PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL(SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): M 1,000 M 3,959 M2 1,000 H 2,000

N/A
N/A
Protected

Academic year: 2021

Share "PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL(SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): M 1,000 M 3,959 M2 1,000 H 2,000"

Copied!
63
0
0

Texto

(1)

CODIGO

DESCRIÇÃO

UND

COEF.

PREÇO UNIT.

01.00.00

SERVIÇOS PREELIMINARES

01.00.01 COMP_TE M2

COMP_TE_01 ART DE EXECUÇÃO TX 1,000 COMP_TE_02 ART DE CONSULTORIA TX 1,000 COMP_TE_03 ART'S (FONTE CREA-AM) TX 1,000 COMP_TE_04 ALVARA DE CONSTRUÇÃO TX 1,000

COMP_TE_05 HABITE-SE TX 1,000

COMP_TE_06 ELETROBRÁS- AMAZONAS ENERGIA TX 1,000

8.700,48 - 8.700,48 24,96% 2.171,64 10.872,12

02.00.00

INSTALAÇÕES PROVISÓRIAS

02.00.01 74209/001 M2

4417 PECA DE MADEIRA LEI 1A QUALIDADE 2,5 X 7,5CM (1 X 3") NAO APARELHADA

M 1,000

4491 PECA DE MADEIRA 3A/4A QUALIDADE 7,5 X 7,5CM (3X3) NAO APARELHADA

M 3,959

4813 PLACA DE OBRA (IDENTIFICACAO) PARA CONSTRUCAO CIVIL EM CHAPA GALVANIZA

M2 1,000

5075 PREGO DE ACO 18 X 30 KG 0,090 5652 CONCRETO NAO ESTRUTURAL,

CONSUMO MINIMO 150 KG/M3 (1:4:5)

M3 0,011

1213 CARPINTEIRO DE FORMA H 1,000 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 2,000 249,93 23,61 273,54 24,96% 68,28 341,82 02.00.02 74242/001 M2 367 AREIA GROSSA M3 0,030

938 FIO RIGIDO, ISOLACAO EM PVC 450/750V 1,5MM2

M 0,015

1030 CAIXA DESCARGA PLASTICA, EXTERNA, COMPLETA COM TUBO DE DESCARGA, ENGAT

UN 0,030

1031 TUBO DE DESCIDA (DESCARGA) EXTERNO PVC P/ CX DESCARGA EXTERNA - 40MM X 1,60M

UN 0,030

1357 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1M (12MM) P/ FORMA CONCRETO

UN 0,510

1379 CIMENTO PORTLAND CP-320 KG 12,650 1966 CURVA PVC 90G CURTA PVC P/ ESG

PREDIAL DN 100MM

UN 0,030

2425 DOBRADICA ACO ZINCADO 3 X 3" SEM ANEIS

UN 4,900

3080 FECHADURA EMBUTIR EXTERNA (C/ CILINDRO) COMPLETA - LINHA POPULAR

CJ 0,090

3764 LAMPADA INCANDESCENTE 60W UN 0,150 4425 PECA DE MADEIRA DE LEI 1A QUALIDADE

6 X 12CM NAO APARELHADA M 0,030 158,00 60,000 60,00 158,000 158,00 4.083,240 4.083,24 4.083,24 4.083,24 158,000 158,00 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL(SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

12,400 3,470 3,47 4,990 19,76 222,870 222,87 6,660 0,60 294,37 3,23 9,530 9,53 3,450 0,10

COMPOSIÇÃO DE CUSTO UNITARIO

PREÇO TOTAL

COMPOSIÇÃO UNITARIA

PLACA DE OBRA EM CHAPA DE ACO GALVANIZADO

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

54,000 1,62

0,600 0,01

BARRACAO DE OBRA EM CHAPA DE MADEIRA COMPENSADA COM BANHEIRO, COBERTURA EM FIBROCIMENTO 4 MM, INCLUSO INSTALACOES HIDRO-SANITARIAS E ELETRICAS 0,680 8,60 TAXAS E EMOLUMENTOS 158,000 0,37 3,750 18,38 0,62 0,36 63,360 32,31 25,250 2,27 0,640 0,10 12,100 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 7,040 14,08 20,650

(2)

4430 PECA DE MADEIRA DE LEI 1A QUALIDADE 5 X 6CM NAO APARELHADA

M 1,300

4509 PECA DE MADEIRA 3A QUALIDADE 2,5 X 10CM NAO APARELHADA

M 3,830

4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,030 5069 PREGO DE ACO 17 X 27 KG 0,275 5088 PORTA CADEADO ZINCADO OXIDADO

PRETO

UN 0,090

6140 BOLSA DE LIGACAO EM PVC FLEXIVEL P/ VASO SANITARIO 1.1/2" (40MM)

UN 0,030

6141 ENGATE OU RABICHO FLEXIVEL PLASTICO (PVC OU ABS) BRANCO 1/2" X 30CM

UN 0,060

6146 SIFAO PLASTICO P/ LAVATORIO/PIA TIPO COPO 1 1/4"

UN 0,030

6158 VALVULA EM PLASTICO BRANCO 1" SEM UNHO C/ LADRAO P/ LAVATORIO

UN 0,030

7191 TELHA FIBROCIMENTO ONDULADA VOGATEX 4MM 2,44 X 0,50M

UN 1,530

7608 CHUVEIRO PLASTICO BRANCO SIMPLES UN 0,030 9836 TUBO PVC P/ ESG PREDIAL DN 100MM M 0,310 9868 TUBO PVC SOLDAVEL EB-892 P/AGUA

FRIA PREDIAL DN 25MM

M 0,380

10420 VASO SANITARIO SIFONADO LOUCA BRANCA - PADRAO POPULAR

UN 0,030

10425 LAVATORIO LOUCA BRANCA SUSPENSO 29,5 X 39,0CM OU EQUIV-PADRAO POPULAR

UN 0,030

11753 REGISTRO PRESSAO 3/4" BRUTO REF 1400

UN 0,030

11865 CAIXA D'AGUA FIBROCIMENTO REDONDA C/ TAMPA 500L

UN 0,030

12128 INTERRUPTOR SOBREPOR 1 TECLA SIMPLES, TIPO SILENTOQUE PIAL OU EQUIV

UN 0,150

12296 BOCAL/SOQUETE/RECEPTACULO DE PORCELANA

UN 0,140

13415 TORNEIRA CROMADA 1/2" OU 3/4" REF 1193 P/ LAVATORIO - PADRAO POPULAR

UN 0,030

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,160 2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,160

4750 PEDREIRO H 0,360

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,982 1213 CARPINTEIRO DE FORMA H 0,955 123,52 30,16 153,68 24,96% 38,36 192,04 02.00.03 COMP1 UN 12769 HIDROMETRO 1,5 M3/H UN 1,000 9868 TUBO PVC SOLDAVEL EB-892 P/AGUA

FRIA PREDIAL DN 25MM

M 40,005

2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 6,005

6116 AJUDANTE DE ENCANADOR H 2,001 157,27 72,78 230,05 24,96% 57,42 287,47 02.00.04 73960/001 UN

392 ABRACADEIRA TIPO D 1/2" C/ PARAFUSO UN 1,000

12365 ISOLADOR TIPO CARRETILHA - MARROM 72 X 72 MM

UN 4,000

12353 FUSIVEL ROSCA 15A - 250V FIXO UN 4,000

3,410 0,51 1,740 0,24 30,000 0,90 13,490 2,16 9,530 1,52 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

INSTAL/LIGACAO PROVISORIA ELETRICA BAIXA TENSAO P/CANT OBRAOBRA,M3-CHAVE 100A CARGA 3KWH,20CV EXCL FORN MEDIDOR

0,480 0,48 4,030 16,12 1,500 6,00 9,530 3,43 7,040 13,95 9,530 9,10 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): LIGAÇÃO PROVISORIA DE AGUA

74,460 74,46 2,070 82,81 9,530 57,23 7,770 15,55 13,960 21,36 5,730 0,17 7,250 2,25 2,070 0,79 84,000 2,52 37,710 1,13 23,550 0,71 192,340 5,77 0,22 2,080 1,700 0,05 2,220 0,13 7,190 6,79 5,220 0,06 0,41 2,570 9,84 103,540 3,11 6,620 1,82 4,510

(3)

12346 FUSIVEL FACA 100A - 250V FIXO UN 3,000 12056 ELETRODUTO METALICO FLEXIVEL TIPO

CONDUITE D = 1 1/2"

M 1,000

2673 ELETRODUTO PVC ROSCA S/LUVA 15MM - 1/2"

M 12,000

3406 ISOLADOR DE PINO DE PORCELANA VIDRADA 15 KV

UN 4,000

1875 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 1 1/2"

UN 2,000

979 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 16MM2, TP PIRASTIC PIRELL

M 20,000

4481 PECA DE MADEIRA (MASSARANDUBA) 7,5 X 15CM (3 X 6") NAO APARELHADA

M 6,000

7701 TUBO ACO GALV C/ COSTURA DIN 2440/NBR 5580 CLASSE MEDIA DN 2.1/2" (65M

M 1,997

12092 CHAVE FACA TRIPOLAR C/BASE DE ARDOSIA/MARMORE 100A/250V

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 24,001 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 24,020 521,34 492,87 1.014,21 24,96% 253,15 1.267,36 02.00.05 73804/001 M2 342 ARAME GALVANIZADO 12 BWG - 2,60MM - 48,00 G/M KG 0,100

4491 PECA DE MADEIRA 3A/4A QUALIDADE 7,5 X 7,5CM (3X3) NAO APARELHADA

M 0,500

5075 PREGO DE ACO 18 X 30 KG 0,100 6212 TABUA MADEIRA 3A QUALIDADE 2,5 X

30,0CM (1 X 12") NAO APARELHADA

M 0,169

7170 TELA DE NYLON OU PLÁSTICA COM MALHA DE 5 MM, TIPO FACHADEIRA, PARA PROTEÇÃO DE OBRAS

M2 0,498

4435 PECA DE MADEIRA ( PINHO) 1A QUALIDADE 3,75 X 22,5CM NAO APARELHADA

M 0,200

73618 LOCAÇÃO DE ANDAIME METÁLICO TIPO FACHADEIRO

M2 0,500

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,300 1214 CARPINTEIRO DE ESQUADRIA H 0,300 12,27 4,93 17,20 24,96% 4,29 21,49 02.00.06 73686 M2 344 ARAME GALVANIZADO 16 BWG - 1,65MM - 16,60 G/M KG 0,020

