Pensando em buscar alternativas viáveis para a construção do conceito de