• Nenhum resultado encontrado

An improved MCDM method for maintenance approach selection: A case study of auto industry

N/A
N/A
Protected

Academic year: 2017

Share "An improved MCDM method for maintenance approach selection: A case study of auto industry"

Copied!
10
0
0

Texto

(1)

* Corresponding author. Tel: +0982188872548

E-mail addresses: milad_aghaee1365@yahoo.com (M. Aghaee) © 2012 Growing Science Ltd. All rights reserved. doi: 10.5267/j.msl.2011.09.012 

 

   

Contents lists available atGrowingScience

Management Science Letters

homepage: www.GrowingScience.com/msl

An improved MCDM method for maintenance approach selection: A case study of auto industry

Milad Aghaee and Safar Fazli

Faculty of Social Science, Department of Industrial Management, Imam Khomeini University, Qazvin, Iran A R T I C L E I N F O A B S T R A C T

Article history: Received July 25, 2011 Received in Revised form September, 10, 2011 Accepted 12 September 2011 Available online

18 September 2011

In the current competitive environment, managers have been making attempts to convert organizations under their supervision into competitive and responsive through creating capability of timely delivery of quality products and services. In line with this, maintenance as a system plays an important role in achieving these goals. The maintenance strategy selection is a kind of multiple criteria decision-making (MCDM) problem, which requires considering a large number of complex factors as multiple evaluation criteria. A robust MCDM method should consider the interactions among criteria. The analytic network process (ANP) is a relatively new MCDM method, which can deal with all kinds of interactions systematically. Moreover, the Decision Making Trial and Evaluation Laboratory (DEMATEL) not only can convert the relations between cause and effect of criteria into a visual structural model, but also can be used as a way to handle the inner dependences within a set of criteria. Hence, this paper proposes an effective solution based on a combined ANP and DEMATEL approach to help vehicle companies that need to evaluate and select maintenance strategies.

© 2012 Growing Science Ltd. All rights reserved. Keywords:

Maintenance strategy Multi-criteria decision making Analytic network process (ANP) Decision making trial and evaluation laboratory (DEMATEL)

1. Introduction

(2)

maintenance is changing from a ‘‘necessary evil’’ to a ‘‘profit contributor’’ and towards a ‘‘partner’’ of companies to achieve world-class competitiveness (Waeyenbergh & Pintelon, 2002). Therefore, research on maintenance represents an opportunity for making significant contribution by academics.

Maintenance can be categorized into two different types of corrective and preventive (Li & Khoo, 2006). Corrective maintenance is one which occurs after systems failure, and it covers all actions resulting from failure. Preventive maintenance is the maintenance performed prior to systems failure to retain equipment in specified circumstances (Swanson, 2001). Selection of optimum maintenance strategy is a type of MCDM problem, which can highly influence on the manufacturing expenditures. Because, maintenance plays vital role in keeping availability and reliability levels, product quality, and safety requirements and selection of best maintenance policy is important as the maintenance management is complex and the output of maintenance is hard to measure and quantify (Mechefske & Wang, 2001).

Many conventional MCDM techniques are based on the additive idea along with the independence assumption, but each individual criterion is not often independent (Leung et al., 2003; Shee et al., 2003). To solve the interactions among elements, the analytic network process (ANP) as a relatively new MCDM method was introduced by Saaty (1996). The ANP is a mathematical theory, which deals with all kinds of dependence systematically (Saaty, 2004). The ANP has been successfully implemented in many areas (Agarwal & Shankar, 2002; Chung et al., 2005; Coulter & Sarkis, 2005; Kahraman et al., 2006; Karsak et al., 2003; Lee & Kim, 2001; Meade & Presley, 2002; Niemira & Saaty, 2004; Partovi, 2001; Partovi & Corredoira, 2002; Partovi, 2006; Shang et al., 2004; Tesfamariam & Lindberg, 2005; Yurdakul, 2004). However, the treatments of inner dependences in those ANP works may suffer from some issues, which motivates us to use Decision Making Trial and Evaluation Laboratory (DEMATEL) method (Gabus & Fontela, 1972, 1973; Fontela & Gabus, 1976; Hori & Shimizu, 1999).