5074 PREGO POLIDO COM CABECA 1 1/2" X 13 KG 0,012

6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NAO APARELHADA

M2 0,285

4433 PECA DE MADEIRA DE LEI 1A QUALIDADE 7,5 X 7,5CM NAO APARELHADA

M 0,040

7247 TEODOLITO C/ PRECISAO +/- 6 SEGUNDOS, INCLUSIVE TRIPE (LOCAÇÃO)

H 0,100

7252 NIVEL OTICO C/ PRECISAO +/- 0,7MM TIPO WILD NA-2 OU EQUIV

H 0,100

6115 AJUDANTE H 0,130

244 AUXILIAR DE TOPOGRAFIA H 0,600

7592 TOPÓGRAFO H 0,100

7595 NIVELADOR H 0,100

LOCACAO DA OBRA, COM USO DE EQUIPAMENTOS TOPOGRAFICOS, INCLUSIVE TOPOGRAFO E NIVELADOR 11,900 0,24 8,690 0,10 7,730 2,21 9,790 0,39 7,040 0,92 7,340 1,24 3,950 1,97 11,300 2,26 7,040 2,11 9,390 2,82 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

2,55

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

6,660 0,67 6,39 1,580 18,96 12,540 50,16 5,000 10,00 6,060 121,20 19,490 116,94 53,890 107,60 48,500 48,50 13,490 323,77 6,390 6,330 18,99 7,040 169,10 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PROTECAO DE FACHADA COM TELA DE POLIPROPILENO FIXADA EM ESTRUTURA DE MADEIRA COM ARAME GALVANIZADO INCLUSIVE ANDAIME

10,750 1,08 4,990 2,50 5,09 2,250 0,23 1,300 0,13 20,587 14,450 16,713 8,67 2,06 1,67

(4)

1213 CARPINTEIRO DE FORMA H 0,130 3,30 14,56 17,86 24,96% 4,46 22,32

03.00.00

03.00.01 COMP_ADM1 MÊS

2707 ENGENHEIRO OU ARQUITETO /PLENO - DE OBRA MÊS 165,000 - 14.572,50 14.572,50 24,96% 3.637,30 18.209,80 03.00.02 COMP_ADM2 MÊS

MATCH_ADM2 ENGENHEIRO ELETRICISTA MÊS 165,000

- 14.572,50 14.572,50 24,96% 3.637,30 18.209,80 03.00.03 COMP_ADM3 MÊS 4069 MESTRE DE OBRAS H 220,000 - 5.430,48 5.430,48 24,96% 1.355,45 6.785,93 03.00.04 COMP_ADM4 H 10508 VIGIA H 220,000 - 2.488,20 2.488,20 24,96% 621,05 3.109,25 03.00.05 COMP_ADM5 H

INSUMO_ADM4 TECNICO DE SEGURANÇA MÊS 1,000

- 2.273,42 2.273,42 24,96% 567,45 2.840,87 03.00.06 COMP_ADM6 MÊS 253 ALMOXARIFE MÊS 220,000 - 3.080,00 3.080,00 24,96% 768,77 3.848,77 03.00.07 COMP_ALIM UN

INSUMO_ALIM_1 QUENTINHAS PARA 1 PESSOA X MÊS UN 1,000 10,00 INSUMO_ALIM_2 CAFÉ DA MANHÁ, COPO DE

LEITE+PÃO+CAFÉ UN 1,000 1,35 11,35 - 11,35 24,96% 2,83 14,18 03.00.08 COMP_EPI MÊS

INSUMO_EPI_1 CAPACETE PLASTICO RIGIDO UN 1,000 7,64

INSUMO_EPI_2 BOTA COURO SOLADO DE BORRACHA VULCANIZADA

PAR 2,000 43,36

INSUMO_EPI_3 LUVA COURO C/ SOLADO RASPA CANO CURTO PAR 4,000 23,20 3.080,00 5.430,48 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

BDI (%) MESTRE DE OBRAS 24,684 2.273,420 ENGENHEIRO ELETRICISTA 88,318 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa):

2.273,42

DESPESAS COM ALIMENTAÇÃO

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

DESPESAS COM EPI

7,640 BDI (%)

PREÇO TOTAL (SINAPI)

2.488,20 PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): TECNICO DE SEGURANÇA

ADMINISTRAÇÃO OBRA

ENGENHEIRO CIVIL

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

PREÇO TOTAL UNIT. (c/ taxa):

21,680 ALMOXARIFE 14,000 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 10,000

PREÇO TOTAL (SINAPI)

5,800

9,530 1,24

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

14.572,50 PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

1,350

88,318 14.572,50

PREÇO TOTAL (SINAPI) PREÇO TOTAL UNIT. (c/ taxa): VIGIA

(5)

INSUMO_EPI_4 OCULOS DE PROTEÇÃO TRANSPARENTE UN 1,000 2,96

INSUMO_EPI_5 UNIFORME COMPOSTO DE CALÇA E JALECO UN 2,000 144,00 221,16 - 221,16 24,96% 55,20 276,36 03.00.09 COMP_TRAN MÊS

COMP_TRAN_1 Transporte terrestre Manaus/Presidente Figueiredo/Manaus - ida e volta

UN 22,000 2.816,00 2.816,00 - 2.816,00 24,96% 702,87 3.518,87

04.00.00

04.00.01 COMP_LP MÊS

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 192,000 1.351,68 1.351,68 24,96% 337,38 1.689,06 04.00.02 9537 M2

3 ACIDO MURIATICO (SOLUCAO ACIDA) L 0,046 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 0,140 0,16 0,99 1,15 24,96% 0,29 1,44

05.00.00

05.00.01 COMP158 TxKM

83999 CAMINHÃO TOCO, CARROCERIA FIXA ABERTA DE MADEIRA, MOTOR A DIESEL - CHP - COM MOTORISTA T 0,0045 0,42 - 0,42 24,96% 0,10 0,52

06.00.00

06.00.01 74151/001 M2

6242 PA CARREGADEIRA SOBRE RODAS 180 HP - CAPACIDADE DA CACAMBA. 2,5 A 3,3 M3 - PESO OPERACIONAL 17.428 - CHP DIURNO

CHP 0,0054206

6243 PA CARREGADEIRA SOBRE RODAS 180 HP - CAPACIDADE DA CACAMBA. 2,5 A 3,3 M3 - PESO OPERACIONAL 17.428 - CHI DIURNO

CHI 0,0039252

6250 TRATOR DE ESTEIRAS CATERPILLAR D6 153HP (VU=10AN0S) - CHP DIURNO

CHP 0,0093458

6111 SERVENTE H 0,0186916

PREÇO (MATERIAL) 3,45 ESCAVACAO E CARGA MATERIAL 1A CATEGORIA, UTILIZANDO TRATOR DE

ESTEIRAS DE 110 A 160HP COM LAMINA, PESO OPERACIONAL * 13T E PA CARREGADEIRA COM 170 HP.

205,51 1,92

7,04 0,13 213,52 1,16

94,88 0,37 PREÇO TOTAL (SINAPI)

BDI (%)

0,42

LIMPEZA FINAL

LIMPEZA FINAL DA OBRA

3,560 PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

MOVIMENTO DE TERRA

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 2,960 72,000 BDI (%) PREÇO TOTAL UNIT. (c/ taxa): DESPESAS COM TRANSPORTE DE FUNCIONARIOS

128,000

LIMPEZA PERMANENTE DA OBRA

7,040

0,16

7,040 0,99

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

1.351,68

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%)

PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL UNIT. (c/ taxa):

MOBILIZAÇÃO E DESMOBILIZAÇÃO DE EQUIPAMENTOS COM CAMINHAO POR RODOVIA PAVIMENTADA

93,820

PREÇO TOTAL UNIT. (c/ taxa):

TRANSPORTE

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

(6)

PREÇO (MAO-DE-OBRA) 0,13 PREÇO TOTAL (SINAPI) 3,58 BDI (%) 24,96% 0,89 PREÇO TOTAL UNIT. (c/ taxa): 4,47

06.00.02 72885 M3XKM 5811 CAMINHAO BASCULANTE, 6M3,12T - 162HP (VU=5ANOS) - CHP DIURNO CHI 0,010 1,15 - 1,15 24,96% 0,29 1,44 06.00.03 5719 M3

6079 ARGILA VERMELHA OU ARGILA ARENOSA M3 1,251

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 3,000 7,24 21,12 28,36 24,96% 7,08 35,44 06.00.04 74005/002 M3

1147 CAMINHAO PIPA 6.000L C/ BARRA ESPARGIDORA (INCL

MANUTENCAO/OPERACAO)

H 0,010

7642 TRATOR DE PNEUS ATE 75HP (INCL MANUT/OPERACAO) H 0,010 10798 GRADE DE DISCO 20 X 24" H 0,011 4091 MOTONIVELADORA 140 A 155HP (INCL MANUT/OPERACAO) H 0,005

6059 ROLO COMPACTADOR VIBRATORIO LISO AUTOPROPELIDO 83HP, FORCA IMPACTO 11T

H 0,005

6060 ROLO COMPACTADOR VIBRATORIO PE DE CARNEIRO AUTOPROPELIDO 83HP, FORCA I

H 0,010

6111 SERVENTE OU OPERARIO NAO QUALIFICADO

H 0,030

PREÇO (MATERIAL) 2,68 PREÇO (MAO-DE-OBRA) 0,21 PREÇO TOTAL (SINAPI) 2,89 BDI (%) 24,96% 0,72 PREÇO TOTAL UNIT. (c/ taxa): 3,61

07.00.00

07.00.01 COMP3 M

Metro linear de Estaca Raiz executada em solo, Ø de 20 cm, exclusive materiais

M 1,000

IFAMARG20MPA ARGAMASSA 20MPA, VIRADO EM BETONEIRA, NA OBRA, SEM LANÇAMENTO

M3 0,0314

37623 OPERADOR DE BETONEIRA H 6,0100

370 AREIA MÉDIA M3 0,9600

1379 CIMENTO PORTLAND COMPOSTO CP II-32 KG 600,0000

87445 BETONEIRA CAPACIDADE NOMINAL 400L, CAPACIDADE DE MISTURA 310L, MOTOR A DIESEL POTÊNCIA 5HP, SEM CARREGADOR - CHP DIURNO. AF_06/2014

CHP 1,4000

87446 BETONEIRA CAPACIDADE NOMINAL 400L, CAPACIDADE DE MISTURA 310L, MOTOR A DIESEL POTÊNCIA 5HP, SEM CARREGADOR - CHI DIURNO. AF_06/2014

CHI 4,6100

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,500 4750 PEDREIRO H 0,200 79,43 65,00 0,41 13,97 0,15 0,55 0,35 117,00 69,39 70,17 7,04 PREÇO TOTAL (SINAPI)

