Vol-7, Special Issue-Number5-July, 2016, pp1251-1255 http://www.bipublication.com Case Report

Factors for implementation of development projects with an emphasis on

preliminary estimates project

(Case Study flagship project of Ilam)

Abdollahian Vahed1 and SafariMahdieh2

1Member of the Scientific 2

Civil Engineering Faculty of Science and Culture

ABSTRACT

Without a doubt optimum performance is possible in the context of a planned development project organized failure to comply with a standard patterndoes not guarantee when a project based on financial forecasts and with the required quality. in this study, based on the standards of project management enumerating the factors for implementation of a project the study is the flagship project of Ilam and finally the implementation of the project as stated in the standard are investigated. in this research project emphasizing the preliminary estimates (estimates and time and workload) has been considered and compared to the existing. according to the research findings in 83 percent of projects, project was not according to preliminary financial estimates. 100% of projects have been wrong to predict the time and projects have progressed according to preliminary forecast and in 66 percent of projects supporting private sector investment and hinder the progress of the project is appropriate and the project framework was unchanged.

Key words:Financial estimates and time,ProjectFramework,Optimum performance,Civil projects, Project

Management Body of Knowledge, Ilam

1. INTRODUCTION

Management planning country of unfinished projects in the country has four categories: description of errorand inaccuracy in preliminary estimatesadded volume or work items,defects on

the runProblems and proceduresother

problems(The employer and the weakness of project managers, etc.)in this study Underlying this division has been the flagship project of Ilam provinceas follows:Central library Ilam, Olefin petrochemical, Dehloran petrochemical, Dehloran cement, Kabirkuh tunnel And fifteen thousand Ilam StadiumAnd the reasons for the unfinished projects has been examined.Initial estimates in

this study included the following

Projects:financial estimates and when the project as well as the volume of work that must be done (Change in framework of the project)and

compared the situations under consideration was real project.

Based on project management body of knowledge ,of the nine project management processes three project framework management, project time

management, project cost management is

studied.in casethe project framework management processes needed to ensure the successful completion of the project is studied essentially defining and controlling what is and what is not in the project have been analyzed.

Second, the Project Time Management includes the processes timely completion of the project is studied,in the field of definition and sequencing activities, estimating resources and time activities,

preparation and control is expressed

(2)

Abdollahian Vahed, et al. 1252

management that includes processes associated with estimating and budgeting, and controlling costs so that the project can be completed with the approved budget.the flagship project of the study have been evaluated in three areas mentioned.

2. DESCRIPTION OF PROBLEM

Various aspects of the project in terms of project management body of knowledge studied and the matching funds with the implementation of project management processes are nine and pathology of the project and provide solutions to fix these damages action.in this research project unfinished index Ilam province simply by taking three processes of project framework management, time management and project cost management were discussed.

2.1 Project Cost Management

including that construction Today, the country faces and delays in projects and construction isit can be noted in several cases, such asthe lack of accurate knowledge of the volumes and values of project activities ,incorrect estimates of the amount of resources needed,weaknesses in project cost planning and budgeting activities,poor control of project cost performancein general weakness in project cost management system.it is obvious that move with time and use of science and modern techniques to guarantee success in financial management projects.one of the most important issues in construction project management is project cost management.today, the problem of

accurate and comprehensive project cost

management including resource planning, cost estimating, budgeting and cost control has become to one of the main concerns of the custodians and practitioners project given that the majority of construction projects of the state's annual budget account for,, perhaps one of the most important parts are the fourth five-year planwhich should sound management fees in accordance to be completed with the approved budget and scheduled.Obviously, the correct pattern for cost

management on construction projects, the

demands and needs of project managers in the

country and it seems important more than ever.. cost estimation process is usually done before and during project implementation,while the project cost control process doneexecution timethese two processes can have two different organizing andis done by different people,the software used for these two processes is different.therefore, the data is available cost estimation and cost controlusually the tables, surfaces and different details which may complicate cost control process for the incompatibility between the cost estimation and cost control, and effect on project cost analysis and cost control decisions by the engineer managed by Project Manager.

2.2 Project Time Management

Describing the project time management

processes are required to ensure timely completion of projectand includes the relationship is

defined,estimated duration of

activities,preparation of schedule and timing control.

Including those that seem more important in the study of this process includethe use of software for scheduling and project control such as primavera ability and skill in using manual techniques scheduling and project control,use the

control team workshops and project

scheduling,progress in accordance with the project schedule,belief in or contractor to implement the project schedule.the estimated project duration is estimated to be due to errorif not including those

at issue must be considered time

(3)

tastes,management changes,differing priorities,the difference in the attitude of officials,and political issues.