On the other hand, there are some researches by different techniques about selection of maintenance strategy (Alnajar & alsyuof, 2003; Martorell et al., 1999; Wang & Hayfield, 1999; Yang et al., 1999; Sharma & Kumar, 2005; Shygith et al, 2008; Bashiri et al, 2011; Mardani, 2010; Wang et al., 2007), but there is no research in the field of maintenance strategy selection with this technique and especially in vehicle industry. As the ANP and the DEMATEL have so many advantages, this paper proposes an effective solution based on an integrated ANP and DEMATEL approach to help vehicle industry companies select a favorable maintenance strategy.

The rest of this paper is organized as follows. In Section 2, a literature review is presented, In Section 3, evaluation methods are presented. In Section 4, an empirical study in vehicle industry is illustrated. Finally, according to the findings of this research, conclusions and suggestions are depicted.

2. Literature review

Six alternative maintenance strategies considered in this paper are introduced as following:

2.1 Corrective maintenance

Corrective, fire-fighting or breakdown maintenance strategy is used when the corrective maintenance strategy is applied until failure occurs (Swanson, 2001; Waeyenbergh & Pintelon, 2002; Mechefske & Wang, 2003). It is considered as a feasible strategy in the events where profit margins are significant (Sharma et al., 2005). However, such a firefighting mode of maintenance often causes destruction on related facilities, personnel and environment.

2.2 Time-based preventive maintenance

(3)

M. Aghaee and S. Fazli / Management Science Letters 2 (2012) 

  139

maintenance. For performing time-based preventive maintenance, we need to have a decision support system and it is often difficult to define the most effective maintenance intervals (Mann et al, 1995). There are, however, many cases when time-based maintenance strategies are implemented and most machines are maintained with a substantial amount of useful life remaining (Mechefske & Wang, 2003).

2.3 Condition-based maintenance

Maintenance decision normally depends on the measured information from a set of sensors system when using the condition-based maintenance strategy. There are literally various techniques are available, such as vibration monitoring, lubricating analysis, and ultrasonic testing. The monitored data of equipment parameters could tell engineers whether the situation is normal, allowing the maintenance employee to use necessary maintenance before failure occurs. This maintenance strategy is normally designed for rotating machines, e.g. turbines, centrifugal pumps and compressors. However, limitations in data coverage and quality reduce the effectiveness and accuracy of the condition-based maintenance strategy (Al-Najjar & Alsyouf, 2003).

2.4 Predictive maintenance

Predictive maintenance often refers to the same maintenance strategy with condition-based maintenance (Sharma et al., 2005; Mobley, 2002). In this paper, considering the recent development of fault prognosis techniques (Bengtsson, 2004; Byington et al, 2002), predictive maintenance is used to represent the maintenance strategy that is able to forecast the temporary trend of performance degradation and predict faults of machines by analyzing the monitored parameters data. Fault prognostics is a young technique employed by maintenance management, which gives maintenance engineers the possibility to plan maintenance based on the time of future failure and coincidence maintenance activities with production plans, customers’ orders and personnel availability. Recently, the intelligent maintenance system was described by Djurdjanovic et al (2003), focusing on fault prognostic techniques and aiming to achieve near-zero-downtime performance of equipment.

2.5 Total productive maintenance (TPM)

TPM defined by Nakajima (1988) incorporates a company-wide technique to plant, equipment or asset care, which involves the active participation from top management to workers on the floor to reach equipment effectiveness by removing the six big losses such as downtime losses, set-up and adjustments losses; speed losses; reduced speed; defect losses and reduced yield. In TPM, the practice of PM is integrated with the idea of total quality through employee involvement (TQEI). Operators maintain their own machines by practicing 5S principles. They compile and interpret maintenance and operating data of their machines that helps to identify signs of deterioration, if any. Routine daily maintenance checks, minor adjustments, lubrication, and minor part changes are the activities performed by the operators. TPM seeks to improve the overall equipment effectiveness (OEE), which is an important indicator, used to measure TPM. An overall 85 percent of OEE is considered as world class and a benchmark for others (Blanchard, 1997; McKone et al., 1999; Chand and Shirvani, 2000).

