Republic of Mozambique Ministry of Education. Procurement Plan. (Version )

N/A
N/A
Protected

Academic year: 2021

Share "Republic of Mozambique Ministry of Education. Procurement Plan. (Version )"

Copied!
23
0
0

Texto

(1)

Procurement Plan

(Version 2 - 2013)

I.

General

1.

Project information: Ministry of Education and Culture, Mozambique, Education

Sector Support Fund - P125127, Credit 4930 MZ

2.

GT PGF approval date of the Procurement Plan (Original):

3.

Date of General Procurement Notice:

4.

Period covered by this procurement plan: Jan 2013 – Jan. 2014

II.

Goods and Works and non-consulting services

1.

Prior Review Threshold: Procurement Decisions subject to Prior Review by the

Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method

Prior Review threshold

US$

Comments

1. ICB and LIB (Goods)

> US$ 500,000

DC:

All

2. NCB (Goods)

<US$ 500,000

Post Review

DC

All

3. ICB (Works)

>US$ 5,000,000

All

DC

All

4. NCB (Works)

<U$D 5,000,000

Post Review

DC

All

5. ICB (Non-Consultant Services)

> US$ 200.000

Post Review

2.

Prequalification: There will be no prequalification of bidders, unless stated

otherwise in the Bidding Documents

3.

Proposed Procedures for CDD Components (as per paragraph. 3.17 of the

Guidelines): N/A

4.

Reference to (if any) Project Operational/Procurement Manual: N/A

5.

Any Other Special Procurement Arrangements: N/A

6.

Summary of the Procurement Packages planned for 2013

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

Estim (US Procu Pr Dom (yes/n Review by (Prior Expe Ope ning Com 12.4.1.3.1.2 Construção da Escola Secundária de Quelimane (Zambézia) Contruction of Secondary School “Quelimane”

(Zambezia Province) ICB No No Prior

Nov-13 12.4.1.3.2.5 Construção da Escola Secundária de Muchatazine (Sofala) Construction of Secondary School Muchatazine

(Sofala Province) NCB No No Post

Out-13

12.4.1.3.1.4. Conclusão de 04 Escolas

Secundárias (Manica) Completion of Construction of 4 Secondary Schools

(Manica Province) NCB No No Post

Nov-13

12.5.1.3.2.3-a Ampliação do Edifício Hotel

no ICC de I´bane (2ª fase) Extension/Expansion of the “Hotel” Building in “Instituto Comercial de Inhambane” (2nd phase)

NCB No No Post Set-13

12.2.1.4.3.2. Reabilitação do IFP de

Inhamízua (Sofala) Rehabilitation of “Instituto de Formacao de Professores” de Inhamizua (Sofala Province)

NCB No No Post Set-13

12.5.1.3.2.4-a Construção de duas oficinas no IICAEG - Beloluane Construction of two workshops in IICAEG – Beloluane (Maputo Province) NCB No No Post Nov-13

12.5.1.3.2.5-a Construção do Edifício do

Hotel no IIC de Pemba Construction of the “Hotel” Building in “Instituto

Industrial de Pemba” NCB No No Post Ago-13 12.5.3.16.2.1 Construção de Edifício da

ANEP Construction of ANEP Building ICB No No Prior Out-13 12.5.1.3.2.6-a Construção dos Edifícios

do hotel e sanitários no IC de Maputo

Construction of the “Hotel” Buildings and toilets in “Instituto Comercial de Maputo”.

(3)

Estim (US

D)

Pr

ocu Pr

Dom (yes/n Review by (Prior Expe Ope

ning Com 12.2.1.4.7.2 Fornecimento de Equipamento de medição de precisão para o Programa de Construção Acelerada de Infra-estruturas Escolares (para todas as Províncias) Supply of Precision Measurement Equipment for Program of Accelerated Construction of Schools Infrastructure (for all

provinces) NCB No No Post Jul-13

12.1.1.4.9.2 Fornecimento de Equipamento para Assistência técnica a DIPLAC-CEE (co-participação KfW)

Supply of Equipment for Technical assistance to DIPLAC-EEC (co-participation KfW) NCB No No Post Ago-13 12.2.1.4.1.4 Fornecimento de Estruturas Metálicas para as Obras de Construção Acelerada (campanha de 2014)

Supply of Steel Structures for Accelerated Construction

Works (Campaign 2014) ICB No No Prior Ago-13

12.2.1.4.2.1 Fornecimento de Equipamento para 60 casas para professores, nas províncias de Gaza, Zambézia e cabo Delgado

Supply of Equipment for 60 houses for teachers in the provinces of Gaza, Zambezia

and Cabo Delgado NCB No No Post Ago-13

12.4.1.3.7.1 Fornecimento de Rede de Informática para 12 escolas

Supply of IT Network for 12

schools NCB No No Post Mai-13 12.1.1.5.2.2 Fornecimento de

Equipamento para as novas instalações do CNECE

Supply of Equipment for the

new facilities of CNEC NCB No No Post Set-13

12.1.1.5.2.3 Fornecimento de Equipamento para o edifício do armazém do MINED

Supply of Equipment for warehouse building of

MINED NCB No No Post Ago-13 12.1.2.9.3.1 Fornecimento de

Windows 2008

Supply of Windows 2008 Shop No No Post Mai-13 12.1.2.9.3.2 Fornecimento de

(4)

12.1.2.9.3.4 Fornecimento de duas máquinas de leitura óptica para correcção automática de exames (OMR) para as províncias de Cabo Delgado e Manica. Supply of two-readable machines for automatic corrections of exams (OMR) for the provinces of Cabo