BDI (%)

0,52

40,50 PREÇO TOTAL UNIT. (c/ taxa):

12,81 2,800 0,12 0,520 0,08 7,24 3,52 1,91 7,040

ESTACA RAIZ Φ 20CM S/ ARMADURA

INFRA-ESTRUTURA

REATERRO APILOADO EM CAMADAS 0,20M C/ MATERIAL ARGILO-ARENOSO 5,790 7,040 21,12 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,70 52,20 PREÇO (MATERIAL) 9,530 65,000 COMPACTACAO MECANICA C/ CONTROLE DO GC>=95% DO PN (AREAS) (C/MONIVELADORA 140 HP E ROLO COMPRESSOR VIBRATORIO 80 HP)

TRANSPORTE LOCAL COM CAMINHAO BASCULANTE 6 M3, RODOVIA EM LEITO NATURAL (10 KM)

0,21

114,60 1,15

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

1,42 0,680

7,740 1,46

(7)

6,89 86,32 24,96% 21,55 107,87

07.00.02 79478 M3

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 2,931 - 20,63 20,63 24,96% 5,15 25,78 07.00.03 5719 M3

6079 ARGILA VERMELHA OU ARGILA ARENOSA M3 1,251

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 3,000 7,24 21,12 28,36 24,96% 7,08 35,44 07.00.04 5651 M2

4491 PECA DE MADEIRA 3A/4A QUALIDADE 7,5 X 7,5CM (3X3) NAO APARELHADA

M 0,275

5061 PREGO POLIDO COM CABECA 18 X 27 KG 0,150 2692 DESMOLDANTE PARA FORMA DE

MADEIRA

L 0,100

4502 PECA DE MADEIRA 2A QUALIDADE 2,5 X 5CM NAO APARELHADA

M 0,240

6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NAO APARELHADA M 0,792 6117 AJUDANTE DE CARPINTEIRO H 0,225 1213 CARPINTEIRO DE FORMAS H 0,900 8,19 8,82 17,01 24,96% 4,25 21,26 07.00.05 73942/002 KG 39 ACO CA-60 - 5,0MM KG 1,096 337 ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M KG 0,020 378 ARMADOR H 0,100

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 4,76 1,65 6,41 24,96% 1,60 8,01 07.00.06 74254/002 KG 34 ACO CA-50 3/8" (9,52 MM) KG 1,098 337 ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M KG 0,036 378 ARMADOR H 0,100

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 4,96 1,65 6,61 24,96% 1,65 8,26 07.00.09 74164/004 KG 4720 PEDRA BRITADA N. 0 M3 0,417 4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,600

FORMA TABUA PARA CONCRETO EM FUNDACAO C/ REAPROVEITAMENTO 5X 4,990

PREÇO TOTAL (SINAPI) BDI (%)

1,25

7,160 0,95

8,890 0,82

1,760 PREÇO TOTAL UNIT. (c/ taxa):

BDI (%) PREÇO TOTAL (SINAPI) PREÇO (MAO-DE-OBRA)

PREÇO (MAO-DE-OBRA)

REATERRO APILOADO EM CAMADAS 0,20M C/ MATERIAL ARGILO-ARENOSO

20,63

7,24 PREÇO TOTAL (SINAPI)

5,790 PREÇO TOTAL UNIT. (c/ taxa):

BDI (%)

PREÇO (MATERIAL)

7,040 ESCAVAÇÃO MANUAL CAMPO ABERTO EM SOLO EXCETO ROCHA ATE 2,00M DE PROFUNDIDADE 102,890 42,90 103,540 0,31 21,12 4,65 0,95 7,040 0,70 7,730 4,79 8,500 0,95 62,11 7,150 1,47 9,530 7,35 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL UNIT. (c/ taxa):

8,500

9,530

ARMACAO ACO CA-50 DIAM. 6,3MM(1/4) A 12,5MM(1/2)-FONECIMENTO/CORTE(PERDA 10%) DOBRA/COLOCACAO

4,240 PREÇO TOTAL (SINAPI)

LASTRO DE BRITA 1 e 0

0,38

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

0,17 4,59

PREÇO (MAO-DE-OBRA) BDI (%) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO TOTAL UNIT. (c/ taxa):

7,040 0,70 7,040 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0MM.- FORNECIMENTO / CORTE (C/PERDA DE 10%) / DOBRA / COLOCAÇÃO

4,190

9,530

(8)

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 2,000 105,01 14,08 119,09 24,96% 29,72 148,81 07.00.10 73972/002 M3 370 AREIA MEDIA M3 0,890 1379 CIMENTO PORTLAND CP-320 KG 319,495 10533 BETONEIRA 580L ELETRICA TRIFASICA

7,5HP C/ CARREGADOR MECANICO

H 1,830

4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,830 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 3,238 4230 OPERADOR DE MAQUINAS E EQUIPAMENTOS H 1,830 358,82 51,12 409,94 24,96% 102,32 512,26 07.00.11 74157/004 M3

10485 VIBRADOR DE IMERSAO C/ MOTOR ELETRICO 2HP MONOFASICO QUALQUER DIAM C/ MANGOTE

H 0,314

4750 PEDREIRO H 1,999

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 5,000 0,60 54,25 54,85 24,96% 13,69 68,54

08.00.00

08.00.01 79478 M3

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 2,931 - 20,63 20,63 24,96% 5,15 25,78 08.00.02 5719 M3

206079 ARGILA, ARGILA VERMELHA OU ARGILA ARENOSA

M3 1,251

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 3,000 7,24 21,12 28,36 24,96% 7,08 35,44 08.00.03 COMP740 M2

7332 AGENTE DE DESFORMA P/ CONCRETO TP DESMOL OTTO BAUMGART OU EQUIV

L 0,100

6212 TABUA MADEIRA 3A QUALIDADE 2,5 X 30,0CM (1 X 12") NAO APARELHADA

M 1,600

205061 PREGO DE ACO 18 X 27 KG 0,240 4509 PECA DE MADEIRA 3A QUALIDADE 2,5 X

10CM NAO APARELHADA

M 1,740

4491 PECA DE MADEIRA 3A/4A QUALIDADE 7,5 X 7,5CM (3X3) NAO APARELHADA

M 2,000

1357 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1M (12MM) P/ FORMA CONCRETO UN 0,185 11,74 1,72 4,47 9,98 PREÇO TOTAL (SINAPI)

0,80

11,72 7,970

7,340 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa): REATERRO APILOADO EM CAMADAS 0,20M C/ MATERIAL ARGILO-ARENOSO

PREÇO TOTAL (SINAPI)

41,89

20,63 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI)

19,05 7,040

PREÇO TOTAL (SINAPI)

7,24 21,12

SUPERESTRUTURA

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,60 CONCRETO ESTRUTURAL FCK=20MPA, VIRADO EM BETONEIRA, NA OBRA, SEM

LANÇAMENTO 15,480 28,33 9,530 7,500 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 13,73 BDI (%) 7,040 14,08 PREÇO (MATERIAL) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,680

FORMA MADEIRA COMP RESINADA 12MM P/ESTRUTURA REAPROV 3 VEZES

4,990

63,360 47,070

LANCAMENTO MANUAL DE CONCRETO EM FUNDAÇÃO

1,910

ESCAVAÇÃO MANUAL CAMPO ABERTO EM SOLO EXCETO ROCHA ATE 2,00M DE PROFUNDIDADE

PREÇO TOTAL UNIT. (c/ taxa):

7,160 2,570 22,79 217,26 BDI (%) 5,790 7,040 BDI (%) PREÇO (MATERIAL) 35,20 PREÇO TOTAL UNIT. (c/ taxa):

PREÇO TOTAL UNIT. (c/ taxa):

103,540 85,94

7,040 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

(9)

1213 CARPINTEIRO DE FORMA H 1,350 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 1,350 40,43 22,37 62,80 24,96% 15,67 78,47 08.00.04 73942/002 KG 39 ACO CA-60 - 5,0MM KG 1,096 337 ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M KG 0,020 378 ARMADOR H 0,100

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 4,76 1,65 6,41 24,96% 1,60 8,01 08.00.06 74254/002 KG 34 ACO CA-50 3/8" (9,52 MM) KG 1,098 337 ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M KG 0,036 378 ARMADOR H 0,100

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 4,96 1,65 6,61 24,96% 1,65 8,26 08.00.10 74254/001 KG 337 ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M KG 0,035 30 ACO CA-50 3/4" (19,05 MM) KG 1,095 378 ARMADOR H 0,070

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,070 4,62 1,16 5,78 24,96% 1,44 7,22 08.00.13 73972/001 M3 370 AREIA MEDIA M3 0,867 1379 CIMENTO PORTLAND CP-320 KG 349,000 4718 PEDRA BRITADA N. 2 OU 25 MM M3 0,209 4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,622 10533 BETONEIRA 580L ELETRICA TRIFASICA

7,5HP C/ CARREGADOR MECANICO

H 1,851

6111 SERVENTE OU OPERARIO NAO QUALIFICADO

H 3,130

4243 OPERADOR DE BETONEIRA ( CAMINHÃO) H 1,820

377,35 48,74 426,09 24,96% 106,35 532,44 08.00.14 74157/003 M3

10485 VIBRADOR DE IMERSAO C/ MOTOR ELETRICO 2HP MONOFASICO QUALQUER DIAM C/ MANGOTE H 0,309 4750 PEDREIRO H 5,001 103,540 PREÇO (MATERIAL) 7,040 22,04 14,670 26,70 47,66 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): LANCAMENTO MANUAL DE CONCRETO EM ESTRUTURAS, INCL. VIBRACAO

1,910 0,59 9,530 100,000 20,90 8,500 3,950 4,32 9,530 0,67 7,040 PREÇO (MATERIAL) 4,65 7,040 0,70

PREÇO TOTAL UNIT. (c/ taxa):

0,49

64,44

7,500 13,89

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

CONCRETO ESTRUTURAL FCK=25MPA, VIRADO EM BETONEIRA, NA OBRA, SEM LANÇAMENTO

47,070 40,80

0,680 237,32

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

7,040 0,70

4,190

9,530 0,95

4,59 PREÇO TOTAL (SINAPI)

12,87 9,50 BDI (%) 9,530 7,040 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

ARMACAO AÇO CA-50 DIAM. 16.00(5/8) A 25,00MM (1) - FORNECIMENTO / CORTE (PERDA DE 10%) DOBRA/COLOCACAO

8,500 0,30

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

9,530 0,95

0,17

4,240 PREÇO TOTAL UNIT. (c/ taxa):

ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0MM.- FORNECIMENTO / CORTE (C/PERDA DE 10%) / DOBRA / COLOCAÇÃO

ARMACAO ACO CA-50 DIAM. 6,3MM(1/4) A 12,5MM(1/2)-FONECIMENTO/CORTE(PERDA 10%) DOBRA/COLOCACAO

BDI (%)

0,31 8,500

(10)

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 8,000 0,59 103,98 104,57 24,96% 26,10 130,67

09.00.00

09.00.01 73970/001 KG

204774 PERFIL ACO ESTRUTURAL "I" - 12" X 5 1/4" (QUALQUER ESPESSURA)

KG 1,047

6391 SOLDA TOPO DESCENDENTE CHANFRADA ESPESSURA=1/4" CHAPA/PERFIL/TUBO ACO M 0,006 6115 AJUDANTE H 0,120 6110 SERRALHEIRO H 0,120 8,14 1,92 10,06 24,96% 2,51 12,57 09.00.02 COMP6 M2

1610 MASSA PRONTA P/ VEDACAO TP CARBOLASTICO CINZA DA OTTO BAUMGART

KG 0,004

4381 PARAFUSO ROSCA SOBERBA ACO ZINC CABECA CHATA FENDA SIMPLES 8 X 100MM

UN 1,300

7243_1 TELHA GALVALUME 0,50 ONDULADA M2 1,060

12869 TELHADISTA H 0,220 6117 AJUDANTE DE CARPINTEIRO H 0,220 24,82 3,38 28,20 24,96% 7,04 35,24 09.00.03 72107 M

1116 RUFO CHAPA GALVANIZADA NUM 24 L = 25CM M 1,000 205061 PREGO DE ACO 18 X 27 KG 0,136 4750 PEDREIRO H 0,280 6115 AJUDANTE H 0,280 14,98 4,64 19,62 24,96% 4,90 24,52 09.00.04 72105 M 5061 PREGO DE ACO 18 X 27 KG 0,160 5104 REBITE DE ALUMINIO VAZADO DE

REPUXO, 3,2 X 8MM - (1KG=1025UNID)

KG 0,040

13388 SOLDA 50/50 KG 0,076

1118 CALHA CHAPA GALVANIZADA NUM 24 L = 50CM

M 1,000

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,600 4750 PEDREIRO H 0,600 26,88 9,94 36,82 24,96% 9,19 46,01 09.00.05 COMP106 M2

4381 PARAFUSO ROSCA SOBERBA ACO ZINC CABECA CHATA FENDA SIMPLES 8 X 100MM

UN 1,300

56,32

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

7,040

44,870 3,39

20,840 20,84

7,040 4,22

9,530 5,72

COBERTURA COM ONDULADA TRANSLUCIDA

0,690 0,90 0,90 PREÇO (MAO-DE-OBRA) 22,500 23,85 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

8,230 1,81 7,150 1,57 PREÇO (MATERIAL) 1,50 2,67 7,040

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): CALHA EM CHAPA DE ACO GALVANIZADO N.24, DESENVOLVIMENTO 50CM

7,160

1,97 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa): RUFO EM CHAPA DE ACO GALVANIZADO N.24, DESENVOLVIMENTO 25CM

14,010 14,01 7,160 1,15 37,960 7,040 0,84 9,000 1,08 0,97 9,530 PREÇO (MATERIAL) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) PREÇO TOTAL UNIT. (c/ taxa):

COBERTURA COM TELHA GALVALUME 0,50, PERFIL ONDULADO, INCLUSO ACESSORIOS

16,500 0,07

0,690

COBERTURA

ESTRUTURA METALICA PERFIS "I" 8 A 12" EM ACO LAMINADO(VIGA ISOLADA )

7,310 7,66

(11)

7243_1 TELHA NATURAL TRANSLUCIDA 244X110CM M2 1,060 12869 TELHADISTA H 0,220 6117 AJUDANTE DE CARPINTEIRO H 0,220 13,61 3,38 16,99 24,96% 4,24 21,23

10.00.00

10.00.01 6051 M2

10532 BETONEIRA 320L ELETRICA TRIFASICA 3HP S/ CARREGADOR MECANICO

H 0,018

1379 CIMENTO PORTLAND CP-320 KG 6,106 1106 CAL HIDRATADA, DE 1A. QUALIDADE,

PARA ARGAMASSA

KG 1,800

370 AREIA MEDIA M3 0,030

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,200 4750 PEDREIRO H 0,250 7,67 3,79 11,46 24,96% 2,86 14,32 10.00.02 73968/001 M2

4791 COLA CONTATO P/ CHAPA VINILICA/BORRACHA

KG 0,250

4014 MANTA IMPERMEABILIZANTE A BASE DE ASFALTO MODIFICADO C/ POLIMEROS DE A

M2 1,000

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,450 34,93 3,17 38,10 24,96% 9,51 47,61 10.00.03 73635 M2 1379 CIMENTO PORTLAND CP-320 KG 9,696 370 AREIA MEDIA M3 0,025

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,372 4750 PEDREIRO H 0,220 7,76 4,72 12,48 24,96% 3,12 15,60 10.00.04 73929/004 M2

1372 EMULSAO ADESIVA A BASE DE ACRILICO TP KZ HEYDI OU EQUIV

KG 0,300

1371 CIMENTO CRISTALIZANTE TP K11 HEY'DI VIAPOL (SEM EMULSAO ADESIVA)

KG 2,994 12873 IMPERMEABILIZADOR H 2,000 8,51 18,72 27,23 24,96% 6,80 34,03 10.00.05 68053 M2

3777 LONA PLASTICA PRETA, ESPESSURA 150 MICRAS M2 1,078 12873 IMPERMEABILIZADOR H 0,200 9,360 18,72 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,680 4,15

LONA PLASTICA PRETA, ESPESSURA 150 MICRAS - FORNECIMENTO E COLOCAÇÃO

0,500 0,54 9,360 1,87 47,070 1,41 7,040 1,41 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 11,990 12,71 8,230 1,81 7,150 1,57 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

IMPERMEABILIZAÇÃO

REGULARIZACAO BASE(CONTRA-PISO)P/REVESTIMENTO CERAMICO C/ARG CIMENTO/ 2,250 0,04 1,150 2,07 29,580 29,58 7,040 3,17 BDI (%) PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PROTECAO MECANICA COM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), ESPESSURA 2 CM 0,680 6,59 47,070 1,17 7,040 2,62 9,530 2,10 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

IMPERMEABILIZACAO COM CIMENTO CRISTALIZANTE COM EMULSAO ADESIVA PARA ESTRUTURA ENTERRADA, PROFUNDIDADE ATE 7M

10,400 3,12

1,800 5,39

BDI (%) PREÇO TOTAL UNIT. (c/ taxa): COLOCACAO MANTA IMPERMEABILIZANTE

21,380 5,35

9,530 2,38

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

(12)

0,54 1,87 2,41 24,96% 0,60 3,01

11.00.00

11.00.01 73935/001 M2

7271 TIJOLO CERAMICO FURADO 8 FUROS 10 X 20 X 20CM

UN 23,980

73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL

M3 0,010

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,000 4750 PEDREIRO H 1,000 17,60 16,57 34,17 24,96% 8,53 42,70 11.00.02 73937/003 M2 1379 CIMENTO PORTLAND CP-320 KG 2,332 665 ELEMENTO VAZADO CONCRETO 50 X 50

X 7CM

UN 4,000

370 AREIA MEDIA M3 0,005

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,895 4750 PEDREIRO H 0,850 75,39 14,40 89,79 24,96% 22,41 112,20 11.00.03 73862/003 M2

2417 DIVISORIA CEGA (N1) - PAINEL MSO/COMEIA E=35MM -

MONTANTE/RODAPE DUPLO ALUMINIO ANOD NAT COLOCADA

M2 1,000 119,44 - 119,44 24,96% 29,81 149,25 11.00.04 79627 M2 367 AREIA GROSSA M3 0,004

25976 DIVISORIA EM GRANITO BRANCO ESP=3CM COM DUAS FACES POLIDAS LEVIGADO

M2 1,050

1380 CIMENTO BRANCO KG 0,726

1379 CIMENTO PORTLAND COMUM CP I- 32 KG 1,000 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 3,000 4750 PEDREIRO H 2,000 493,03 40,18 533,21 24,96% 133,09 666,30

12.00.00

12.00.01 5974 M2 1379 CIMENTO PORTLAND CP-320 KG 1,800 367 AREIA GROSSA M3 0,007 0,680 1,22 54,000 0,36 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

REVESTIMENTO DE PAREDES INTERNAS/ EXTERNAS

CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, PREPARO MECANICO

PREÇO TOTAL (SINAPI)

PAREDES E PAINEIS

0,680 0,68 7,040 18,390 47,070 0,24 7,040 6,30 9,530 8,10 PREÇO (MATERIAL) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

DIVISORIA EM GRANITO POLIDO, ESP=3CM,ASSENTADO COM ARGAMASSA TRAÇO 1:4, ARREMATE EM CIMENTO BRANCO

54,000 0,22

465,920 PREÇO TOTAL UNIT. (c/ taxa):

DIVISORIA 35MM PAINEL CEGO MIOLO COLMEIA REVESTIDA C/CHAPA LAMINADA EM CORES FIBRA MADEIRA PRENSADA C/MONTANTES ALUMINIO ANODIZADO NATURAL EM "L" "T" OU "X" INCL PORTAS EXCL SUAS FERRAGENS.