2.3 Project Framework Management

Project Framework Management processes is necessary descriptor to ensure the life of the project includes all activities necessaryand extra work be do not about itincluding theimagine development project,scope development and

control,definition and control it.the most

important issue to be considered in the project scope includeact quickly to appoint a project manager,the contractor to benefit from the knowledge and experience and do the same things with the same ongoing project,changes in workload, changeproject plans ,increase or decrease the objectives of the project.focus on the goals of the project volumes have been considered in reviewing projects under studyfrom this perspective, the action is basedlibrary studies

athletics, about the possibility of listed

itemsshown in Table 1[1] .

3. CHECK THE FLAGSHIP PROJECT OF ILAM

The large size of the country's annual budget is spent on the construction or completion of construction projects however, the delay in national development projects and problems in implementing one of the most common issues such projectsthat is why it is essential to identify and analyze the causes of delay.Ilam province as one of the leading provinces in terms of the number of unfinished projects in Iran,so that the life of a number of projects in the province last half-century killing. According to the chief executives there are 73unfinished construction projects in this province.Under the proposed conditions of public information for the six flagship project of Ilam.

3.1 Central Library

The project is being constructed in Ilam. its construction started in 2001 on a land area of 500 meters and a building area of three thousand and five thousand and 710 sq.m andis facing a shortage of creditnow with advances 95%, to

exploit needs to budget more than twenty billion riyalsthe project is not operational after 14 years.

3.2 Olefin Petrochemicals

The project started in 2001,due to the delay of four years, after 14 years are not yet available.the project is creation of jobs and the capacity of oil and gas provincethe reasons for the delay cited lack of funding projects, privatizationand have already been put into operation the first phase andOlefin is on the verge operation.The industrial complex is being built in two phases ,to use all of it, a million tons produced annually andcreates direct employment for 700 people.the plant produces annually460 thousand tons of ethylene, 120 thousand tons of polypropylene and 140 thousand tons of pyrolysis gasoline, 85 thousand tons and 33 thousand tonnes of fuel oil four carbon cuts.

3.3 DehloranPetrochemical

The project that should start in 2001 but has been delayed in 2009after six years, is still in its beginnings.has been delayed due to lack of cooperation from the private sectorwhich have already been privatized to another company.The importance of oil and gas projects due to capacity utilization and employment Dehloran city is four thousand.Executive Petrochemicals Dehloran has started work in an area of 200 hectares, including three large production units olefin and style and offsite units and ancillary services.

3.4 Dehloran cement

The project has not been operational for

years.Cement Dehloran Company was

registeredvn 2002 under number 199 280 in Tehran Companies Registration Office and non-commercial establishments subject of a cement plant with a capacity of three thousand and 300 tons per day in Dehloran, Ilam.despite years of operation of the factory started it is not yet operational.

(4)

Abdollahian Vahed, et al. 1254

progress has been closed due to financial problems.

3.5 Kabirkuh tunnel

The project started in 2009. The project is beginning with 400 meters of drilling.after six years of work, the project is still in its infancyimplementation of the project has been halted.KabirKuh tunnel is one of the most important tunnels in Iran withfour thousand and 800 meters long, seven meters high, 12 meters wide and 270 meters secondary tunnel.The project is 30% complete and the budget amounted to trillion riyals.

3.6 Stadium 15 Thousand

Begin construction of the stadium 15 thousand Ilam to 2007 anddespite being opened once before, but it turned out great deficiencieswhich is now stagnant plan.Poject delays due to shortage of funds and lack of official listed. stadium facilities Ilam is billiard hall with an area of 360 square meters, 360 square meters area table tennis hall with an area of 420 square meter shooting gallery, players and referees changing rooms, first aid room, the press table, fire facilities, police

stations, hall 8-lane track interviews and standard and 400 m hall open space office[2] .

4. RESEARCH

FINDINGS

Management and Planning Organization,

discussed long time to run projects since 1970 have been discussed at meetings of the Economic Council has continued until this time.However, so far has failed to provide a solution regulated.the agency has classified the causes of delays in four categories as follows:1-mistakes and inaccuracy in preliminary estimates, 2-added volume or work items ,3-defects, problems in procedures,4-other problems(the role of the employer and the weakness of project managers).