Delgado and Manica. NCB No No Post Jul-13

12.1.1.5.3.4 Fornecimento de mobiliário para MINED em

equipamento diverso e mobiliário

Supply of furniture for MINED in miscellaneous equipment

and furniture NCB No No Post Jul-13

12.2.1.4.6.1 Fornecimento de Carteiras Escolares - Programa de carteiras escolares (centralizado)

Supply of School Desks - Program of School Desks

(centralized) ICB No No Prior Jul-13

12.2.1.4.6.1-a Fornecimento de carteiras escolares no âmbito de emergência

Supply of school desks due

to the emergency situation Shop No

No Post Mai-13

12.2.2.9.1.1 Contrato de impressão de livros escolares - 1ª-2ª classes

Contract for the printing of school books - 1st-2nd

grades ICB No No Prior Jun-13 12.2.2.9.1.2 Contrato de

impressão de livros 1ª-2ª classes NCB

Contract for the printing of

school books 1st-2nd grades NCB

No No Post Jun-13 12.2.2.9.1.3 Contrato de

reimpressão de livros 3ª-7ª classes

Contract for reprinting of school books - 3 rd-7 th

classes ICB No No Prior Jun-13 12.2.2.9.2.2 Impressão do Guião

do professor

Printing the Script teacher NCB

No No Post Jul-13 12.2.2.9.2.2-a Maquetização do

Guião do professor Layout of Teacher's Script Shop No No Post Mai-13 12.2.2.9.3.1 Preparação,

maquetização e impressão manual do programa de apoio directo às escolas

Design, Layout and printing of the Manual of the program

for direct support to schools NCB No No Post Jun-13

12.2.1.7.1.3 Impressão e distribuição dos conteúdos adaptados da 1ª e 2ª classe

Printing and distribution of the contents adapted from

(5)

12.1.2.7.5.2 Impressão de 1500 exemplares de padrões e indicadores de qualidade para os IFPs, Escolas Secundárias e Alfabetização e Educação de Adultos Printing of 1,500 copies of standards and quality indicators for IFPs, Secondary Schools and

Literacy and Adult Education Shop No No Post Jun-13

12.1.0.2.7.4 Aquisição de

Software e licenças. Acquisition of Software and licenses NCB No No Post Mai-13 12.2.2.10.4.2 Fornecimento de

prémios para promover concursos de Leitura e Escrita em todo o país

Supply of prizes to promote reading and writing contests

across the country shop No No Post Mai-13

12.2.2.14.1.1 Imprimir e distribuir o Manual de educação para a cidadania

Printing and distribution of the Manual of citizenship

education Shop No No Post Mai-13 12.2.3.15.3.3 Maquetizar, imprimir

e distribuir o REGEB-Revisto

Layout, printing and distribution of the

REGEB-Revised Shop No No Post Mai-13 12.2.3.15.5.2 Impressão e

distribuição dos programas de ensino e Plano Curricular

Printing and distribution of education programs and

Curriculum Plan Shop No No Post Jun-13 12.2.1.3.3.4 Fornecimento de equipamentos e consumíveis para funcionamento do departamento Pré-escolar a nível central, provincial e distrital

Supply of equipment and consumables for operation of the Pre-school department at central, provincial and district

levels NCB No No Post Jun-13

12.4.2.07.2.2 Fornecimento de microkits para escolas rurais numa base experimental

Supply of micro kits for rural schools on an experimental

basis ICB No No Prior Set-13 12.4.2.7.3.1 Fornecimento de e

distribuir Bancadas Móveis de Ciências (BMC) pelas províncias.

Supply and distribute of Mobile Benches of Sciences

by the provinces. Shop No No Post Mai-13 12.4.2.07.4.1 Fornecimento de e

distribuir Kits de laboratório pelas escolas

Acquire and distribute kits for

laboratory schools ICB

(6)

12.4.2.07.5.4 Elaboração, reprodução e distribuição de textos de apoio da disciplina de DGD Preparation, reproduction and distribution of supporting

texts of the DGD subject Shop No No Post Jun-13 12.1.1.5.10.9 Edição e reprodução

dos" instrumentos de trabalho do

Assistente Social"

Editing and printing of "instruments of Social Work"

Shop No No Post Jul-13 12.1.2.10.1.1 Desenvolver e aquisição de conteúdos multimédia e interactivos e Introduzir as TIC enquanto ferramenta de aprendizagem

Develop and acquisition of multimedia content and interactive and introduce ITC

as a learning tool NCB No No Post Jun-13 12.4.3.12.1.5 Reproduzir regulamento de avaliação do ensino secundário geral

Printing of the Regulation for the assessment of general

secondary education Shop No No Post Jun-13 12.4.2.10.1.1 Elaborar, reproduzir e

distribuir guiões de experiências obrigatórias para as escolas

Design, printing and distribution of scripts of experience mandatory for

schools Shop No No Post

Jun-13

12.4.2.9.6.2 Elaboração e impressão do material de capacitação

Preparation and printing of training materials

Shop No No Post Mai-13 12.4.2.07.6.3 Fornecimento de e

distribuir os Kits Agro-Pecuários

Supply and distribute the kits

of Agro-Livestock NCB No No Post Set-13 12.4.2.08.5.2 Fornecer insumos

para os Cursos Modulares de Curta Duração

Supply inputs for Modular Courses Short Term

Shop No No Post Ago-13 12.4.2.08.3.3 Produzir Vídeos de

CN e EPMC para 60 escolas

Produce Videos of CN and

EPC for 60 schools NCB No No Post Set-13 12.4.3.15.2.2 Reproduzir o manual do conselho de escola e do regulamento do ensino secundário geral

Reprinting of the manual of the school council and the regulation of general

secondary education Shop No No Post Jun-13 12.5.1.3.8.2 Fornecimento de

equipamento para diferentes instituições do ETP

Supply of equipment for

various institutions of ETP ICB

(7)

12.5.1.3.8.3 Fornecimento de equipamento de rega (pivot) para o IAC

Supply of irrigation

equipment (pivot) to the IAC Shop No No Post Mai-13 12.5.1.5.1.1 Fornecimento de Materiais para Introdução do ensino técnico á distancia em Moçambique com base na Experiência da ISDB-

Supply of Materials for the Introduction of the distance technical education in Mozambique based on the

ISDB-Experience Shop No No Post Jun-13 12.1.3.11.7.6 Fornecimento e distribuição de 14.940 baldes com tampa e torneira e 74.700 copos para as escolas das províncias de Nampula, Niassa e Cabo Delgado)

Supply and distribution of 14,940 buckets with lid and tap and 74,700 glasses for schools in the provinces of Nampula, Niassa and Cabo

Delgado) Shop No No Post Ago-13

12.1.3.15.2.1 Impressão e disseminação de 800 Exemplares do Regulamento de Ensino Particular revisto no formato de brochura.