119,440 119,44 489,22 4,000 2,91 21,12 9,530 19,06 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL UNIT. (c/ taxa): BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

73,56

9,530 9,53

BDI (%)

BDI (%) PREÇO (MAO-DE-OBRA)

ALVENARIA 1/2 VEZ DE TIJOLO CERAMICO FURADO 10X20X20CM, ASSENTADO COM ARGAMASSA 1:4 CIMENTO E AREIA ESP 1CM

0,580 13,91

380,280 3,69

7,040 7,04

PREÇO (MATERIAL)

PREÇO TOTAL (SINAPI)

COBOGO DE CONCRETO (ELEMENTO VAZADO), 7X50X50CM, ASSENTADO COM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA)

0,680 1,59

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

(13)

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,130 4750 PEDREIRO H 0,100 1,58 1,87 3,45 24,96% 0,86 4,31 12.00.02 5990 M2

10532 BETONEIRA 320L ELETRICA TRIFASICA 3HP S/ CARREGADOR MECANICO

H 0,014

1379 CIMENTO PORTLAND CP-320 KG 2,660 1106 CAL HIDRATADA, DE 1A. QUALIDADE,

PARA ARGAMASSA

KG 4,340

370 AREIA MEDIA M3 0,024

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,720 4750 PEDREIRO H 0,600 7,97 10,79 18,76 24,96% 4,68 23,44 12.00.03 5984 M2

6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO

M3 0,051

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,798 4750 PEDREIRO H 0,800 20,58 13,24 33,82 24,96% 8,44 42,26 12.00.04 COMP100 M2

371 ARGAMASSA PRONTA PARA REVESTIMENTO EXTERNO OU INTERNO

KG 4,500

1380 CIMENTO BRANCO KG 0,440

21108 PISO PORCELANATO POLIDO EXTRA 30X30CM OU 40X40CM

M2 1,050

4760 AZULEJISTA OU LADRILHISTA H 0,639 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 1,044 105,69 12,88 118,57 24,96% 29,60 148,17 12.00.05 74126/002 M

11794 GRANITO AMENDOA POLIDO PARA BANCADA ESP = 2 CM M2 0,600 73541 COLOCACAO BANCA MARMORE/GRANITO/ACO INOX EXCLUSIVE BANCA M 1,000 242,76 - 242,76 24,96% 60,59 303,35 12.00.06 COMP82 M2 370 AREIA MEDIA M3 0,002

1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA

KG 0,130

1379 CIMENTO PORTLAND CP-320 KG 0,700

1380 CIMENTO BRANCO KG 0,019

10803 GRANITO AMENDOA POLIDO ESP = 2 CM M2 1,000 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI)

0,48 4,000 0,08 PREÇO (MATERIAL) 5,62 9,530 7,62 PREÇO (MATERIAL)

BANCA GRANITO AMENDOA L=60CM E=3CM EM PAREDE, S/APOIO

318,700 191,22

PREÇO TOTAL UNIT. (c/ taxa):

PEITORIL DE GRANITO NATURAL ASSENTADO ARGAMASSA CIMENTO E AREIA

47,070 0,09

1,150

240,020 240,02 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa):

EMBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA), ESPESSURA 2,0CM, PREPARO MECANICO

406,460 20,58 7,040 4,000 51,540 51,54 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO (MAO-DE-OBRA)

7,35

PREÇO TOTAL (SINAPI) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

7,040 0,92

9,530 0,95

PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA)

PORCELANATO POLIDO 30 X 30 CM, ASSENTADO COM ARGAMASSA PRÉ-FABRICADA DE CIMENTO COLANTE

BDI (%) PREÇO TOTAL (SINAPI) BDI (%)

PREÇO TOTAL UNIT. (c/ taxa):

EMBOCO ASPERO C/ARG 1:2:11 CIMENTO/CAL HIDRATADA/AREIA MEDIA S/PENEIR

0,640 PREÇO (MATERIAL) 0,15 0,680 5,53 7,040 96,240 101,05 8,660 2,250 0,03 0,680 1,81 1,150 4,99 47,070 1,14 7,040 5,07 9,530 5,72 2,88 1,76

(14)

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,040 4750 PEDREIRO H 0,040 240,82 0,66 241,48 24,96% 60,27 301,75 12.00.07 COMP103 M2

PLACA DE ALUCOBOND CINZA PRATA M2 1,000

MONTADOR H 9,000 61,92 182,25 244,17 24,96% 60,94 305,11

13.00.00

13.00.01 5975 M2 1379 CIMENTO PORTLAND CP-320 KG 2,365 370 AREIA MEDIA M3 0,007

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,334 4750 PEDREIRO H 0,200 1,95 4,26 6,21 24,96% 1,55 7,76 13.00.02 5976 M2

6025 ARGAMASSA TRACO 1:4,5 (CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MANUAL

M3 0,015

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,699 4750 PEDREIRO H 0,700 3,90 11,59 15,49 24,96% 3,87 19,36 13.00.03 COMP_FORRO M2

11587 FORRO PVC EM PLACAS LARG=10CM E=8MM COMP=6M LISO (INCL COLOCACAO)

M2 1,000

COMP110 GANCHO LONGO GALVANIZADO PARA FIXAÇÃO NA LAJE.

UN 2,000

5104 REBITE DE ALUMINIO VAZADO DE REPUXO, 3,2 X 8MM - (1KG=1025UNID)

KG 0,040

10952 CANTONEIRA ACO ABAS IGUAIS (QUALQUER BITOLA) E = 1/8"

KG 3,000

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,500 6110 SERRALHEIRO H 0,500 49,97 8,02 57,99 24,96% 14,47 72,46

14.00.00

14.00.01 73907/003 M2

73936_5 CONCRETO 1:3:5 ( 7 MPA), C/ BRITA 1 E 2, C/BETONEIRA

M3 0,054

6111 SERVENTE OU OPERARIO NAO QUALIFICADO

H 0,050

331,810 PREÇO TOTAL (SINAPI)

PREÇO (MAO-DE-OBRA)

4,50 PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA)

EMBOCO EM TETOS TRACO 1:4 (CAL E AREIA MEDIA), ESPESSURA 1,5CM, PREPARO MANUAL

7,040 0,28

9,530

0,35 PREÇO TOTAL (SINAPI)

BDI (%)

7,040 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa):

20,250 182,25 BDI (%) 1,61 47,070 0,34 9,530 6,67 PREÇO (MATERIAL) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 5,460 9,000 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI)

3,90

7,040 PREÇO (MATERIAL)

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PISOS

CONTRAPISO/LASTRO CONCRETO 1:3:6 S/BETONEIRA E=5CM

17,85 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL UNIT. (c/ taxa):

FORRO PVC EM PLACAS COM LARGURA DE 10CM, ESPESSURA 8MM,COMP DE 6,0M,LISO, INCLUSIVE COLOCAÇÃO, ESTRUTURA DE SUPORTE

13,770 13,77

9,150

37,960

PREÇO TOTAL (SINAPI) PLACA DE ALUMINIO COMPOSTO

61,920 18,30 1,52 16,38 0,38 PREÇO (MATERIAL) 260,060 4,92 61,92 7,040 3,52 7,040 2,35 9,530

PREÇO TOTAL UNIT. (c/ taxa):

1,91

FORROS

CHAPISCO/TETOS C/ARGAMASSA CIMENTO/AREIA 1:3 E=0,5CM

0,680 PREÇO TOTAL (SINAPI)

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

(15)

4750 PEDREIRO H 0,700 17,85 7,02 24,87 24,96% 6,21 31,08 14.00.02 6051 M2

10532 BETONEIRA 320L ELETRICA TRIFASICA 3HP S/ CARREGADOR MECANICO

H 0,040

1379 CIMENTO PORTLAND CP-320 KG 5,500 1106 CAL HIDRATADA, DE 1A. QUALIDADE,

PARA ARGAMASSA

KG 1,920

370 AREIA MEDIA M3 0,030

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,250 4750 PEDREIRO H 0,250 7,45 4,14 11,59 24,96% 2,89 14,48 14.00.03 73829/001 M2 370 AREIA MEDIA KG 0,030

1292 CERAMICA ESMALTADA EXTRA OU 1A QUALIDADE P/ PISO PEI-5 - LINHA PADRAO MEDIO

M2 1,054

1379 CIMENTO PORTLAND CP-320 KG 11,800

1380 CIMENTO BRANCO KG 0,380

4760 AZULEJISTA OU LADRILHISTA H 0,480 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 0,500 34,75 7,68 42,43 24,96% 10,59 53,02 14.00.04 84191 M2

234 AGREGADO DE ALTA RESISTENCIA P/ PISO INDUSTRIAL

KG 16,030

10764 MAQUINA ELETRICA P/ POLIMENTO DE PISO

H 0,500

3671 JUNTA DILATACAO PLASTICA P/ PISO H=20MM E=3,0MM M 0,500 1380 CIMENTO BRANCO KG 5,142 6115 AJUDANTE H 2,000 4755 MARMORISTA/GRANITEIRO H 2,000 29,90 32,02 61,92 24,96% 15,46 77,38 14.00.05 COMP90 M2

73972_2 CONCRETO ESTRUTURAL FCK=20MPA, VIRADO EM BETONEIRA, NA OBRA, SEM LANÇAMENTO

M3 0,102

142 SELANTE ELÁSTICO MONOCOMPONENTE À BASE DE POLIURETANO SIKAFLEX 1A PLUS OU EQUIVALENTE

310ML 0,108

10764 MAQUINA ELETRICA P/ POLIMENTO DE PISO

H 1,143

4035 MAQUINA DE CORTAR

ASFALTO/CONCRETO A GASOLINA POT * 10HP * C/ DISCO * ATE 20" * TIPO CLIPPER

H 0,714

9,530 2,38

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

PREÇO (MAO-DE-OBRA) PREÇO TOTAL UNIT. (c/ taxa):

0,410

3,940 PREÇO TOTAL (SINAPI)

BDI (%)

9,530

PREÇO TOTAL UNIT. (c/ taxa):

REGULARIZACAO DE PISO/BASE EM ARGAMASSA TRAÇO 1;0,5;8(CIMENTO, CAL E AREIA), ESPESSURA 2,5 CM, PREP MECANICO

2,250 0,09 0,680 1,97 1,580 0,79 47,070 1,41 7,040 1,76 4,000 22,580 3,52 PREÇO (MATERIAL) 6,57 14,08 8,970 PREÇO (MAO-DE-OBRA) 43,94 4,500 3,940 6,67 20,57 7,040 17,94 PREÇO (MATERIAL) 23,80 3,74 1,52 8,660 4,16 7,040 4,000 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%)

PISO EM GRANILITE ESP=8mm, INCLUSO JUNTAS DE DILATAÇÃO PLASTICA PREÇO TOTAL UNIT. (c/ taxa):

PISO EM CONCRETO PARA QUADRAS POLIESPORTIVAS, CONCRETO PREPARO MECANICO 20MPA, ESPESSURA 10CM, INCLUSO POLIMENTO E JUNTAS EM POLIURETANO 2X2M C/ ARMAÇÃO EM TELA SOLDADA

430,740 PREÇO TOTAL (SINAPI)

4,50

0,680 8,02

47,250 5,13

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

1,41 PREÇO (MATERIAL)

1,150 2,21

PISO EM CERAMICA ESMALTADA 1A PEI-V, PADRAO MEDIO, ASSENTADA COM ARGAMASSA DE CIMENTO E AREIA PREPARO MANUAL, REJUNTE C/ CIMENTO BRANCO

47,070

(16)

21141 TELA ACO SOLDADA NERVURADA CA - 60, Q-92 (1,48 KG/M2), DIÂMETRO DO FIO = 4,2 MM, LARGURA =2,45 X 60METROS DE COMPRIMENTO, ESPAÇAMENTO DA MALHA = 15X15CM CMS M2 1,100