3. Evaluation method

In this section, some essentials of the ANP and the DEMATEL are briefly explained.

3.1. The ANP

(4)

analytic hierarchy process (AHP). However, these methods do not deal with the interdependences among elements. For dealing with the interdependences among elements, the ANP as a new MCDM method was proposed by Saaty(1996).

Saaty (1999) has demonstrated several kinds of ANP models, such as the Hamburger Model, the Car Purchase BCR model, and the National Missile Defense model. However, from the viewpoint of Kinosita (2003), the ANP may simply be differentiated into two practical kinds of models: the Feedback System model and the Series System model (similar to the AHP model). In the Feedback System model, clusters link one by one in turn as a network system. This kind of model can capture effectively the complex effects of interplay in human society, especially when risk and uncertainty are involved (Saaty, 2003). However, it is usually hard to obviate the possibility of interactions within the criteria cluster. Thus, this paper suggests a modified Feedback System model (Fig. 1) that allows inner dependences within the criteria cluster, in which the looped arc signifies the inner dependences.

Fig.1. Feedback system model

In order to determine the relative importance between elements, decision makers are asked to respond through a series of pair-wise comparisons. These pair-wise comparisons are based on the Saaty’s nine-point scale ranging from 1 (equal) to 9 (extreme). For evaluating the weights of elements, the AHP uses the principal eigenvector of comparison matrix, whereas the ANP employs the limiting process method of the powers of the super-matrix (Sekitani & Takahashi, 2001). For synthesizing overall priorities for the alternatives, it requires adjusting the un-weighted super-matrix to keep it to be column stochastic (Sarkis, 1999). Then, the weighted super-matrix (the adjusted un-weighted super-matrix) can be raised to limit powers to calculate the overall priorities. However, before forming the un-weighted super-matrix, the treatment of inner dependences needs to employ the DEMATEL. The treatment of inner dependences can theoretically use the ANP, but another alternative is to use the DEMATEL.

3.2. The DEMATEL

The Battelle Memorial Institute conducted a DEMATEL method project through its Geneva Research Centre (Gabus & Fontela, 1972, 1973). DEMATEL has become popular in many countries such as Japan since it is a comprehensive technique for creating and analyzing a structural model involving causal relationships among complex factors.

The DEMATEL is based on digraphs, which can separate involved factors into cause group and effect group. In order to apply the DEMATEL smoothly, this paper refines the version used by Fontela and Gabus (1976) and proposes four main steps as below.

Step 1: Generating the direct-relation matrix by measuring the relationship between criteria in four levels: 0 (no influence), 1 (very low influence), 2 (low influence), 3 (very high influence) and 4 (very high influence). Next, experts make sets of the pair-wise comparisons in terms of influence and direction between criteria. Then, as the result of these evaluations, the initial information can be

prepared as the direct-relation matrix, which is an n×n matrix A, in which aij is denoted as the degree

to which the criterion i affects the criterion j.

Step 2: Normalizing the direct-relation matrix. On the base of the direct-relation matrix A, the normalized direct-relation matrix X can be obtained as follows,

Purposes

(5)

M. Aghaee and S. Fazli / Management Science Letters 2 (2012) 

  141

.

X =k A  (1)

1

1

, , 1, , .

1

max

i n

k i j n

n

j

a

ij

≤ ≤

= =

=

"  

(2)

Step 3: Attaining the total-relation matrix. Once the normalized direct-relation matrix X is obtained, the total relation matrix T is calculated as follows,

1

( ) ,

T=X IX −   (3)

where I is identity matrix.

Step 5: Set a threshold value and obtain the network relationship map (NRM). In order to explain the structural relation among the criteria and keep the complexity of the system to a manageable level at the same time, it is necessary to set a threshold value p to filter out some negligible effects in matrix T. Only some criteria, whose effect in matrix T is greater than the threshold value, should be chosen and shown in a network relationship map (NRM) for influence (Tzeng et al., 2007).In this paper, experts decided the threshold value is arithmetic mean of T matrix numbers.

