• Nenhum resultado encontrado

MRP Parameterization under Lead Time Uncertainties

N/A
N/A
Protected

Academic year: 2023

Share "MRP Parameterization under Lead Time Uncertainties"

Copied!
6
0
0

Texto

Referências

Documentos relacionados

We say that a hydraulic H corresponds to a bankruptcy problem c,E if the following conditions hold • H has n vessels • the volume of the ith vessel is equal to the size of the claim