Printing and dissemination of 800 copies of the revised Regulation of Private

Education in booklet form. Shop No No Post Ago-13

12.2.1.5.5.2 Fornecimento e distribuição de materiais do programa Pacote Básico para as províncias

Supply and distribution of the materials of the program

Basic Package for provinces ICB

No No Prior Jul-13

12.2.2.12.6.3 Fornecimento e distribuição de materiais do Pacote Básico para IFPs (novo modelo)

Supply and distribution of the materials for the Basic

Package IFSP (new model) NCB No No Post Jul-13

12.1.3.11.7.2 Fornecimento de medicamentos desparasitantes para a zona norte: Nampula, Niassa e Cabo Delgado (sendo 700,000 comprimidos de albendazol de 400mg e 966,264 comprimidos de parazinquantel de 40 ou 600mg)

Supply of worming medicines for the northern area: Nampula, Niassa and Cabo Delgado (being 700,000 tablets of albendazole 400mg and 966.264 tablets of parazinquantel of 40 or 600mg) Shop No No Post Jun-13

(8)

12.1.3.14.2.2 Fornecimento de Materiais para elaborar as campanhas temáticas

Supply of Materials for preparing the thematic

campaigns Shop No No Post Jun-13 12.1.3.13.4.2 Fornecimento de

material para emergência.

Supply of material for the

emergency. NCB No No Post Jun-13 12.1.3.13.2.3 Imprimir e distribuir o

manual para elaboração do PDA

Print and distribute the manual for the elaboration of

the PDA Shop No No Post Mai-13 12.1.3.14.2.3 Elaborar os materiais

para as campanhas

Develop materials for

campaigns. Shop No No Post Jul-13 12.1.1.4.10.2 Finalização e impressão de dois módulos POEMA ("Gestão de Empreitadas" e "Documentos e Arquivos”)

Finalization and printing of two modules EM

("Management Contracts"

and "Documents and Files”) Shop No No Post Mai-13

12.1.3.12.3.6 Produzir uma brochura sobre a Carta Escolar

Produce a brochure about

the Charter School Shop No No Post Jun-13 12.3.1.03.3.1 Produção do material publicitário alusivo à semana e ao dia internacional de Alfabetização (cartazes e dísticos para todas as províncias do pais) Production of advertising material allusive to the week and international day of Literacy (posters and couplets to all provinces of the country)

Shop No No Post Mai-13

12.3.2.08.1.2 Imprimir 1.000.000 de cadernos de Exercícios de Alfabetização de cada título. Print 1,000,000 notebooks of Exercise of Literacy of each

title. ICB No No Prior Jul-13

12.3.2.8.3.2 Reimprimir e distribuir 30.000 manuais de literacia e numeracia de cada título para o alfabetizador (com base no curriculum aprovado).

Reprinting and distribution of 30,000 Manual of literacy and numeracy of each title for literacy (based on approved

(9)

12.3.2.8.3.3 Reimprimir e distribuir 150.000 exemplares de folhetos (livros de Educando) Português, Matemática e Ciências Naturais para o 3º Ano, cada título.

Reprinting and distribution of 150,000 copies of leaflets (Educating books) Portuguese, Mathematics and Natural Sciences for the

3rd Year, each title NCB No No Post Jun-13

12.3.2.8.3.4 Reimprimir e distribuir 30.000 exemplares de folhetos (manuais do Educador) Português Matemática e Ciências Naturais para o 3º Ano, cada título.

Reprinting and distribution of 30,000 copies of leaflets (manuals Educator)

Portuguese Mathematics and Natural Sciences for the 3rd

Year, each title. NCB No No Post Jul-13

12.3.2.8.4.3 Reproduzir e distribuir 300.000 CD´s

Reproducing and distribution

of 300,000 CD's Shop No No Post Out-13 12.3.2.10.2.1 Reimprimir e distribuir 20.000 programas e Orientações metodológicas para a literacia e numeracia por cada título - nível Alfabetização.

Reprinting and distribution of 20,000 programs and methodological guidelines for literacy and numeracy for

each title - Literacy level. Shop No No Post Jul-13

12.3.2.10.2.2 Reimprimir 20.000 Planos curriculares do nível de Alfabetização e Educação de Jovens e adultos. Reprinting of 20,000 Curricula Plans of the level of Literacy of Youth and adults.

Shop No No Post Ago-13 12.3.2.10.2.3 Reimprimir 20.000 regulamentos de Avaliação do nível de Alfabetização de Jovens e adultos. Reprinting of 20,000 Regulations Assessment of

Literacy for Youth and Adults. Shop No No Post Jun-13 12.3.2.10.3.1 Fornecimento de 25

títulos de livros para o apetrechamento das bibliotecas dos IFEA´s, sendo 6 exemplares cada título.

Supply of 25 book titles for the equipping of the libraries of IFEA's, 6 copies each title.