10487 VIBRADOR DE IMERSAO C/ MOTOR ELETRICO TRIFASICO ACIMA DE 2HP QUALQUER DIAM C/ MANGOTE

H 0,016

378 ARMADOR H 0,020

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,940 4750 PEDREIRO H 0,610 66,25 19,66 85,91 24,96% 21,44 107,35 14.00.06 68333 M2 370 AREIA MEDIA M3 0,100 1379 CIMENTO PORTLAND CP-320 KG 17,553 2691 EMULSAO ASFALTICA, TIPO NEOSIN A

BASE DE AGUA P/ IMPERM

L 0,312

4403 PECA DE MADEIRA 1A QUALIDADE 1 X 5CM NAO APARELHADA

M 2,200

4720 PEDRA BRITADA N. 0 PEDRISCO OU CASCALHINHO POSTO PEDREIRA (SEM FRETE)

M3 0,020

4721 PEDRA BRITADA N. 1 OU 19 MM POSTO PEDREIRA (SEM FRETE)

M3 0,044

10533 BETONEIRA 580L ELETRICA TRIFASICA 7,5HP C/ CARREGADOR MECANICO

H 0,170

1213 CARPINTEIRO DE FORMAS H 0,068 4243 OPERADOR DE BETONEIRA ( CAMINHÃO) H 0,190

4750 PEDREIRO H 0,400

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,950 28,32 13,75 42,07 24,96% 10,50 52,57 14.00.07 6123 M 1379 CIMENTO PORTLAND CP-320 KG 0,102 1106 CAL HIDRATADA, DE 1A. QUALIDADE,

PARA ARGAMASSA

KG 0,100

370 AREIA MEDIA M3 0,001

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,407 4750 PEDREIRO H 0,250 0,26 5,25 5,51 24,96% 1,38 6,89 14.00.08 COMP91 M 20232 SOLEIRA GRANITO 15 X 3CM M 1,000 1381 ARGAMASSA OU CIMENTO COLANTE EM

PO PARA FIXACAO DE PECAS CERAMICAS

KG 0,325

4750 PEDREIRO H 0,150

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 95,71 2,13 97,84 24,96% 24,42 122,26 2,06 103,540 4,56 0,930 SOLEIRA GRANITO 15 X 3CM 2,05

PREÇO TOTAL UNIT. (c/ taxa):

1,150 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO (MATERIAL)

0,12

47,070 0,07

0,530 PREÇO TOTAL (SINAPI)

BDI (%)

95,54

9,530 1,43

7,040 0,70

0,17

PREÇO TOTAL UNIT. (c/ taxa):

7,040

95,540

PREÇO TOTAL (SINAPI) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL) 5,500 1,72 3,81 7,040 BDI (%) 2,60 0,680 0,07 102,890

RODAPE C/ARGAMASSA 1:0,5:5 CIM/CAL/AREIA - 8CM

5,81 PREÇO (MATERIAL) 6,69 13,66 9,530 1,690 0,03 9,530 0,19 9,530 PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI)

7,500 1,28

9,530 0,65

13,710 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa):

11,94 PISO EM CONCRETO DESEMPENADO PARA QUADRAS POLIESPORTIVAS PREPARO

MECANICO, ESPESSURA 7CM, INCLUSO JUNTAS DE DILATACAO E LASTRO IMPERMEABILIZ 47,070 4,71 0,680 9,44 7,040 2,87 9,530 2,38 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 8,580

(17)

14.00.09 73892/002 M2

1379 CIMENTO PORTLAND COMPOSTO CP II- 32

KG 16,0300

370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE)

M3 0,0435

4721 PEDRA BRITADA N. 1 OU 19 MM - POSTO PEDREIRA / FORNECEDOR (SEM FRETE)

M3 0,0285

4718 PEDRA BRITADA N. 2 OU 25 MM - POSTO PEDREIRA / FORNECEDOR (SEM FRETE)

M3 0,0285

10531 BETONEIRA 320L ELETRICA TRIFASICA 3HP C/ CARREGADOR MECANICO

H 0,0500

4505 PECA DE MADEIRA 3A/4A QUALIDADE 1 X 7CM NAO APARELHADA

M 2,0000

4750 PEDREIRO H 0,2000

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,7600 22,95 7,26 30,21 24,96% 7,54 37,75 14.00.10 73789/002 M

87316 ARGAMASSA TRAÇO 1:4 (CIMENTO E AREIA) PARA CHAPISCO CONVENCIOANL PREPARO MECÂNICO COM BETONEIRA 400L. AF_06/2014

M3 0,0025

1523 CONCRETO USINADO BOMBEADO FCK = 15,0MPA

M3 0,0420

74007/2 FORMA TABUAS MADEIRA 3A P/ PECAS CONCRETO ARM, REAPR 2X, INCL MONTAGEM E DESMONTAGEM 2 0,6200 74157/3 LANCAMENTO/APLICACAO MANUAL DE CONCRETO EM ESTRUTURAS M3 0,0420 4759 CALCETEIRO H 0,0800

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,2400 44,62 2,39 47,01 24,96% 11,73 58,74

15.00.00

15.00.01 74134/002 M2

3767 LIXA P/ PAREDE OU MADEIRA UN 0,500 4056 MASSA ACRILICA P/ PAREDES

INTERIOR/EXTERIOR GL 0,198 4783 PINTOR H 0,350 6115 AJUDANTE H 0,250 5,03 5,10 10,13 24,96% 2,53 12,66 15.00.02 74233/001 M2 206085 SELADOR ACRILICO L 0,096 4783 PINTOR H 0,100 6115 AJUDANTE H 0,100 0,39 1,65 2,04 24,96% 0,51 2,55 9,530

PISO (CALÇADA) EM CONCRETO 12MPA TRACO 1:3:5 (CIMENTO/AREIA/BRITA) PREPARO MECANICO, ESPESSURA 7CM, COM JUNTA DE DILATACAO EM MADEIRA

0,68 10,90

PREÇO TOTAL (SINAPI)

EMASSAMENTO COM MASSA ACRILICA PARA AMBIENTES INTERNOS/EXTERNOS, DUAS DEMAOS

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

1,76 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL) BDI (%) 47,07 2,05 9,53 1,91 PREÇO (MAO-DE-OBRA) 4,050 7,040 0,39 0,27 24,040 4,76 PREÇO (MAO-DE-OBRA) 7,04 5,35 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

PREÇO TOTAL UNIT. (c/ taxa):

0,70

PINTURA

PREÇO TOTAL (SINAPI) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

0,95 7,040

0,530

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

9,530 3,34

PINTURA C/FUNDO SELADOR ACRILICO 1 DEMAO

0,70 7,04 1,69 PREÇO (MATERIAL) 8,76 103,54 2,95 100,00 2,85 5,25 0,26 1,97 3,94

MEIO-FIO DE CONCRETO MOLDADO NO LOCAL, USINADO 15 MPA, COM 0,30 M ALTURA X 0,15 M BASE, REJUNTE EM ARGAMASSA TRACO 1:3,5 (CIMENTO E AREIA)

340,39 0,85

343,78 14,44

42,38 26,28

(18)

15.00.03 73954/002 M2 3767 LIXA P/ PAREDE OU MADEIRA UN 0,400

7356 TINTA LATEX ACRILICA L 0,246

4783 PINTOR H 0,200 6115 AJUDANTE H 0,200 3,78 3,32 7,10 24,96% 1,77 8,87 15.00.04 74145/001 M2 3768 LIXA P/ FERRO UN 0,550

5320 REMOVEDOR DE TINTA OLEO/ESMALTE VERNIZ

L 0,044

7288 TINTA ESMALTE SINTETICO FOSCO L 0,176 7307 FUNDO ANTICORROSIVO TIPO ZARCAO

OU EQUIV L 0,131 4783 PINTOR H 0,210 6115 AJUDANTE H 0,110 6,78 2,77 9,55 24,96% 2,38 11,93 15.00.05 6067 M2

7308 FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV

GL 0,033

7294 TINTA ESMALTE SINTETICO ALTO BRILHO GL 0,040

5318 SOLVENTE DILUENTE A BASE DE AGUARRAS L 0,030 3768 LIXA P/ FERRO UN 0,288 6115 AJUDANTE H 0,800 4783 PINTOR H 0,800 4,63 13,25 17,88 24,96% 4,46 22,34 15.00.06 41595 M

212815 FITA CREPE EM ROLOS 25MMX50M UN 0,020 207348 TINTA ACRILICA PARA PISO L 0,029

6115 AJUDANTE H 0,500 4783 PINTOR H 0,100 0,39 4,47 4,86 24,96% 1,21 6,07 15.00.07 72815 M2

7337 TINTA BASE RESINA EPOXI TP COBERIT EPOXY OTTO BAUMGART OU MARCA EQUIVALENTE 0,525 6115 AJUDANTE H 0,500 4750 PEDREIRO H 0,500 20,82 8,29 29,11 24,96% 7,27 36,38

16.00.00

16.00.01 68054 M2

11026 CHAPA GALV PLANA 14GSG 1,994MM 16,020KG/M2

KG 15,280

PINTURA LATEX ACRILICA AMBIENTES INTERNOS/EXTERNOS, DUAS DEMAOS

0,21 3,57

9,530 1,91

74,11 4,850

PORTAO CHAPA 14/GRADE DE FERRO PT-7 - 180308 APLICACAO DE TINTA A BASE DE EPOXI SOBRE PISO

39,640 20,82

PINTURA ESMALTE 2 DEMAOS C/1 DEMAO ZARCAO P/ESQUADRIA FERRO

48,980 1,64 15,820 2,78 0,25 4,790 52,500 14,510 0,530

ESQUADRIAS

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL (SINAPI) BDI (%)

7,040 3,52

9,530 4,77

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

0,29

7,040 3,52

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

0,10 10,130

PREÇO TOTAL UNIT. (c/ taxa):

9,530 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,95 1,00 7,040 1,41 PREÇO (MATERIAL) 13,610 1,78 9,530 PREÇO (MATERIAL)

PREÇO TOTAL UNIT. (c/ taxa): PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%)

7,040 5,63

0,77

DEMARCACAO QUADRA ESPORTIVA C/TINTA ACRILICA P/PISOS

2,210 1,22

22,670 PREÇO TOTAL UNIT. (c/ taxa):

