• Nenhum resultado encontrado

Handle for moving Handle for

moving

18

69

10

600 300

287.5 800

Terminal connections Left Power supply wiring Right Indoor/Outdoor wiring

Service panel Earth terminal

Service panel for charge plug Connection for

liquid pipe FLARE :6.35(1/4F)

Connection for

gas pipe FLARE :12.7(1/2F) Service port

183

440

23

90155

35° 43°

6-:33 drain hole 2-:12 drain hole

7045 400 500

347.4

226

0

43.6 155152 74.3 0

60 118

0

284.3

Less than

<Foundation bolt height>

18mm

100mm or more 500mm or more

2 sides should be open in the right,left and rear side.

*1*2 *1

350mm or more 100mm or more

Basically open

Air discharge

4-10×21 oval hole

Side air intake

Rear air intake

32.540

330300 365

150 500

Installation bolt pitch

FOUNDATION

Unit : mm

Outdoor unit

Outlines and dimensions

2 Outdoor unit

PUHZ-SW75VHA(-BS) Unit : mm

Air Intake

Rear Air Intake Handle for moving Handle for moving

322950

473 943

23

*1 447

*1 431 673

21

Handle for moving Handle for movingService panel

Earth terminal

Left···Power supply wiring Right···Indoor/Outdoor wiring

Terminal Connections Rear piping coverFront piping cover

Side Air Intake Handle for moving

40 54

28 370

19

417

53

5741

600175175

330

Rear Air Intake Air Discharge

Side Air Intake

Installation Feet

2-U Shaped notched holes (Foundation Bolt M10) 2-12% 36 oval holes (Foundation Bolt M10)

30

22014514514530

81 219

71

71 Bottom piping hole (Knockout)

Drain hole (5-:33)

Piping Knockout Hole Details

1955

23 2792

92

4075

73

Right piping hole (Knockout) 63

Right trunking hole (Knockout)

Power supply wiring hole (2-:27Knockout)

:92

27 55

73 23

63

40 92 65

45

Front piping hole (Knockout) Front trunking hole (Knockout)

Power supply wiring hole (2-:27Knockout) 92:

4045 6592

27 55

23 7363

Rear piping hole (Knockout) Rear trunking hole (Knockout)

Power supply wiring hole (2-:27Knockout)

:92

Example of Notes

Refrigerant GAS pipe connection (FLARE):15.88(5/8 inch) Refrigerant LIQUID pipe connection (FLARE):9.52(3/8 inch) *1...Indication of STOP VALVE connection location.

Over

Over Less than Piping and wiring connections can be made from 4 directions: front, right, rear and below

.

4 PIPING-WIRING DIRECTIONS 3 FOUNDA TION BOL TS 2 SER VICE SP ACE 1 FREE SP ACE (Around the unit)

The diagram below shows a basic example. Explanation of particular details is given in the installation manuals etc.

Over10 500

500 Over100

Dimensions of space needed for service access are shown in the below diagram.

Service space

Please secure the unit firmly with 4 foundation (M10) bolts. (Bolts and washers must be purchased locally 30

.) <Foundation bolt height> FOUNDATION over 100mmover 500mm

over 10mm

FREE

over 10mm

Outdoor unit

Outlines and dimensions

2 Outdoor unit

PUHZ-SW100/120VHA(-BS) PUHZ-SW100/120YHA(-BS)

Handle for moving

Side Air Intake Front piping cover Rear piping cover

Air intake

Rear Air Intake Handle for moving Handle for moving

Terminal connection Left···Power supply wiring Right···Indoor/Outdoor wiring

Earth terminal Service panel Handle for moving 1 2

Air Discharge

Rear Air Intake Side Air Intake ····Refrigerant GAS pipe connction (FLARE)W15.88(5/8 inch) ····Refrigerant LIQUID pipe connection (FLARE)W 9.52(3/8 inch) *1 ···Indication of STOP VALVE connection location.

Example of Notes Piping Knockout Hole Details

600175175

330 417

4266

53 56 45

(19) 370 28

2-U Shaped notched holes (Foundation Bolt M10) 2-12 x 36 Oval holes (Foundation Bolt M10)

Installation Feet

30

4540 6592

27 55

23 7363

Rear piping hole (Knockout) Rear trunking hole (Knockout)

Power supply wiring hole (2-W27Knockout)

W92

1955 92

7540

73 63

2327

Right piping hole (Knockout) 92

Right trunking hole (Knockout)

Power supply wiring hole (2-W27Knockout)

W92

92 65

4540

27 55

23 7363

Front piping hole (Knockout) Front trunking hole (Knockout)

Power supply wiring hole (2-W27Knockout) 92W

14514522030145

81 219 71

71

Bottom piping hole (Knockout)

Drain hole (5-W33)

1350

23

950

A

*1 447

*1 431

371 635

322Handle for moving VHA YHA1,079A 930

Over

Over Over

Over

Less than Piping and wiring connections can be made from 4 directions: front, right, rear and below

.

4 PIPING-WIRING DIRECTIONS3 FOUNDATION BOLTS2 SERVICE SPACE1 FREE SPACE (Around the unit)

Please secure the unit firmly with 4 foundation (M10) bolts. (Bolts and washers must be purchased locally .) <Foundation bolt height>

Dimensions of space needed for service access are shown in the below diagram.

The diagram below shows a basic example. Explantion of particular details is given in the installation manuals etc.

