Main Stakeholder Consultation Report

Clean Development Mechanism

1. Title of the CDM Project Activity

AVG Waste Gas Electricity Generation Project

Public Consultation Period: from August, 3rd 2009 to August 13th 2009

Language used in the Public Consultation: Portuguese / English

Project Proponent: AVG Siderurgia Ltda.

Rod. BR-040 km 468 – Sete Lagoas, MG Brazil

Consultancy Company:

MundusCarbo Soluções Ambientais e Projetos de Carbono Ltda.

R. Sebastião Fabiano Dias, 210 – sala 1102 – Belvedere – Belo Horizonte, MG Brazil

1. Invitation Procedure:

According to the Gold Standard Foundation guidelines for stakeholder’s consultation in CDM project activities, civil and governmental entities involved in the Initial Stakeholder Consultation were again contacted through e-mail for a new round of comments collection about the project. Additionally, international NGO’s that support The Gold Standard Foundation were also invited to send comments as well as the Gold Standard Latin American representative and its secretariat in Switzerland. The following documents were sent along with the invitation e-mail:

- Project Design Document - Version 3, in Portuguese and English; - Gold Standard Passport, also in Portuguese and English;

(2)

Rua Sebastião Fabiano Dias, 210 – Sala 1102 | Belvedere | BH | MG | Brasil | www.munduscarbo.com | +55 31 2535-1235

Environmental Solutions | Carbon Projects

- Non-Technichal Summary in Portuguese, containing updated information about the Project.

The content of the e-mail sent to stakeholders is reported below:

“Dear Gentleman/Madam,

This e-mail is being sent as part of Main Stakeholder Consultation of the "AVG Waste Gas Eletricity Generation Project - Sete Lagoas, Minas Gerais, Brasil", as requirements of the Gold Standard Foundation.

The attached documents were updated along the Validation process, which is being conducted by Bureau Veritas (BV) Certification Company.

Any additional comment you might have in respect of this project, it will be of interest for us to register and analyze it. This consultation will be open until August 13th 2009.

Please contact us by phone (number below) or in response to this e-mail if you have any further question.

Best regards,

MundusCarbo Environmental Solutions & Carbon Projects Phone: +55 31 2535-1235”

A MundusCarbo representative was prepared to receive and respond to additional comments or any other questions that could be forwarded concerning the proposed project.

Table 1 below shows the entities involved on Main Stakeholder Consultation:

Table 1: Invited Entities to Main Stakeholder Consultation

Nome Responsável E-mail Endereçado a:

1 Sete Lagoas Municipality

Leone Maciel Fonseca – Mayor prefeito@setelagoas.mg.gov.br Leone Maciel Fonseca

2 Sete Lagoas Legislative Chamber

Gilmar Antão – President comunicacao@camarasete.mg.gov.br Comunication Sector of Sete Lagoas Legislative Chamber

3 Sete Lagoas Environmental Department

Ênio Eduardo da Silva – Secretary Elizabeth Regina – Advisor

semmasetelagoas@gmail.com Ênio Eduardo da Silva

4 State Foundation for Environment – FEAM / SEMAD

Zuleika Torquetti – Environmental Quality Director

Antônio Malard – Audit Manager Elisete Gomide Dutra – Air Quality Coordinator

zuleika.torquetti@meioambiente.mg.gov.br elisete.gomides@meioambiente.mg.gov.br

Zuleika Torquetti Elisete Gomide Dutra

(3)

NGOs and Social Movements for the Environment and Sustainable Development

Manager

6 State Prosecutor Alceu Torres – General Attorney alceutorres@mp.mg.gov.br Alceu Torres 7 Federal Prosecutor Federal Attorney for the

Environment

4camara@pgr.mpf.gov.br 4th Chamber – Environment

and Cultural Heritage of the Federal Prosecutor 8 Gold Standard

Foundation

Gold Standard Foundation Secretariat

info@cdmgoldstandard.org Gold Standard Foundation

Secretariat 9 Gold Standard

Foundation Representative in Latin America

Mauro Fadda mauro@cdmgoldstandard.org Mauro Fadda

10 Engineers

Association of Sete Lagoas

Luciano Mascarenhas Barrios – President

ase@ase.org.br Engineers Association of

Sete Lagoas (General)

11 Commercial and Industrial

Association of Sete Lagoas

Francisco José L’Abbate Neto – President

acisel@acisel.com.br Commercial and Industrial

Association of Sete Lagoas (General)

12 Industrial

Association of the State of Minas Gerais – FIEMG

Wagner Soares Costa – Environmental Manager

costaw@fiemg.com.br Wagner Soares Costa

13 Association of Pig Iron Producers – SINDIFER

Paulino Cícero de Vasconcelos – President

sindifer@sindifer.com.br Paulino Cícero de

Vasconcelos

14 Association of the Mineral Industries of Minas Gerais – SINDIEXTRA

José Fernando Coura – President sindiextra@fiemg.com.br José Fernando Coura

15 COPAM Counselors on the Velhas River Basin Regional Office

Shelley de Souza Carneiro – Presidente

jmayrink@uai.com.br José Flávio Mayrink

(COPAM – URC Velhas Superintendent)

16 NGO Olhos D’Agua Institute

Ieda Dias Campelo – President iedacampelo@hotmail.com Ieda Dias Campelo

17 NGO Terra Viva Institute

Ricardo Terra – Presidente ricardo@iterraviva.org.br Ricardo Terra

18 NGO WWF Brasil Álvaro de Souza – Board President of WWF Brasil

elizabeth@wwf.org.br Elizabeth (Director

(4)