The research is specifically focused on

preliminary estimates and forecasts relevant section in other wordsalso discussed is the

importance of preliminary estimates

projectoperating mistakes and inaccuracy in preliminary estimates project(three project cost, project duration and framework of the project) examined were considered.In Table 1.the results of this article is reflected in the projects studied. Table(1) Terms of projects in compliance with the project management body of knowledge

Other problems(role client and weaknesses in

project management) Deficiencies, Problems in procedures Project framework management Project cost management Project time management Project Does not Does not Does not No estimate of the financial cost and

budget Failure to accurately estimate completion time Library Central Ilam Hypothyroidism public and private sectors

Deficit procedures In the public and

private sector

Does not No estimate of the financial cost and

budget Failure to accurately estimate completion time Olefin petrochemical

Lack of cooperation of the

private sector

Deficit procedures In the public and

private sector Does not Does not Failure to accurately estimate completion time Dehloran Petrochemical Hypothyroidism public

and private sectors

Deficit procedures In the public and

private sector

Does not No estimate of the financial cost and

budget Failure to accurately estimate completion time Dehloran cement Does not Does not Does not No estimate of the financial cost and

budget Failure to accurately estimate completion

time Kabirkuh tunnel

Lack of public sector

Deficit procedures In the public

sector Does not

No estimate of the financial cost and

budget Failure to accurately estimate completion

time Stadium

5. SUGGESTED ROUTES: In Ilam these

reasons, the unfinished projects that

(5)

employers and weaknesses of project managers)that it can be solved with solutions

in the following tables[3]. Table (2)

Time management proposals for development projects

Planning and scheduling forming unit in the municipality with the city council to determine the appropriate time

Increase administrative methods different

Consulting engineers penalty in case of delay in the preparation of maps

Technical assessment and detailed analysis items

Strengthening the technical knowledge and familiarity with the new knowledge management related to project management

Be more careful when reviewing the administrative records of the contractor by the employer and consultant

Employers and urban projects apply to the implementation of projectsafter securing the approved budget absorption, not after the bids and determine contractor

Monitoring consumer materials projects

Allocation of trained counselors and qualified for use in various projects andextensive qualitative research before the start of the project

Avoid long time to run projects withconstruction operations are scheduled proportional allocation of credit andfinancial proper nutrition projects

Assessment of financial and administrative contractors

Reform of equipments and manpower required in projects

Offering solutions to various problems

Other problems

Create urban management organizations to act so relevant organs under the municipality

The employer role

Scientifically engineered to increase in the cost estimation project

Weaknesses in management

The use of specialists and relevant in the field of urban design projects

Weaknesses in management

6. RESULTS

According to the results of the flagship project was not 100 percent when the project progress according to preliminary forecastsand none of the projects may not be completed in time foreseen.the financial estimate has been made in 83% of projectsand it also means that projects face a shortage of creditand stagnate in the run route.in the case of all projects adhere to the framework of the project andoverall changes were not applied in specific projects.

7. REFRENCES

1. I

nterpreters National Petrochemical

Company(2005) Project management body of

knowledge(America National Standard-

PMBOK).

2. City Semi-finished

projects(Ilam),Mehr news agency.

3. SafaviA,Shayanfar

Referências

Documentos relacionados

Após compreender a ideia de ensino de História professada pelos representantes autorizados do IHGB no parecer do livro didático Lições de história pátria , pretendo, neste

O objetivo deste projeto passa então pela criação de um ambiente de modelação que permita a criação dos modelos e a verificação da sua integridade, a configuração dos nós do

A BEME tem por func¸˜ao a aquisic¸˜ao dos sinais de torque e rotac¸˜ao para a determinac¸˜ao da potˆencia mecˆanica e a aquisic¸˜ao dos sinais de tens˜ao e corrente para

Apoiado no estudo analítico da Teoria Crítica e das teorias clássicas dos movimentos sociais, o trabalho apresenta uma síntese conceitual da Teoria Crítica e de seus desdobramentos

Antes do avanço da petroquímica, a pirólise da madeira em retortas provia uma grande quantidade de produtos químicos além do carvão, principalmente o metanol e

Contudo, por falta de dados de capital humano, foram excluídos dessa análise dois municípios, Jaguaraçu e Serra da Saudade, os quais não foram afetados

O recurso à filtração adicional é uma das formas de controlar a exposição, pois causa a atenuação dos fotões de baixa energia que contribuem para a dose e não para

Abstract: ‘Chandler’, ‘Oso Grande’ and ‘Sweet Charlie’ strawberry cultivars were harvested at four stages of color development ranging from color break to full red and stored