30

FOUNDATION10 500

150 500

Service space

FREE

Over 10mm

Over 10mm Over 150mm

Over 1000mm

Unit : mm

Outdoor unit

Outlines and dimensions

2 Outdoor unit

PUHZ-RP200/250YKA

FOUNDATION

30

Service space

150 500

500

10

The diagram below shows a basic example. Explanation of particular details are given in the installation manuals etc.

Dimensions of space needed for service access are shown in the below diagram.

<Foundation bolt height>

Please secure the unit firmly with 4 foundation (M10) bolts. (Bolts and washers must be purchased locally

.)

1 FREE SPACE (Around the unit)2 SERVICE SPACE3 FOUNDATION BOLTS4 PIPING-WIRING DIRECTIONS Piping and wiring connections can be made from 4 directions: FRONT

,Right,Rear and Below.

Less than

Over Over

Over

Over Over 10mmOver 10mm

FREE Over 150mmOver 1000mm

PUHZ-RP200YKA PUHZ-RP250YKA

Model 424450Aconnection

ø9.52(3/8F) ø12.7(1/2F)

···Refrigerant GAS pipe connection (attached JOINT)ø25.4(Brazing locally) ···Refrigerant LIQUID pipe connection (FLARE) *1···Indication of ST OP VALVE connection location. *2···(FLARE)ø 19.05(3/4F)

1 2

2

Example of Notes Piping Knockout Hole Details

Power supply wiring hole (ø27Knockout)

Front piping hole (Knockout) Front trunking hole (Knockout)

Power supply wiring hole (ø40Knockout)

6055

63 73

55 27 26

7592

60 ø92

Power supply wiring hole (ø27Knockout) Right piping hole (Knockout) Right trunking hole (Knockout) Power supply wiring hole (ø40Knockout)

7550

26

63 27 5573 2992

92

60 ø92

Power supply wiring hole (ø27Knockout)

Rear piping hole (Knockout) Rear trunking hole (Knockout)

Power supply wiring hole (ø40Knockout)

75

6055

63 73 26

55 27

60

92

ø92

Drain hole (5-ø33) Bottom piping hole (Knockout)

81 45154 136

110160160160

86

1050Rear Air Intake Air Discharge

Side Air Intake

Installation Feet

2-U Shaped notched holes (Foundation Bolt M10)

2-12×36 Oval holes (Foundation Bolt M10) 370 28

60

30

225225

330

600

19 417

7042

40 53

56 0

Handle for moving

Rear Air Intake Side Air Intake

Handle for moving

632 369 26

1338

Handle for moving Handle for moving

Earth terminal362 Brazing

Service panel

Terminal connection Left···Power supply wiring Right···Indoor/Outdoor wiring

*1,*2 : 442 982 986

*1 A 342

Air intake 2

1 Front piping cover Rear piping cover

Unit : mm

Outdoor unit

Outlines and dimensions

2 Outdoor unit

PUHZ-FRP71VHA

Dimensions of space needed for service access are shown in the below diagram.

Please secure the unit firmly with 4 foundation (M10) bolts. (Bolts and washers must be purchased locally

.)

Piping and wiring connections can be made from 4 directions: Front, right, rear and below

.

4 PIPING-WIRING DIRECTIONS3 FOUNDATION BOLTS2 SERVICE SPACE1 FREE SPACE (Around the unit)

The diagram below shows a basic example. Explantion of particular details are given in the installation manuals etc.

Rear piping hole (Knockout) Rear trunking hole (Knockout)

73 23

55 27

92 65

92 :

Power supply wiring hole (2-:27Knockout)

Front trunking hole (Knockout) Front piping hole (Knockout)

45 6592

40

63 73 23

55 27

92: Right piping hole (Knockout)

Right trunking hole (Knockout)

Power supply wiring hole (2-:27Knockout 1955

23 2792

92

4075

73 63

:92

Piping Knockout Hole Details

3 4

2

1...Refrigerant GAS pipe connection (FLARE) :15.88 (5/8F) *Connect to indoor unit. ...Refrigerant LIQUID pipe connection (FLARE) :9.52 (3/8F *Connect to indoor unit. ...Refrigerant GAS pipe connection (FLARE) :15.88 (5/8F) *Connect to cylinder unit or hydrobox. ...Refrigerant LIQUID pipe connection (FLARE) :9.52 (3/8F *Connect to cylinder unit or hydrobox.

Example of Notes

This tap mark indicates the cylinder/hydro unit connection side for the following parts.  ・Terminal bed for the connecting cables, S1/S2/S3.  ・Stop valves, gas and liquid for the refrigerant connection.BK79F295H01

Air Discharge

Side Air Intake

Rear Air Intake

2-12×36 oval holes (Foundation Bolt M10) 2-U Shaped notched holes (Foundfation Bolt M10)

Installation Feet

417

61 54

53

19 370 28

41424242

175175600

330 30

43

Cylinder/Hydrobox wiringTerminal Connections 1 2Handle for movingService panel

Terminal Connections Left・・・Power supply wiring Right・・Indoor/Outdoor wiring Earth terminal

Handle for moving

950 322

943 473

23 673

429 375 696

Rear piping coverFront piping cover

Over 500mmOver 100mm

FREE

Over 10mmOver 10mm Drain hole 5-:331451451452203081219

Handle for moving

Rear Air Intake

Handle for moving

Air Intake

Side Air Intake

Handle for moving

Over

Over Over

Over

Less than

<Foundation bolt height> 30

FOUNDATION10 500

100 500

Service space

Unit : mm

Outdoor unit

Outlines and dimensions

2 Outdoor unit