(10)

12.3.2.09.1.1 Reimprimir 3.000 exemplares dos 7 títulos de habilidades para a vida para cada título.

Reprinting of 3,000 copies of 7 titles of skills for life for

each title Shop No No Post Jun-13 12.1.1.03.2.3 Fornecimento de

equipamento informático

Supply IT equipment

Shop No No Post Ago-13 12.1.1.03.5.2 Fornecimento de

Prémios para Homenagem a 35 funcionários aposentados

Supply of prizes for Tribute 35 to retired employees

Shop No No Post Ago-13 12.1.1.4.1.2 Maquetização e

impressão da brochura de rotinas de gestão de RHs e dispositivos legais

Layout and printing of the brochure of routines of management of HRs and

legal provisions Shop No No Post Jul-13 12.1.1.5.10.7 Fornecimento de 450

bicicletas para Assistentes Sociais das ZIPs

Supply of 450 bicycles for Social Workers of ZIPs

Shop No No Post Jun-13 12.1.1.5.10.8 Fornecimento de 500

pastas de trabalho para Assistentes Sociais das ZIPs

Supply of 500 workbooks for Social Workers of ZIPs

Shop No No Post Jul-13 12.1.1.5.10.5 Divulgação do programa de Assistência Social em banda desenhada, calendários e desdobráveis

Disclosure of Social Work program in comics, calendars and leaflets

Shop No No Post Mai-13 12.1.1.5.6.2 Fornecimento e distribuição de equipamento informático para as UO do MINED (em curso e lançamento para a compra em 2014)

Supply and distribution of IT equipment for the Units of MINED (ongoing for the release for the purchase in

2014) ICB No No Prior Set-13

12.1.1.5.6.7 Fornecimento de equipamento informático para apetrechamento das DPECs e SDEJTs

Supply of IT equipment for equipping the DPECs

(11)

12.1.1.5.6.9 Fornecimento de equipamento informático para a ligação entre o MINED, UO e DPECs (email/Internet/Storag e)

Supply of IT equipment for the connection between MINED, UO and DPECs

(email / internet / Storage) NCB No No Post Set-13

12.4.2.10.1.2 Fornecimento de equipamento informático para centros de apoio ao ensino à distância com recursos às TICs Supply of IT equipment to support centers for distance learning with ITCs resources

ICB No No Prior Nov-13

12.4.2.7.1.1 Fornecimento de equipamento informático para a implementação do PTE para salas de aula.

Supply of IT equipment for the implementation of the

PTE for classrooms. ICB

No No Prior Nov-13 12.4.2.7.1.4 Fornecimento de softwares necessários para o funcionamento pleno das salas de informática

Supply of software necessary for the full operation of computer rooms

Shop No No Post Jun-13 12.4.3.12.1.1 Fornecimento de software para a gestão escolar e melhorar os processos de gestão e administração escolar

Supply of software for school management and improve management processes and

school administration Shop No No Post Mai-13

12.4.1.4.2.3 Produção e distribuição do material de

divulgação do PESD

Production and distribution of advertising material of PESD

Shop No No Post Mai-13 12.4.1.4.6.3 Reprodução e

distribuição de módulos do PESD - I Ciclo para 49.750 alunos no ano lectivo 2014.

Reproduction and distribution of modules PESD - I Cycle for 49,750 students in the

academic year 2014 ICB No No Prior Jul-13

12.1.2.8.6.2 Produção de 40mil folheto e 60mil calendário publicitário sobre as matrículas do ano lectivo de 2013 Production of 40,000 brochures and 60,000 advertising calendar on enrollment for the academic year of 2013

(12)

12.4.2.8.2.4 Reprodução dos módulos da disciplina de

Empreendedorismo

Reproduction of the modules of the discipline of

Entrepreneurship NCB No No Post Mai-13 12.2.2.12.2.4 Fornecimento de

diversos livros para a formação nos IFPs

Supply of diverse books for

training in IFPs Shop No No Post Mai-13 12.2.2.9.4.2 Reprodução e

distribuição dos programas revistos

Reproduction and distribution

of revised programs Shop No No Post Ago-13 12.2.2.10.3.2 Maquetização e Reprodução de três módulos do Projecto Ler e Compreender: 5.000 exemplares cada manual

Layout and printing of three modules of the Project Read and Understand: 5,000

copies each manual Shop No No Post Ago-13 12.1.3.14.8.2 Fornecimento de

artigos científicos ou de pesquisa ou de experiência em Ensino a Distância

Supply of articles scientific or for research or for experience

in Distance Education Shop No No Post Ago-13 12.5.1.3.2.3-b Fornecimento de

Equipamento para a Reabilitação e ampliação do IA Lichinga (e represa)

Supply of Equipment for Rehabilitation and expansion

of IA Lichinga (and dam) ICB No No Prior Jul-13

12.5.1.3.2.4-d Fornecimento de Equipamento para IIC de Inhambane

Supply of Equipment for IIC

Inhambane ICB No No Prior Jun-13 12.5.1.3.2.3-b Fornecimento de

Mobiliário para IIC de Inhambane

Supply of Furniture for IIC

Inhambane NCB No No Post Jun-13 12.5.1.3.2.3-b Fornecimento de

Equipamento para o Edifício do Hotel do IIC de I´bane

Supply of Equipment for the “Hotel” building of the IIC of

I'bane NCB No No Post Jul-13 12.5.1.3.2.3-c Fornecimento de

Mobiliário para o Edifício do Hotel do IIC de I´bane

Supply of Furniture for the Hotel building of the IIC

I'bane NCB No No Post Jul-13 12.5.1.3.2.6-b Fornecimento de

Equipamento para o Edifício do Hotel do IIC de Pemba

Supply of Equipment for the Hotel building of the IIC

Pemba NCB No No Post Nov-13 12.5.1.3.2.6-c Fornecimento de

Mobiliário para o Edifício do Hotel do IIC de Pemba

Supply of Furniture for the Hotel building of the IIC

(13)

12.5.1.3.2.7-b Fornecimento de Equipamento para o Edifício do Hotel do IC de Maputo

Supply of Equipment for the

Hotel building of IC Maputo NCB

No No Post Out-13 12.5.1.3.2.4-c Fornecimento de Mobiliário para os Laboratórios de Informática do IICAEG - Beloluane