Rua Sebastião Fabiano Dias, 210 – Sala 1102 | Belvedere | BH | MG | Brasil | www.munduscarbo.com | +55 31 2535-1235

Environmental Solutions | Carbon Projects

19 NGO Greenpeace Brasil

Marcelo Furtado – Executive Director of Greenpeace in Brazil

mfurtado@dialb.greenpeace.org Marcelo Furtado

20 Community Members

Wanderson Antônio Ferreira da Silva

Waimer Fonseca Nascimento

www.wandersonferreira1500@hotmail.com.br waimerfn@yahoo.com.br Wanderson Antônio Ferreira da Silva Waimer Fonseca Nascimento 21 State Forestry Institute - IEF

João Alfredo Balieiro jab@ief.mg.gov.br João Alfredo Balieiro

22 Promove College Students

Maria Reginalda Marques da Silva Luís Cláudio Octaviano de Alvarenga

Theikeanny Fontes Pantaleão Ronan Pereira Alves

Gisele Silva Santana

naldinhabarrominas@yahoo.com.br luizclaudioalvarenga@hotmail.com theikeanny@oi.com.br

rpalvess@yahoo.com.br giselesl@bol.com.br

Maria Reginalda Marques da Silva

Luís Cláudio Octaviano de Alvarenga

Theikeanny Fontes Pantaleão Ronan Pereira Alves

Gisele Silva Santana 23 Teacher of

University Center of Sete Lagoas

Daniela Almeida R. Torres raposo@unifemm.edu.br Daniela Almeida R. Torres

24 Regional

Superintendent of Environment – Alto São Francisco

Aline Faria Souza Trindade aline.trindade@semad.mg.gov.br Aline Faria Souza Trindade

25 Laundry Ciprioni (local enterprise)

George Marlon C. Machado georgecipriani@bol.com.br George Marlon C.

Machado

1. Public Consultation Procedure:

The Main Stakeholder Consultation started on August, 3rd 2009 when the invitation mails were sent to entities listed above. MundusCarbo staff waited comments from stakeholders through e-mail or telephone, until August, 13th 2009.

2. Summary of comments received

The Federal Prosecutor – Attorney's Office in Minas Gerais – sent a letter requesting detailed information about the Project. In response, MundusCarbo staff came into contact with de Local Prosecutor in order to schedule a face meeting in which information would be given. The Prosecutor

(5)

opted not to perform the face meeting and

press and electronic versions, to be forwarded to the representative of Sete Lagoas Municipality. So, in addition to

following documents were also delivered:

- Information about the Initial Stakeholder Consultation local newspaper, non-technical summary and Consulta - Other Project-Related Documents

Construction and related conditions, and Agency of Electric Energy - ANEEL

- Information about the goals of projects in such institution.

Besides the above request, made by Federal Prosecutors, stakeholders were received until the

will remain available to receive any further comments beyond the deadline and questions related to this project activity.

João Marcelo Horta Mendes

Administrative and Quality Management +55 31 2535-1235 / +55 31 9185

joao@munduscarbo.com

face meeting and requested that the documentation to be forwarded to the representative of . So, in addition to the documentation previously

also delivered:

Stakeholder Consultation process (copies of technical summary and Consultation Report);

Related Documents (Environmental License for the related conditions, and the Thermoelectric Registration

ANEEL);

the Gold Standard Foundation and information about the

Besides the above request, made by Federal Prosecutors, no additional comments from until the date of completion of this Report. However,

available to receive any further comments beyond the deadline and roject activity.

Management 1235 / +55 31 9185-8476

that the documentation be formally delivered in to be forwarded to the representative of the Federal Prosecutor in previously delivered by e-mail, the

copies of invitation published in

for the Thermoelectric Plant Registration Letter from the National

Foundation and information about the registered

additional comments from However, MundusCarbo staff available to receive any further comments beyond the deadline and to answer any other

Referências

Documentos relacionados

Todo este processo nos levou a reconhecer no esforço actual e internacional de construção da escola inclusiva, enquanto “Escola para todos”, como um processo -

Selected models presented root mean square error of prediction (RMSEP) in the same order of previous studies with Mandarin orange (Cayuela and Weiland, 2010; Gómez et al., 2006;

TRABALHADAS DE CAMINHÃO CARGA SECA C/CARROCERIA ALONGADA E CABINE SUPLEMENTAR APARECIDO ALMEIDA DA SILVA-ME 055/2015 LOCAÇÃO DE HORAS TRABALHADAS DE CAMINHÃO CARGA SECA

O objeto desse estudo foi realizar uma intervenção de educação nutricional com pré-escolares, frequentadores de uma Escola Municipal de Educação Infantil, da

As esco l as indígenas no Ceará, especialmente nos Pitaguary, s ur- gem diante de um contexto de afirmação dos grupos étn i cos, como uma estratégia políLica para o

Espectros corrigidos da intensidade de emissão de fluorescência normalizado no máximo de emissão do monómero do iodeto de 3,3´-di-hexilselenocarbocianina, adsorvido em celulose

Quanto a Pa- nofsky, e apesar de este não se debruçar objetivamente numa análise sobre o ato foto- gráfico, podemos analisar uma opinião similar no que respeita à representação e

CONCLUSÕES A ferramenta utilizada para o estudo da superfície potenciométrica da Formação Rio Claro foi a geofísica, através da técnica de sondagem elétrica vertical, que