4. Empirical study and discussion

In this section, an empirical study in vehicle industry is presented to illustrate the application of the proposed solution for evaluating and selecting optimized maintenance strategy. A committee with 10 experts followed the proposed solution with the four-phase procedure. First, they defined the decision goal for selecting a favorable maintenance system strategy. In phase 2, after conducting the literature review and a profound discussion, three evaluation clusters were used to select an optimized maintenance system strategy. Specifically, the ‘‘Purposes’’ cluster involved one purpose of optimized maintenance strategy (P); the ‘‘Criteria’’ cluster contained four criteria: security requirements (C1), cost requirements (C2), strategic requirements (C3) and technical requirements (C4); and the ‘‘Alternatives’’ cluster comprised six maintenance system strategies: CM (A1), PM (A2), TPM (A3), RCM (A4), CBM (A5) and PDM (A6). In phase 3, the Feedback System model was used (Fig. 1), and then the decision structure (Fig. 2) was shaped for evaluating optimized maintenance system strategies, in which looped arcs indicate that inner dependences are to be handled by the DEMATEL.

Fig.2. decision structure for the optimized maintenance system strategy

In phase 4, for obtaining the relative influence between elements, the members of committee were asked to respond through a series of pair-wise comparisons. In order to aggregate their assessments,

Purpose (P)

C1 C2 C3 C4

(6)

relation matrix (Table 1) can be obtained, hereby the inner dependence matrix (Table 2) can be acquired by using the DEMATEL, and the un-weighted super matrix can be formed as shown in Table 3. The calculations of the super-matrix can be easily solved by using the professional software named ‘‘Super Decisions’’, and then the overall priorities were obtained from the limit super-matrix (see Table 4): WC= (C1, C2, C3, C4) = (0.000, 0.227, 0.092, 0.180), WA = (A1, A2, A3, A4, A5, A6) = (0.043, 0.080, 0.125, 0.110, 0.065, 0.074).

Therefore, the most important criterion was C2 (Top management support) due to the highest priority of 0.227; and the desired alternative was Strategy A3 (Personalization strategy) due to the highest priority of 0.125.

Table 1

Direct- relationship matrix

C1 C2 C3 C4

C1 0 0.395 0.385 0.220

C2 0.240 0 0.266 0.294

C3 0.208 0.330 0 0.240

C4 0.120 0.266 0.218 0

Table 2

The inner dependence matrix

C1 C2 C3 C4

C1 0.734 1.734 1.280 1.100

C2 0.791 0.913 1.028 0.983

C3 0.762 1.145 0.802 0.937

C4 0.585 0.927 0.820 0.598

Table 3

The un-weighted super matrix

A1 A2 A3 A4 A5 A6 C1 C2 C3 C4 Selection

A1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.10814 0.10721 0.06861 0.07157 0.00000 A2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.19351 0.16938 0.13210 0.16668 0.00000 A3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.21791 0.25791 0.21722 0.25796 0.00000 A4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.22093 0.21305 0.24151 0.12816 0.00000 A5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.12626 0.12085 0.15771 0.15276 0.00000 A6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.13682 0.13160 0.18285 0.00000 0.00000 C1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000 0.00000 0.00000 1.00000 0.49583 C2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.21710 0.00000 0.50323 0.00000 0.11658 C3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.37259 0.40476 0.00000 0.00000 0.17522 C4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.41031 0.59524 0.49677 0.00000 0.21237 Selection 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000 0.00000 0.00000 0.00000 0.00000

Table 4

The limit matrix

A1 A2 A3 A4 A5 A6 C1 C2 C3 C4 Selection

A1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.04361 0.04361 0.04361 0.04361 0.04361

A2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.08077 0.08077 0.08077 0.08077 0.08077

A3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.12522 0.12522 0.12522 0.12522 0.12522

A4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.11092 0.11092 0.11092 0.11092 0.11092

A5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.06514 0.06514 0.06514 0.06514 0.00000

A6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.07434 0.07434 0.07434 0.07434 0.00000

C1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000 0.00000 0.00000 0.00000 0.49583