Supply of Furniture for the Computer Labs of IICAEG -

Beluluane Shop No No Post Ago-13 12.5.3.16.2.1-c Fornecimento de

Equipamento para o Edifício da ANEP

Supply of Equipment for

Building of ANEP ICB No No Prior Jul-13 12.5.3.16.2.1-d Fornecimento de

Mobiliário para o Edifício da ANEP

Supply of Furniture for the

building of ANEP NCB No No Post Jun-13 12.5.1.3.2.7-c Fornecimento de

Equipamento para o Edifício do Hotel do IC de Maputo

Supply of Equipment for the

Hotel building of IC Maputo NCB

No No Post Nov-13

12.5.1.3.2.4-b Fornecimento de Equipamento Informático para IICAEG-Beloluane

Supply of IT Equipment for

IICAEG-Beluluane NCB

(14)

Estim (US D) Pr ocu Pr eq

(yes/n Dom (yes/n Review by (Prior Expe Ope

ning

Com

12.1.0.2.5.1 Assegurar a despesa com o armazenamento dos livros, equipamentos e materiais didácticos

Ensure expenditure on storage of books, equipment

and materials DC No No Prior Jun-13 12.2.2.9.1.4 Contrato de inspecção de

livros escolares Contract inspection for textbooks Shop No No Post Mai-13 12.2.2.9.1.6 Desalfandegamento do

livro escolar Clearance of textbook NCB No No Prior Ago-13 12.1.1.5.1.6 Remodelação e

manutenção do elevador do MINED

Refurbishment and

maintenance of MINED lifts DC No No Prior Mai-13 12.1.1.4.3.1 Capacitar os técnicos de

DPEC e DAF (reunião) Train technicians of DPEC and DAF (meeting) NCB No No Post Jul-13 12.2.2.9.2.3 Desalfandegamento do

Guião do professor

Teacher's Script Clearance NCB No No Post Jul-13 12.2.2.9.2.2 Maquetização do Guião do

professor Layout of Teacher's Script Shop No No Post Jun-13 12.2.2.9.2.4 Distribuição do Guião do

professor Distribution of Teacher Script Shop No No Post Jul-13 12.2.1.4.6.2 Desalfandegamento e

Distribuição de Carteiras Clearance and Distribution of School desks NCB No No Prior May-13 12.1.2.8.4.1 Implementação (configuração e instalação) do Pacote de Contabilidade Implementation (installation and configuration)

Accounting Package NCB No No Post Jun-13 12.2.2.9.1.7-a Distribuição de livros

escolares – centro & norte Distribution of textbooks - the central and northern DC No No Prior Jun-13 12.2.2.9.1.7-b Distribuição de livros

escolares – Zona Sul Distribution of textbooks – South region NCB No No Prior Jun-13 12.2.1.7.2.1 Elaboração do Módulo da

socialização para alunos com NEE, com 35 participantes

Preparation of the Module of socialization for pupils with

NEE, with 35 participants Shop No No Post Ago-13 12.1.3.14.5.1 Concepção de materiais

IEC sobre Álcool e Outras drogas para comunidade escolar

Design of IEC materials on Alcohol and Other Drugs to

school community Shop No No Post Mai-13 12.1.3.13.2.2 Elaborar um manual Develop a manual Shop No No Post Ago-13 12.1.3.14.2.2 Elaborar as campanhas

temáticas Develop thematic campaigns Shop No No Post Jul-13 12.1.1.3.2.1 Instalação do sistema de

Gestão de Recursos Humanos no Órgão Central

Installation of System of Human Resources

Management in Central Level Shop No No Post Mai-13 12.4.1.4.1.3 Conectividade:

Implementar, de forma gradual, o acesso à Internet com maior banda (vídeo conferência) para 45 centros de e-Learning

Connectivity: Implement, gradually, the Internet access with greater band (video conference) to 45 e-learning centers

(15)

12.1.0.2.7.3 Anti-virus Sophos renovação para mais 2 anos em 2014

Sophos Antivirus renewal for

2 more years in 2014 DC No No Post Out-13 12.1.0.2.7.7 Pagamento de licenças de

plataforma de virtualização Vmware de dois servidores

Payment of licenses of VMware virtualization platform two servers

DC No No Post Jun-13 12.1.0.2.7.5 Pagamento de renovação

de licença de Cyberoam CR500ia para anti-span, instrucão, filtros de conteúdos, gestor de conectividade e entre outros para 2 anos em 2014

Payment of license renewal Cyberoam CR500ia for anti-span, instruction, content filters, connectivity manager and others for two years in 2014

Shop No No Post Out-13

12.1.0.2.3.3 Garantir Serviços para o funcionamento dos CPED de Niassa

Ensure Services for the

(16)

1.

Competitive Methods (Firms)

QCBS > 200,000

QBS > 200,000

CQS > 200,000

LCS > 200,000

2.

Single Source (Firms)

All

3.

Individual Consultants

ICS > USD 100,000

2.

Short list comprising entirely of national consultants: Short list of consultants for

services, estimated to cost less than $ 200,000 equivalent per contract, may

comprise entirely of national consultants in accordance with the provisions of

paragraph 2.7 of the Consultant Guidelines.

3.

Any Other Special Selection Arrangements: NA

Consultancies

Code Description of Assignment Estim ate d Cost (US D) Selectio n M eth od Review by Ban k (P rior /P ost) Expe cted Pr op osa ls Sub m issi on Date Com m en ts Portuguese English

12.1.1.5.2.2 Fiscalização das obras de conclusão da reabilitação e adaptação da ex-creche do MINED em CNECE Supervision of conclusion Works of the rehabilitation and adaptation of former MINED daycare in CNECE LCS Post Jun-13

12.1.1.5.2.3 Fiscalização das obras de conclusão da reabilitação do edifício do MINED e armazém do MINED

Supervision of conclusion works of rehabilitation of MINED Building and Warehouse

QBS Post Jun-13

12.1.2.7.6.1 Elaboração de tipologia de escolas e instituições de ensino, incluindo o mobiliário e equipamento

Development of typology of schools and

educational institutions, including furniture and equipment

QCBS Prior Out-13

12.2.1.4.5.2 Auditoria aos processos de obras paralisadas

Audit the cases of

paralyzed works QCBS Prior Ago-13 12.2.1.4.7.1 Monitoria e Acompanhamento da

Introdução da Nova Metodologia de Construção Acelerada de Infra-estruturas Escolares