PINTURA EM ESMALTE SINTETICO EM PECAS METALICAS UTILIZANDO REVOLVER/COMPRESSOR, DUAS DEMAOS, INCLUSO UMA DEMAO FUNDO OXIDO DE FERRO/ZARCAO 2,10 8,430 9,530 7,62 2,00 7,040 2,210 0,64

(19)

10952 CANTONEIRA ACO ABAS IGUAIS (QUALQUER BITOLA) E = 1/8"

KG 8,260

1379 CIMENTO PORTLAND CP-32 KG 4,600 1106 CAL HIDRATADA, DE 1A. QUALIDADE,

PARA ARGAMASSA

KG 0,980

370 AREIA MEDIA M3 0,025

26 ACO CA-25 3/8" (9,52 MM) KG 5,097 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 1,500 4750 PEDREIRO H 1,500 145,04 24,86 169,90 24,96% 42,41 212,31 16.00.02 74068/006 UN

3081 FECHADURA EMBUTIR EXTERNA (C/ CILINDRO) COMPLETA - ACAB PADRAO MEDIO CJ 1,000 1214 CARPINTEIRO DE ESQUADRIA H 1,298 6117 AJUDANTE DE CARPINTEIRO H 1,300 73,65 21,49 95,14 24,96% 23,75 118,89 16.00.03 74047/002 UN

2420 DOBRADICA FERRO CROMADO 3 X 3" SEM ANEIS UN 1,000 1214 CARPINTEIRO DE ESQUADRIA H 0,302 6117 AJUDANTE DE CARPINTEIRO H 0,300 3,71 4,99 8,70 24,96% 2,17 10,87 16.00.04 73809/001 M2 367 AREIA GROSSA M3 0,020

601 JANELA ALUMINIO SERIE 25 TP MAXIM AIR 90 X 110CM

M2 1,100

1379 CIMENTO PORTLAND CP-320 KG 2,110

4750 PEDREIRO H 0,989

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,000 285,97 16,46 302,43 24,96% 75,49 377,92 16.00.05 COMP105 M 1379 CIMENTO PORTLAND CP-320 KG 0,162 7697 TUBO ACO GALV C/ COSTURA DIN

2440/NBR 5580 CLASSE MEDIA DN 1.1/2" (40M M 4,166 370 AREIA MEDIA M3 0,001 4750 PEDREIRO H 0,178 6110 SERRALHEIRO H 9,890

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,140 121,64 91,69 213,33 24,96% 53,25 266,58 16.00.06 74072/002 M

7701 TUBO ACO GALV C/ COSTURA DIN 2440/NBR 5580 CLASSE MEDIA DN 2.1/2" (65M M 1,000 PREÇO (MATERIAL) 0,680 1,69 9,000 89,01 0,11 45,10 5,460

PREÇO TOTAL (SINAPI)

PREÇO TOTAL (SINAPI) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL) 14,30 9,530 10,56 20,39 4,000 1,18 47,070 1,13 1,150 7,040

PREÇO TOTAL (SINAPI)

BDI (%)

CORRIMAO TUBO FERRO GALVANIZADO 2 1/2" C/BRACADEIRA

53,890 53,89 0,680 1,43 9,530 9,42 7,040 7,04 29,160 121,47 47,070 0,06

PREÇO TOTAL UNIT. (c/ taxa): GRADIL EM TUBO DE ACO GALVANIZADO 1 1/2"

PREÇO TOTAL UNIT. (c/ taxa): PREÇO (MAO-DE-OBRA) PREÇO (MAO-DE-OBRA) 9,530 1,08 257,710 283,46 2,15 7,040 FECHADURA DE EMBUTIR COMPLETA, PARA PORTAS EXTERNAS, PADRAO DE ACABAME

73,650

BDI (%) PREÇO TOTAL UNIT. (c/ taxa): JANELA DE ALUMINIO TIPO MAXIM-AIR, SERIE 25

54,000

BDI (%) PREÇO TOTAL (SINAPI)

73,65

9,390 12,19

7,150 9,30

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

0,99 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 0,680 3,13 9,390 2,84 7,150 BDI (%)

PREÇO TOTAL UNIT. (c/ taxa): DOBRADICA FERRO CROMADO 3 X 3"

3,710 3,71

(20)

4364 BRACADEIRA C/ PARAFUSO D = 2 1/2" UN 2,000 87373 ARGAMASSA TRACO 1:4 (CIMENTO E

AREIA MÉDIA) PARA CONTRAPISO, PREPARO MANUAL. AF_06/2014

M3 0,003

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,600 63,22 11,26 74,48 24,96% 18,59 93,07 16.00.07 74195/001 M2

550 BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 3/16"

KG 54,951

6025 ARGAMASSA CAL/AREIA MEDIA S/PENEIRAR 1:4 PREPARO MANUAL

M3 0,003

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,586 6110 SERRALHEIRO H 1,600 239,82 25,57 265,39 24,96% 66,24 331,63 16.00.08 74071/002 M2

4917 PORTA ALUMINIO ABRIR, PERFIL SERIE 25, TP VENEZIANA C/ GUARNICAO 87 X 210CM

M2 1,000

87373 ARGAMASSA TRACO 1:4 (CIMENTO E AREIA MÉDIA) PARA CONTRAPISO, PREPARO MANUAL. AF_06/2014

M3 0,006

4750 PEDREIRO H 0,500

6110 SERRALHEIRO H 1,286

6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,697 707,48 21,24 728,72 24,96% 181,89 910,61 16.00.09 COMP102 M2

5032 PAINEL FIXO VIDRO TEMPERADO INCOLOR E = 10 MM, SEM COLOCAÇÃO

M2 1,000

11552 CANALETA ALUMINIO 1 X 1CM P/ PORTA /JANELA CORRER

M 4,000 5,25

20259 BAGUETE DE BORRACHA P/ JANELA 1,5 X 1,0CM M 4,000 6115 AJUDANTE H 3,500 10489 VIDRACEIRO H 3,500 215,62 53,38 269,00 24,96% 67,14 336,14 16.00.10 73862/003 M2

2417 DIVISORIA CEGA (N1) - PAINEL MSO/COMEIA E=35MM -

MONTANTE/RODAPE DUPLO ALUMINIO ANOD NAT - COLOCADA

M2 1,000 119,44 - 119,44 24,96% 29,81 149,25

17.00.00

17.00.01 72117 M2 704,33 PORTA DE ABRIR EM ALUMINIO TIPO VENEZIANA, PERFIL SERIE 25, COM

GUARNICOES

704,33

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL UNIT. (c/ taxa):

PREÇO TOTAL (SINAPI) GUARDA CORPO EM VIDRO TEMPERADO ESP=10MM INCLUSIVE INST.

185,340 185,34

21,00

2,320 9,28

7,040

VIDROS

VIDRO LISO COMUM TRANSPARENTE, ESPESSURA 4MM PREÇO TOTAL (SINAPI)

BDI (%) 3,920 PREÇO (MATERIAL) 4,90 495,40 3,15 9,53 4,77 9,00 11,57 7,04 8,210 28,74 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 24,64 BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

4,350 239,04

260,060 0,78

7,040 11,17

9,000

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

7,84

495,400 1,49

7,040 11,26

BDI (%) PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL (SINAPI) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): GUARDA-CORPO COM CORRIMAO EM FERRO BARRA CHATA 3/16"

14,40

PREÇO (MAO-DE-OBRA)

DIVISORIA 35MM PAINEL CEGO MIOLO COLMEIA REVESTIDA C/CHAPA LAMINADA EM CORES FIBRA MADEIRA PRENSADA C/MONTANTES ALUMINIO ANODIZADO NATURAL EM "L" "T" OU "X" INCL PORTAS EXCL SUAS FERRAGENS.

119,440 119,44

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

(21)

10492 VIDRO LISO INCOLOR 4MM - SEM COLOCACAO

M2 1,000

10498 MASSA PARA VIDRO KG 1,597

6115 AJUDANTE H 0,450 10489 VIDRACEIRO H 0,450 86,39 6,86 93,25 24,96% 23,28 116,53 17.00.02 74125/002 M2

148 ADITIVO À BASE DE EMULSÃO DE POLÍMERO SINTÉTICO PARA ARGAMASSA E CHAPISCO SIKAFIX SUPER OU EQUIVALENTE

L 0,180

587 CANTONEIRA ALUMINIO ABAS DESIGUAIS 1 X 3/4" E = 1/8"

KG 1,540

1344 CHAPA MADEIRA COMPENSADA PLASTIFICADA 2,2 X 1,1M X 6MM P/ FORMA CONCRE UN 1,050 11186 ESPELHO CRISTAL E = 4 MM M2 1,000 10489 VIDRACEIRO H 1,797 6117 AJUDANTE DE CARPINTEIRO H 1,800 293,70 27,63 321,33 24,96% 80,20 401,53

18.00.00

18.01.00

18.01.01 COMP6 KG 333 ARAME GALVANIZADO 14 BWG - 2,10MM - 27,20 G/M KG 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,907 6113 AJUDANTE DE ELETRICISTA H 0,907 11,00 18,61 29,61 24,96% 7,39 37,00 18.01.02 73542 CJ

851 BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 20MM (3/4'')

CJ 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,010 6113 AJUDANTE DE ELETRICISTA H 0,010 0,69 0,20 0,89 24,96% 0,22 1,11 18.01.03 73860/008 M

984 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 2,5MM2, TP PIRASTIC PIREL

M 1,000

21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M

UN 0,001

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 0,050 1,16 1,02 2,18 24,96% 0,54 2,72 51,060 30,74 80,000 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

PREÇO TOTAL UNIT. (c/ taxa):

19,960 53,61 208,000 14,76 7,150 12,87 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) 80,00 4,000

PREÇO TOTAL (SINAPI) BDI (%) 208,00 8,210 1,160 1,16 7,040 0,35 0,00 13,490 0,67 0,880 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL UNIT. (c/ taxa): BUCHA/ARRUELA ALUMINIO 3/4" 0,690 0,69 13,490 0,13 7,040 0,07 7,520 1,35 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL UNIT. (c/ taxa):

ESPELHO CRISTAL ESPESSURA 4MM, COM MOLDURA EM ALUMINIO E COMPENSADO 6MM PLASTIFICADO COLADO

7,040 3,17

8,210 3,69

6,38

BDI (%)

CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 2,5 MM2 FORNECIMENTO E INSTALACAO

INSTALAÇÕES. ELETRICAS/CABEAMENTO

ESTRUTURADO/IMPLANTAÇÃO ELETRICA

INSTALAÇÕES ELETRICAS

ARAME GALVANIZADO 14 BWG 11,000 BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

11,00

7,040

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) PREÇO TOTAL (SINAPI) BDI (%)

6,39

PREÇO TOTAL (SINAPI)

