• Nenhum resultado encontrado

Mapping rainfall erosivity at a regional scale: a comparison of interpolation methods in the Ebro Basin (NE Spain)

N/A
N/A
Protected

Academic year: 2017

Share "Mapping rainfall erosivity at a regional scale: a comparison of interpolation methods in the Ebro Basin (NE Spain)"

Copied!
14
0
0

Texto

Loading

Imagem

Fig. 1. Location of the study area and the observatories used on this study.
Table 1. Computation of several goodness of fit statistics used on this study.
Fig. 4. Rainfall erosivity maps (average EI 30 index of the erosive events) for the Ebro Basin: (a) inverse distance weighting surface;
Table 4. Accuracy measurements for the EI 30 index models: mean and standard deviation of the observed and predicted values, and cross-validations statistics.
+2

Referências

Documentos relacionados

1) À semelhança do que ocorreu no 1º ciclo, readministrou-se um inquérito por questionário a todos os participantes presentes no primeiro dia de aulas com o objetivo

Thus, this study analyzed the spatial variability of rainfall erosivity in the State of Mato Grosso do Sul, by using interpolation by ordinary kriging... MATERIAL AND METHODS

In Chapter 8, we study the potential effect of addressing energy efficiency in code maintainability. We have found that, while improving energy efficiency, practitioners tend

The objective of the present study was to improve the information on rainfall spatial distribution, rainfall erosivity index (EI 30 ), and rainfall pattern of the state of

The following variables were calculated: rainfall erosivity factor, using the precipitation data; soil erodibility factor, by the correlation between erosivity and soil losses

Os DS que surgem entre os incisivos centrais superiores são chamados de mesiodentes, aqueles presentes na região de molares são os paramolares, os que irrompem

Na análise econométrica de modelos de duração, é bastante comum depararmo- nos com a existência de heterogeneidade negligenciada. Este problema deve-se, em grande parte, ao facto

Os resultados dessa pesquisa mostraram que foi possível identificar precocemente os principais sinais de alertas das incertezas existentes no projeto de