Monitoring and Tracking of Introduction of New Methodology of

Accelerated Construction of Schools Infrastructure

QCBS Prior Jun-13

12.4.1.3.1.3 Fiscalização das obras de construção da Escola Secundária de Quelimane (Zambézia)

Supervision of

construction works of the

(17)

projecto da Joaquim Marra-

Desenho do projecto of the project Joaquim Marra-Design Project CQS Post Jul-13 12.5.1.3.1.2 Consultoria para a instalação

eléctrica das oficinas da escola Profissional de Macomia (Cabo Delgado)

Consultancy for the wiring of the workshops of the Professional School of Macomia (Cabo Delgado)

CQS Post Mai-13

12.5.1.3.6.2 Consultoria para reabilitação do lar

"3 de Fevereiro de Nampula" Consultancy for the Rehabilitation of the home "3 February Nampula"

QCBS Post Jul-13

12.5.1.3.8.2 Elaboração de projecto

arquitectónico para a construção do Instituto de Ecoturismo de Marrupa

Preparation of architectural project for the construction of the Institute of Ecotourism Marrupa

CQS Post Ago-13

12.5.1.3.8.5 Elaboração de projecto

arquitectónico para a construção do Instituto Agrário de Inhamussua

Preparation of architectural project for the construction of the Agricultural Institute Inhamussua

CQS Post Jul-13

12.5.1.3.8.6 Elaboração de projecto

arquitectónico para a construção da Escola Agraria de Angónia (em substituição da Escola Agraria de Boroma)

Preparation of architectural project for the construction of the School of Angónia Agraria (Agrarian School instead of Boroma)

CQS Post Mai-13

12.5.1.3.6.1 Projecto de desenho de Lar de

Maxaquene architectural project of Lar Maxaquene QCS Post Jun-13 12.1.1.4.9.1 Assistência técnica (Novos

contratos, principalmente DAF, DIPLAC e CEE)

Technical assistance (New contracts, mainly

DAF, and DIPLAC EEC) ICS

Prior /

Post Jun-13 12.1.2.8.4.2 Elaboração do Manual de

procedimentos de Controlo interno (em coordenação com a Inspecção do MINED e IGF)

Preparation of Manual of Internal control

procedures (in coordination with the MINED Inspection and IGF)

ICS Post Jul-13

12.1.2.8.8.3 Auditoria de Procurement (FASE) Audit of Procurement

(FASE) LCS Prior Jun-13 12.1.2.8.8.4 Avaliação financeira e técnica do

programa de construção (2010-2012)

Financial and technical evaluation of the construction program (2010-2012)

QCBS Prior Out-13

12.2.2.9.3.3 Avaliação do programa- ADE Evaluation of the

program-ADE QCBS Post Jul-13 12.5.2.8.4.2 Contratar assistência técnica para

conceber a proposta do Regulamento do RVCC

Hiring technical assistance to design the proposed Regulation of RVCC

(18)

adaptados para Deficiência

Auditiva e Mental adapted for impairment hearing and Mental CQS Post Nov-13 12.1.1.4.10.1. Contratar uma consultoria de curta

duração para a concepção de padrões e indicadores de qualidade

Hiring a sort-term consultancy for the design of standards and quality indicators

CQS Post Jul-13

12.4.2.7.5.5 Avaliação dos livros para o Ensino

Secundário Geral Evaluation of books for the General Secondary

Education CQS Post Jul-13 12.2.2.9.5.4 Realizar campanhas para a

conservação do livro escolar Conduct campaigns to conserve the textbook CQS Post Set-13 12.2.2.11.2.5 Avaliação dos livros do ensino

Bilingue

Evaluation of bilingual

education books CQS Post Jul-13 12.2.2.9.1.10 Avaliação de livros do EP - 1º ciclo Book Review EP - 1st

cycle CQS Post Jun-13 12.2.1.3.1.2 Contratação de 1 provedor

(empresas) de serviço - nível províncial, no âmbito do

desenvolvimento do Programa de 1ª infância – Provincia de Maputo

Hiring of 1 provider (companies) service - provincial level, in the development of the Program of 1st child – Maputo Province

QCBS Prior Jul-13 12.2.1.3.1.2 Contratação de 1 provedor

(empresas) de serviço - nível províncial, no âmbito do

desenvolvimento do Programa de 1ª infância – Provincia de Gaza

Hiring of 1 provider (companies) service - provincial level, in the development of the Program of 1st child – Gaza Province

QCBS Prior Ago-13 12.2.1.3.1.2 Contratação de 1 provedor

(empresas) de serviço - nível províncial, no âmbito do

desenvolvimento do Programa de 1ª infância – Provincia de Tete

Hiring of 1 provider (companies) service - provincial level, in the development of the Program of 1st child – Tete Province

QCBS Prior Out-13 12.2.1.3.1.2 Contratação de 1 provedor

(empresas) de serviço - nível províncial, no âmbito do

desenvolvimento do Programa de 1ª infância – Provincia de Nampula

Hiring of 1 provider (companies) service - provincial level, in the development of the Program of 1st child – Nampula Province

QCBS Prior Ago-13 12.2.1.3.1.2 Contratação de 1 provedor

(empresas) de serviço - nível províncial, no âmbito do

desenvolvimento do Programa de 1ª infância – Provincia de Cabo Delgado

Hiring of 1 provider (companies) service - provincial level, in the development of the Program of 1st child – Cabo Delgado Province

QCBS Prior Ago-13 12.2.1.3.1.3 Contratação de 1 agente de verificação independente, no âmbito do Desenvolvimento do programa de 1ª infância – Provincia de Maputo Hiring of 1 independent verification agent under the Development Program of 1st child – Maputo Province