(22)

18.01.04 73860/009 M M

981 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 4MM2, FLEXIVEL, TP FORESP

M 1,000

21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M

UN 0,038

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,061 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 0,055 2,01 1,21 3,22 24,96% 0,80 4,02 18.01.09 73860/010 M

982 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 6MM2, FLEXIVEL, TP FORESPLAST ALCOA OU EQUIV

UND 1,000

21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M

UN 0,011

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,064 6111 SERVENTE OU OPERARIO NAO

QUALIFICADO H 0,068 2,98 1,34 4,32 24,96% 1,08 5,40 18.01.11 COMP7 UN

2556 CAIXA DE PASSAGEM 4" X 2" EM FERRO GALV"

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 6113 AJUDANTE DE ELETRICISTA H 0,150 1,55 3,08 4,63 24,96% 1,16 5,79 18.01.12 COMP8 UN

2557 CAIXA DE PASSAGEM 4" X 4" EM FERRO GALV"

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 6113 AJUDANTE DE ELETRICISTA H 0,150 2,58 3,08 5,66 24,96% 1,41 7,07 18.01.13 COMP9 UN

2555 CAIXA DE PASSAGEM 3" X 3" SEXTAVADA EM FERRO GALV"

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 6113 AJUDANTE DE ELETRICISTA H 0,150 2,58 3,08 5,66 24,96% 1,41 7,07 18.01.14 COMP10 UN 1879 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 3/4" UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 6113 AJUDANTE DE ELETRICISTA H 0,100

2,10 2,05 4,15 24,96% 1,04 CURVA PVC 3/4" P/ ELETRODUTO ROSCAVEL

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): CAIXA MET.HEXAGONAL P/ARANDELA (SEXTAVADA 3"X3")

2,580 2,58

13,490 2,02

7,040 1,06

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): CAIXA DE PASSAGEM METÁLICA ESMALTADA DE EMBUTIR, 4" X 4"

2,580 2,58 13,490 2,02 7,040 1,06 2,100 2,10 13,490 1,35 7,040 0,70 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): CAIXA DE PASSAGEM METÁLICA ESMALTADA DE EMBUTIR, 4" X 2"

1,550 1,55

13,490 2,02

7,040 1,06

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

13,490 0,82

7,040 0,39

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 6 MM2 FORNECIMENTO E INSTALACAO

2,970 2,97

0,880 0,01

13,490 0,86

7,040 0,48

CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 4 MM2 FORNECIMENTO E INSTALACAO

1,980 1,98

(23)

5,19

18.01.15 COMP109 UN

MERCADO DISJUNTOR TERMOMAGNETICO BIPOLAR 25A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

112,00 2,02 114,02 24,96% 28,46 142,48 18.01.16 COMP106 UN

DISJUNTOR TERMOMAGNETICO BIPOLAR 10A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

57,50 2,02 59,52 24,96% 14,86 74,38 18.01.17 COMP107 UN

DISJUNTOR TERMOMAGNETICO BIPOLAR 16A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

57,50 2,02 59,52 24,96% 14,86 74,38 18.01.18 COMP108 UN

MATCH_108 DISJUNTOR TERMOMAGNETICO BIPOLAR 25A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

39,17 2,02 41,19 24,96% 10,28 51,47 18.01.19 COMP_DIS1 UN

MATCH_DIS1 DISJUNTOR TERMOMAGNETICO BIPOLAR 10A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

57,50 2,02 59,52 24,96% 14,86 74,38 18.01.20 COMP_DIS2 UN

MATCH_DIS2 DISJUNTOR TERMOMAGNETICO BIPOLAR 16A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

57,50 2,02 59,52 24,96% 14,86 74,38 18.01.21 COMP_DIS3 UN

MATCH_DIS3 DISJUNTOR TERMOMAGNETICO BIPOLAR 40A

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150

57,50 2,02 59,52 24,96% 14,86 74,38 18.01.22 74130/005 UN 2373 DISJUNTOR TERMOMAGNETICO TRIPOLAR 100A UN 1,000 57,500 57,50 57,50 13,490 39,170 39,17

DISJUNTOR BIPOLAR 25 A REF. SIEMENS, PRIMELETRICA OU LOUSANO

13,490 2,02

DISJUNTOR BIPOLAR 10 A REF. SIEMENS, PRIMELETRICA OU LOUSANO PREÇO (MAO-DE-OBRA)

PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): PREÇO TOTAL (SINAPI) BDI (%)

2,02 PREÇO (MATERIAL)

PREÇO (MAO-DE-OBRA)

13,490 PREÇO TOTAL (SINAPI)

BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): DISJUNTOR BIPOLAR 40 A REF. SIEMENS, PRIMELETRICA OU LOUSANO

57,500

13,490 2,02

PREÇO TOTAL UNIT. (c/ taxa): DISJUNTOR BIPOLAR 16 A REF. SIEMENS, PRIMELETRICA OU LOUSANO

57,500 57,50 2,02 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO (MATERIAL)

DISJUNTOR BIPOLAR 10 A REF. SIEMENS, PRIMELETRICA OU LOUSANO

57,500 57,50

13,490 2,02

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): DISJUNTOR BIPOLAR 16 A REF. SIEMENS, PRIMELETRICA OU LOUSANO

57,500 57,50

DISJUNTOR TERMOMAGNETICO TRIPOLAR 70A

70,080 70,08

13,490 2,02

PREÇO TOTAL UNIT. (c/ taxa):

112,00 DISJUNTOR NORMA DIN TIPO DDR(30MA) F-F, BIPOLAR 25. A REF. SIEMENS,

PRIMELETRICA OU LOUSANO

112,000

BDI (%) PREÇO TOTAL UNIT. (c/ taxa): PREÇO (MATERIAL) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

13,490 2,02

PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA)

(24)

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,570 6113 AJUDANTE DE ELETRICISTA H 0,533 70,08 11,44 81,52 24,96% 20,35 101,87 18.01.23 74130/007 UN 2393 DISJUNTOR TERMOMAGNETICO TRIPOLAR 250A/600V, TIPO FXD SIEMENS OU EQUIV

UN 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,407 6113 AJUDANTE DE ELETRICISTA H 0,385 584,35 8,20 592,55 24,96% 147,90 740,45 18.01.24 COMP11 M

16134 PERFILADO EM CHAPA DE AÇO COM TAMPA LISO (ALTURA: 38,00 MM / LARGURA: 38,00 MM)

M 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,650 6113 AJUDANTE DE ELETRICISTA H 0,650 35,00 13,35 48,35 24,96% 12,07 60,42 18.01.25 COMP12 M

2674 ELETRODUTO PVC ROSCA S/LUVA 20MM - 3/4"

M 1,000

1891 LUVA PVC ROSCAVEL P/ ELETRODUTO 3/4"

UN 1,000

6113 AJUDANTE DE ELETRICISTA H 0,200 2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,200

3,37 4,11 7,48 24,96% 1,87 9,35 18.01.26 72934 M 2689 ELETRODUTO PVC FLEXIVEL

CORRUGADO 20MM TIPO TIGREFLEX OU EQUIV

M 1,000

6113 AJUDANTE DE ELETRICISTA H 0,119 2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,120

1,31 2,46 3,77 24,96% 0,94 4,71 18.01.27 72935 M 2688 ELETRODUTO PVC FLEXIVEL

CORRUGADO 25MM TIPO TIGREFLEX OU EQUIV

M 1,000

2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,154 6113 AJUDANTE DE ELETRICISTA H 0,143 1,73 3,07 4,80 24,96% 1,20 6,00 18.01.28 68069 UN

3380 HASTE DE TERRA EM ACO REVESTIDO DE COBRE DN 5/8'' X 3000MM C/ CONECTOR

UN 1,000 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa): HASTE COPPERWELD 5/8" X 3,0M C/CONECTOR

25,350 25,35 1,310 1,31 7,040 0,84 13,490 1,62 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

ELETRODUTO PVC FLEXIVEL CORRUGADO 25MM TIPO TIGREFLEX OU EQUIV

1,730 1,73

13,490 2,07

7,040 1,00

BDI (%) PREÇO TOTAL UNIT. (c/ taxa): ELETRODUTO PVC RIGIDO 3/4" C/ LUVA APARENTE

2,160 2,16 1,210 1,21 7,040 1,41 13,490 2,70 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

ELETRODUTO PVC FLEXIVEL CORRUGADO 20MM TIPO TIGREFLEX OU EQUIV

7,040 2,71

PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

ELETROCALHA DE AÇO GALVANIZADO, PERFURADA, COM TAMPA DE ENCAIXE, COM ACESSORIOS 35,000 35,00 13,490 8,77 7,040 4,58 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI)

DISJUNTOR TERMOMAGNETICO TRIPOLAR EM CAIXA MOLDADA 250A 600V, FORNECIMENTO E INSTALACAO 584,350 584,35 13,490 5,49 13,490 7,69 7,040 3,75 PREÇO (MATERIAL) PREÇO (MAO-DE-OBRA) PREÇO TOTAL (SINAPI) BDI (%) PREÇO TOTAL UNIT. (c/ taxa):

Referências

Documentos relacionados

A educação para a saúde é uma ferramenta para a prevenção de enfermidades, neste contexto, é importante enfatizar a necessidade da realização de programas de saúde pública,

QDC3 - BARRAMENTO 100A - QUADRO DE DISTRIBUICAO DE ENERGIA EM CHAPA METALICA, DE SOBREPOR, COM PORTA, PARA 20 POSIÇÕES, COM DISPOSITIVO PARA CHAVE GERAL, COM BARRAMENTO

[r]

Os incrementos nos valores de densidade do solo ocasionados pelo recalque (redução do volume do corpo- de-prova) – em função do aumento dos níveis de pressão e de crescentes teores

Não será nossa primeira vez que proporemos uma reflexão acerca da articulação entre a língua e a literatura pelo viés da teoria do discurso, pois já fizemos isso em nossa

29 Secretária do Meio Ambiente de Alagoinhas 1 30 Secretária do Meio Ambiente de Rio Real 1 31 Secretária do Meio Ambiente de Camaçari 1 32 Secretaria de Meio Ambiente

CAPACITÉ 60 000 t / an 150.000 m² / an 7500 t / an 15 000 t / an 15 000 t / an 15 000 t / an 35 000 m² / an 12 000 t / an ZONE 69 500 m² 12 000 m² 7360 m² 20 000 m² 15 600 m² 11

O uso de NORVIR  (ritonavir) é contraindicado em combinação com as seguintes substâncias: antagonistas alfa1-adrenoreceptores (cloridrato de alfuzosina),