C2 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.22716 0.22716 0.22716 0.22716 0.11658

C3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.09195 0.09195 0.18089 0.18089 0.17522

C4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.18089 0.18089 0.00000 0.00000 0.21237

Selection 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000 0.00000 0.00000 0.00000 0.00000

(7)

M. Aghaee and S. Fazli / Management Science Letters 2 (2012) 

  143

existing organizational cultures. In this sense, selecting a maintenance system strategy is an MCDM problem. There are many works associated with maintenance system strategy provided valuable advices ranging from essential factors for a successful maintenance system strategy to the main obstacles of maintenance system strategy implementation. However, few works provided methods, which can evaluate and model the maintenance system strategy involved with several complex factors, systematically. Hence, this paper proposes an effective solution, which could help find suitable maintenance system strategy. As a test case, four biggest Iranian Vehicle Companies used for the proposed solution to logically deal with the complicated selection problem and provide a unique maintenance system strategy.

In order to realize the reason of the result of this maintenance system strategy selection and the usefulness of the proposed solution, this paper conducted a post-survey discussion with the maintenance system strategy committee of case companies. The discussion results are summarized as follows.

First, the committee chose C2 (cost) to be the most important criterion among a set of criteria. This choice is in a sense because ‘‘Top management support’’ is critical to all kinds of maintenance activities, not just maintenance strategy. Secondly, although many works on maintenance system strategy has suggested different strategies as the best, the committee chose A3 (TPM) to be the desired Maintenance System Strategy. The ranking of the strategies is as bellow: TPM, RCM, PM, PDM, CBM and CM.

5. Conclusions

As maintenance management is taking on an important strategic role, numerous companies are expecting their maintenance to be performed effectively in order to leverage and transform the maintenance into competitive advantages. More importantly, the successful maintenance management starts with a proper maintenance system strategy produced through a robust evaluation method. However, the maintenance strategy selection is a kind of MCDM problem, which requires considering a large number of complex factors as multiple evaluation criteria. Although numerous creditable works are devoted to the study of how to build a maintenance strategy and to execute it successfully, few of those have provided methods, which can systematically evaluate and model complex factors of the maintenance strategy.

To deal with the MCDM problem of this maintenance strategy selection, it is better to employ MCDM methods for reaching an effective solution. The ANP is a relatively new MCDM method, which can deal with all kinds of interactions systematically, unlike traditional MCDM methods, which are based on the independence assumption. Hence, this paper proposed a solution based on a combined ANP and DEMATEL approach to help companies evaluate and select maintenance strategies.

(8)

Al-Najjar, B., & Alsyouf. I. (2003). Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. International Journal of Production Economics, 84, 85–100. Agarwal. A., & Shankar, R. (2002). Analyzing alternatives for improvement in supply chain

performance. Work Study, 51(1), 32–38.

Bashiri. M., Badri. H., Hejazi. T.H. (2011). Selecting optimum maintenance strategy by FUZZY interactive linear assignment method. Applied mathematical modeling, 35, 152-164.

Bengtsson, M. (2004). Condition based maintenance system technology-where is development heading?, Proceedings of the 17th European Maintenance Congress, Barcelona, Spain, May, 11– 13.

Bevilacqua. M, & Braglia, M. (2000). The analytic hierarchy process applied to maintenance strategy selection. Reliability Engineering and System Safety, 70, 71–83.

Blanchard, S.B (1997). An enhanced approach for implementation and total productive maintenance in manufacturing environment. Journal of Quality in Maintenance Engineering, 3(2), 69-80. Byington. C., Roemer. M.J., & Galie, T. (2002). Prognostic enhancements to diagnostic systems for

improved condition- based maintenance, Proceedings of IEEE Aerospace Conference, 6, Big Sky, USA, March 9–16, 2815–2824.

Chand. G., & Shirvani, B. (2000). Implementation of TPM in cellular manufacturing. Journal of Material Processing Technology, 103, 149-54.

Chung. S. H., Lee. A. H. I., & Pearn, W. L. (2005). Analytic network process (ANP) approach for product mix planning in semiconductor fabricator. International Journal of Production Economics, 96(1), 15–36.