(19)

verificação independente, no âmbito do Desenvolvimento do programa de 1ª infância – Provincia de Gaza

verification agent under the Development Program of 1st child – Gaza Province QCBS Prior Jul-13 12.2.1.3.1.3 Contratação de 1 agente de verificação independente, no âmbito do Desenvolvimento do programa de 1ª infância – Provincia de Tete Hiring of 1 independent verification agent under the Development Program of 1st child – Tete Province QCBS Prior Jul-13 12.2.1.3.1.3 Contratação de 1 agente de verificação independente, no âmbito do Desenvolvimento do programa de 1ª infância – Provincia de Nampula Hiring of 1 independent verification agent under the Development Program of 1st child – Nampula Province QCBS Prior Jul-13 12.2.1.3.1.3 Contratação de 1 agente de verificação independente, no âmbito do Desenvolvimento do programa de 1ª infância – Provincia de Cabo Delgado

Hiring of 1 independent verification agent under the Development Program of 1st child – Cabo Delgado Province

QCBS Prior Jul-13

12.2.2.10.6.1 Elaboração dos materiais audiovisuais para apoio ao ensino da oralidade, leitura e escrita inicial

Development of audiovisual materials to support the teaching of speaking, reading and initial writing QBS Post Mai-13 12.2.1.3.3.1 Recontratacão de 1 consultor afecto no departamento do Pré-escolar na DINEP Rehiring of 1 consultant assigned to the Preschool department in DINEP

ICS Post Ago-13

12.2.1.3.3.2 Recontratacão de 1 Assistente Administrativo - Secretaria DICIPE afecto no departamento do Pré-escolar na DINEP Rehiring of 1 Administrative Assistant - Secretary DICIPE affection in the department's Preschool in DINEP

ICS Post Jun-13

12.2.1.3.3.3 Contratação de 2 consultores de verificação independente, para nível central, no âmbito do desenvolvimento do programa de 1ª Infância

Hiring two consultants of independent verification, to central level, within the development program of 1st Child

ICS Post Set-13

12.2.1.3.4.2 Realização de estudo de base para a avaliação do impacto do projecto piloto de desenvolvimento integral da criança em idade pré-escolar

Conducting baseline survey to assess the impact of the pilot project of integral development of children in preschool age

CQS Post Jun-13

12.4.2.8.3.2 Capacitar técnicos da DINES na

produção de materiais audiovisuais Train technicians of DINES in production of

(20)

distância em Moçambique com

base na experiência do ISDB technical education in Mozambique based on the experience of the ISDB

QCBS Post Set-13

12.5.2.8.2.1 Continuação do processo de introdução de novas qualificações no II 1º de Maio - Assistência técnica) Continuation of the process of introducing new qualifications at II 1º de Maio – technical assistance) QCBS Prior Jul-13

12.5.2.11.1.1 Realizar um estudo para criação de uma unidade de orientação profissional e de estágios

Conduct a study to create a unit of professional guidance and of the placement

CQS Post Mai-13

12.1.3.11.10.2 Elaboração do Manual de Educação Ambiental

Preparation Manual for

Environmental Education CQS Post Jun-13 12.1.3.11.4.3 Desenvolver instrumentos sobre

situação dos TT nas escolas Develop instruments on the TT situation in schools

CQS Post Jul-13 12.1.3.11.4.4 Sistematizar e desenvolver decreto

sobre programas de Protecção Social no sistema Educativo

Systematize and develop programs decree on Social Protection in the Educational System

CQS Post Ago-13

12.1.3.11.9.3 Contratação de um consultor para criação de um banco de dados

Hiring a consultant to

create a database CQS Post Ago-13 12.3.1.3.1.1 Produzir e emitir na rádio e

televisão spot´s publicitários para a mobilização e sensibilização das estruturas locais e da sociedade civil sobre a importância de ter uma população alfabetizada.

Produce and broadcast radio and television advertising spot's for the mobilization and sensitization of local structures and civil society about the importance of having a literate population.

LCS Post Jul-13

12.3.2.8.2.1 Elaborar instrumentos de escrituração escolar para a Educação de Jovens e Adultos (pós Alfabetização) através de uma oficina com a participação de 20 técnicos durante 5 dias na província de Gaza.

Develop instruments bookkeeping school for the Education of Youth and Adults (post literacy) through a workshop with the participation of 20 technicians for 5 days in Gaza province.

CQS Post Jul-13

12.3.2.8.4.2 Contratar uma empresa para edição e gravação das aulas de Alfa rádio.

Hiring a company for editing and recording of

lessons Alfa radio. CQS Post Jun-13 12.1.1.4.1.1. Elaborar a estratégia de formação/

capacitação de pessoal não docente”

Develop a training strategy / training of

non-teaching staff " CQS Post Nov-13 12.1.1.5.6.10 Contratação de consultoria para o

financiamento do programa 1 PC por professor/dirigente

Hiring consultants for program funding 1 PC

(21)

acompanhamento, monitoria e comunicação do Plano Tecnológico - 1º ano de implementação

follow up, monitoring and communication

Technology Plan - 1st year of implementation

QCBS Post Nov-13

12.1.1.4.6.1 Capacitar profs, técnicos das DPECs e gestores das salas de informáticas em TICs e Desenvolvimento de conteúdos didácticos para sala de aula.

Empower profs, technicians and managers of DPECs computer rooms in ITCs and Development of learning contents for the classroom

QBS Prior Jun-13

12.1.1.3.1.1 Simplificar e automatizar os processos de gestão administrativa ao nível financeiro e gestão de RH

Simplify and automate administrative processes of the financial and HR management levels

CQS Post Jul-13

12.2.2.12.7.1 Contratação de consultoria para o

redimensionamento dos módulos Hiring consultants for resizing modules QCBS Prior Jun-13 12.4.1.4.6.1 Transformação dos conteúdos em

lições interactivas multimédia em 10% para 2014 Transformation of content into interactive multimedia lessons at 10% for 2014 QCBS Prior Out-13 12.4.1.4.2.2 Elaboração e implementação da

estratégia de divulgação Elaboration and implementation of the

dissemination strategy CQS Post Jul-13 12.2.2.12.7.2 Revisão e adequação dos

instrumentos orientadores do curso (guiões, manuais e instrumentos de escrituração).