Coulter. K, & Sarkis. J. (2005). Development of a media selection model using the analytic network process. International Journal of Advertising, 24(2), 193–216.

Djurdjanovic, D., Lee, J., & Ni, J. (2003). Watchdog agenda infotronics based prognostics approach

for product performance assessment and prediction. International Journal of Advanced

Engineering Informatics, 17, 109–125.

Fontela. E., & Gabus. A. (1976). The DEMATEL observer, DEMATEL 1976 Report, Switzerland Geneva: Battelle Geneva Research Center.

Gabus, A., & Fontela, E. (1972). World problems and invitation to further thought within the framework of DEMATEL, Switzerland Geneva: Battelle Geneva Research Centre.

Gabus, A., & Fontela, E. (1973). Perceptions of the World problematic: Communication procedure, communicating with those bearing collective responsibility (DEMATEL Report No. 1). Switzerland Geneva: Battelle Geneva Research Centre.

Hori. S., & Shimizu, Y. (1999). Designing methods of human interface for supervisory control systems, Control Engineering Practice, 7(11), 1413–1419.

Kahraman. C., Ertay, T., & Buyukozkan, G. (2006). A fuzzy optimization model for QFD planning process using analytic network approach. European Journal of Operational Research, 171(2), 390–411.

Karsak, E.E., & Tolga, E. (2001). Fuzzy multi-criteria decision making procedure for evaluating advanced manufacturing system investments. International Journal of Production Economics, 69, 49–64.

Karsak. E. E., Sozer, S., & Alptekin, S. E. (2003). Product planning in quality function deployment using a combined analytic network process and goal programming approach. Computers and Industrial Engineering. 44(1), 171–190.

Kinosita. E. (2003). From AHP to ANP. Operations Research of Japan, 48(9), 677–683.

Kumar, D., & Kumar, P. (2005). FLM to select suitable maintenance strategy in process industries using MISO model. Journal of Quality in Maintenance Engineering, 11(4), 359-374.

(9)

M. Aghaee and S. Fazli / Management Science Letters 2 (2012) 

  145

Leung. L. C., Hui, Y. V., & Zheng, M. (2003). Analysis of compatibility between interdependent matrices in ANP. Journal of the Operational Research Society, 54(7), 758–768.

Li, J.R., Khoo, L.P., & Tor, S.B. (2006). Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph. International Journal of Production Economics, 102, 51–65.

Mann. L., Saxena, A., & Knapp, G.M. (1995). Statistical-based or condition-based preventive

maintenance. Journal of Qualityin Maintenance Engineering, 1(1), 46–59.

Mardani. N. (2010). Selecting suitable maintenance strategy by using FUZZY method (case study: Isfahan Siman Sepahan), MA thesis, Alammeh Tabatabaie university, Tehran.

McKone. K., Schroeder, R., & Kristy, C. (1999). Total productive maintenance: a contextual view. Journal of Operations Management, 17, 123-44.

Meade. L. M., & Presley, A. (2002). R&D project selection using the analytic network process. IEEE Transactions on Engineering Management, 49(1), 59–66.

Mechefske, C.K., & Wang, Z. (2001).Using fuzzy linguistics to select optimum maintenance and condition monitoring strategies. Mechanical System and Signal Processing, 15(6), 1129-1140. Mechefske. C.K., & Wang, Z. (2003). Using fuzzy linguistics to select optimum maintenance and

condition monitoring strategies. Mechanical Systems and Signal Processing, 17(2), 305–316.

Mobley, R.K. (2002). An Introduction to Predictive Maintenance. 2nd ed., Elsevier Science, New

York.

Martorell, S., Sanchez, A., & Serradell, V. (1999). Age-dependent reliability model considering effects of maintenance and working conditions. Reliability Engineering and System Safety, 64, 19– 31.

Nakajima. S (1988). Introduction to Total Productive Maintenance (TPM). Productivity Press, Cambridge, MA.

Niemira, M. P., & Saaty, T. L. (2004). An analytic network process model for financial-crisis forecasting. International Journal of Forecasting, 20(4), 573–587.

Partovi, F. Y. (2001). An analytic model to quantify strategic service vision. International Journal of Service Industry Management, 12(5), 476–500.

Partovi, F. Y., & Corredoira, R. A. (2002). Quality function deployment for the good of soccer. European Journal of Operational Research, 137(3), 642–656.

Partovi, F. Y. (2006). An analytic model for locating facilities strategically. Omega, 34(1), 41–55. Saaty, T. L. (1996). The analytic network process-decision making with dependence and feedback.

Pittsburgh, PA: RWS Publications.

Saaty, T. L. (1999). Fundamentals of the analytic network process. The International Symposium on the Analytic Hierarchy Process, Kobe, Japan.

Saaty, R. W. (2003). The analytic hierarchy process (AHP) for decision making and the analytic network process (ANP) for decision making with dependence and feedback. Creative Decisions Foundation.

Saaty, T. L. (2004). The analytic network process: Dependence and feedback in decision making (Part 1): Theory and validation examples, SESSION 4B: Theory and development of the analytic hierarchy process/analytic network process, In The 17th International Conference on Multiple Criteria Decision Making, August 6-11, 2004 at The Whistler Conference Centre, Whistler, British Columbia, Canada.

Sarkis, J. (1999). A methodological framework for evaluating environmentally conscious manufacturing programs. Computers and Industrial Engineering, 36(4), 793–810.

Sekitani, K., & Takahashi, I. (2001). A unified model and analysis for AHP and ANP. Journal of the Operations Research Society of Japan, 44(1), 67–89.

(10)

process industries using MISO model. Journal of Quality in Maintenance Engineering, 11(4), 359–374.

Shygith, K., Ilangkumaran, M., & Kumanan, S. (2008). Multi-criteria decision making approach to evaluate optimum maintenance strategy in textile industry. Journal of Quality in Maintenance Engineering, 14(4), 375-386.

Swanson, L. (2001). Linking maintenance strategies to performance. International Journal of Production Economics, 70, 237–244.

Tesfamariam, D., & Lindberg, B. (2005). Aggregate analysis of manufacturing systems using system dynamics and ANP. Computers and Industrial Engineering, 49(1), 98–117.

Waeyenbergh, G., Pintelon, L. (2002). A framework for maintenance concept development, International Journal of Production Economics, 77, 299–313.

Wang, Y., & Hayfield, M. (1999). Rolling contact fatigue failure modes of lubricated silicon nitride in relation to ring crack defects. Wear, 225–229 (2), 1284–1292.

Wang, Y.J., & Lee, H.S. (2007). Generalizing TOPSIS for fuzzy multiple-criteria group decision-making. Computers and Mathematics with Applications, 53, 1762–1772.

Yang, Y., Kurfess, T., Liang, S., & Danyluk, S. (1999). Application of a specialized capacitance probe in bearing diagnosis, Wear, 225 (2), 1215–1221.

Referências

Documentos relacionados

The proposed study implemented decision making trial and evaluation laboratory (DEMATEL) and analytic network process (ANP), respectively to measure the casual relationship

In this paper we deal with one of the airline companies’ problems, selecting aircraft to purchase, using one of multi criteria-decision making techniques, Analytic Network

Multi-criteria decision making (MCDM) methods, such as AHP and Fuzzy AHP, which are used for mining method selection problems in the literature, make the evaluations using the

Os problemas identifi cados sobre a captura de tartarugas marinhas em São Tomé e Príncipe são principalmente: a captura por pessoas que estão vinculadas por uma tradição cultural;

There are few applications of Multiple-criteria decision-making (MCDM) in total quality management (TQM) context problems in the literature, for instance: a multi-criteria

To propose a distinctive and positive element in the decision-making process, this study examined empirically how the AHP method ( Analytic Hierarchic Process )

In this regard the application of the MOORA method is recommended for making decisions in a supply chain for the selection of best alternative from a number of alternatives..

Cite this article as: Velmurugan and Selvamuthukumar: The analytic network process for the pharmaceutical sector: Multi criteria decision making to select the suitable method for