Review and adjustment of instruments guiding the course (guides, manuals and tools for bookkeeping).

CQS Post Jul-13

12.4.1.4.6.2 Elaboração de módulos do PESD da 8ª,9ª e 10ª classes e seu redimensionamento por ciclos de aprendizagem.

Development of modules PESD of the 8th, 9th and 10th grades and for resizing per learning cycles.

QCBS Prior Ago-13

12.2.2.11.6.2 Contratar 3 consultores nacionais, em coordenação com a DAF, para elaboração de textos de apoio para os professores do Ensino Bilingue.

Hiring three national consultants, in coordination with the DAF to produce texts of support for teachers in Bilingual Education.

ICS Post Set-13

12.2.2.12.2.2 Contratação da Consultoria para avaliação e revisão dos módulos do Novo Currículo dos IFPs

Procurement of Consultancy for assessment and review of the New Curriculum modules IFPs

QCBS Post Jun-13

12.2.2.13.5.2 Assessoria na área de avaliação

do desempenho Assistance in the area of performance evaluation QCBS Prior Ago-13 12.2.2.13.6.1 Realização do Estudo do

(22)

ortográfico comum common spelling

vocabulary QCBS Post Set-13 12.4.2.8.2.2 Elaboração de Programas e

módulos da 9ª e 10ª classes de turismo

Programme Development and modules of the 9th and 10th grades in tourism

CQS Post Ago-13

12.4.2.8.2.5 Avaliação da implementação do currículo do ESG1, incluindo as disciplinas profissionalizantes Evaluation of curriculum implementation of ESG 1, including vocational subjects CQS Post Jun-13 12.2.2.9.1.9 Elaboração de livros do EP - 1º

ciclo Preparation of Books EP - 1st cycle CQS Post Out-13 12.1.2.10.2.3 Edição da revista do INDE Edition of the INDE CQS Post Mai-13 12.2.2.11.6.1 Elaborar textos de apoio de: (1)

oralidade e avaliação da oralidade em L2 no 1º ciclo; (2) A Leitura e Escrita em L2 na 3ª classe; Ciências Naturais em L1 e Matemática em L1

Prepare handouts of: (1) orality and assessment of orality in L2 of the 1st cycle, (2) The Reading and Writing in L2 of 3rd grade; in Natural Sciences in L1 and Mathematics in L1

CQS Post Set-13

12.2.2.12.2.3 Elaboração e Avaliação dos

Módulos do 3º Ano Preparation and Evaluation of Modules of 3rd Year

CQS Post Ago-13 12.5.1.3.3.1-a Projecto de reabilitação e

transformação da escola Industrial de Matundo Project of Rehabilitation and transformation of Escola Industrial de Matundo QCBS Prior Ago-13 12.5.1.3.2.2 Projecto de reabilitação e

ampliação do IIC da Beira Project Rehabilitation and expansion of the IIC da

Beira QCBS Prior Set-13 12.5.3.16.2.1-a Fiscalização da Construção de

Edifício da ANEP Construction Supervision of Building ANEP QCBS Prior Mai-13 12.5.1.3.2.3-e Fiscalização da Reabilitação do IIC

I´bane

Supervision of the

Rehabilitation IIC I'bane CQS Post Ago-13 12.5.1.3.2.4-d Projecto de construção de duas

Oficinas no IICAEG Beloluane Construction project of two workshops in IICAEG Beluluane

CQS Prior Jun-13 12.5.1.3.2.5-d Projecto de construção do Edifício

do Hotel no IIC Pemba Construction project of the Hotel building in Pemba IIC

CQS Prior Jun-13 12.5.1.3.2.3-c Fiscalização do Edifício do Hotel

de IIC Inhambane Supervision of Building Hotel de IIC Inhambane QCBS Post Set-13 12.5.1.3.2.7-d Fiscalização da construção dos

edifícios do Hotel e sanitários do IC Maputo

Supervision of

construction of buildings and sanitary IC Hotel Maputo

QCBS Post Nov-13 12.5.1.3.2.7-d Fiscalização da reabilitação do II

(23)

Edifício do Hotel no IIC de Pemba

(2ª fase) construction of the Hotel building in Pemba IIC (2nd phase)

QCBS Post Jul-13 12.5.1.3.2.4-c Fiscalização da construção de

duas oficinas no IICAEG-Beloluane Supervision of construction of two workshops in IICAEG-Beluluane

QCBS Post Ago-13

Referências

Documentos relacionados

Quando nos referimos a catalogação de partes de plantas a serem utilizadas como medicamento, observamos as especificidades de cada espécie. E neste uso, alguns aspectos

a) Emergencial b) Obrigatório c) Provisório d) Complementar e) Especial 22. Com relação à Lei nº 8.080/1990, que trata dos Recursos Humanos do Sistema Único de

8 pontos para o candidato habilitado, que apresentar além do certificado da graduação para o cargo que se inscreveu, certificado ou certidão de conclusão de mestrado

No estudo que ora apresentamos, em torno de Me llamo Rigoberta Menchú y así me nació la conciencia (1985), narrativa de cunho testemunhal, servir-nos-emos de alguns

Este capítulo trata da modelagem utilizada para analisar e projetar sensores baseados em SMF com trecho afunilado. Será descrita a modelagem utilizada para esses tipos de

Para nível diário incluiu intercepto e 20 diferenças defasadas.. Para diferença diária incluiu 19

RESUMO: Este trabalho teve como cunho pedagógico mostrar para os alunos do 3º Ensino Médio da Escola Estadual Brandão de Amorim, no ano de 2015, a questão da história

Entretanto, destaca-se que a dimensão Trabalho e Espaço Total de Vida não obteve correlação significativa em relação às demais dimensões, diferente do que ocorre nas