LiderA
Sustainable Management
Gestão para a sustentabilidade
Manuel Duarte
Manuel Duarte Pinheiro Ph.D., Engº do Ambiente
Pinheiro www.lidera.info
Ph.D., Eng do Ambiente (DECivil Gab 3.42)
[email protected] ou [email protected]
LiderA Sustainable Management
1. Procura para gerir a dimensão ambiental / Search Management System
2. Desafio a diferentes níveis / Challenge at several levels
3. Gerir Sustentável \ Sustainable Management \ g
4. Aproximação nas várias fases do ciclo de vida / life cycle approach
Manuel Duarte
4. Aproximação nas várias fases do ciclo de vida / life cycle approach
5 Concluindo / Conclusions
Pinheiro www.lidera.info
5. Concluindo / Conclusions
LiderA
Search Management System
System
Procura de Gestão Ambiental e Procura de Gestão Ambiental e
Sustentabilidade
Manuel Duarte Pinheiro www.lidera.info
LiderA
1
Performance and Management to
10 10
Building E Project
System Users Energy
Performance CO
2x 2
Manuel Duarte
Ratti, C.; Baker, N.;
Steemers, K. (2005). Energy
ti d b
x 2,5
x 5 d ll
x 2 estimated x 2
Pinheiro www.lidera.info
consumption and urban texture, Energy and Buildings, Volume 37, Issue
7, 1 July 2005, Pages 762‐
776
modelling
Urban Context and Climatic
x 2 ?
LiderA Environmental Management
¾ Solutions ‐ Implementação das Medidas,
Monitorização e Gestão Construção e Exploração Monitorização e Gestão Construção e Exploração
¾ Continuous Improvement ‐ Melhoria Contínua
Formal Approach
GAMA DE SISTEMAS DE GESTÃO POSSIVEIS DE ENCONTRAR
Não Formal Formal
1 2 3 4 5
Procedimentos e Politicas formais, Politicas Politicas Politicas formais,
Manuel Duarte
Politicas Implicitas
procedimentos implicitos
formais, procedimentos
operacionais escritos são
formais, procedimentos
escritos operacionais e
todos os procedimentos operacionais e de
controlo são Pinheiro
www.lidera.info
limitados de controlo são limitados
escritos
LiderA
P d t
Environmental Management System (EMS)
Organization / Organização Product
Produto ou Serviço
11. .
Environmental Environmental
M t
M t
2.
Auditing 2.
Auditing 33. Product . Product
F t
F t d d
Management Management
System System
Ferramentas
Ferramentas de de Auditoria e
Auditoria e Avaliação Avaliação
Ferramentas
Ferramentas de de Apoio
Apoio ao ao Produto Produto
14000
Sistemas
Sistemas de de Gestão Gestão Ambiental Ambiental
Avaliação do
Desempenho Ambiental
Life Cycle Analyses
Avaliação do Ciclo de Vida
E L b l
ISO
Auditoria Ambienta
l Eco Label
Rotulagem Ecológica
Termos e Definições ISO 14050 Aspectos Ambientais em Normas de Produtos ISO GUIDE 64
Manuel Duarte
E
Environmental Management
Pinheiro www.lidera.info
U E Eco Label
Rótulo Ecológico
Auditing System
Sistema de Ecogestão e Auditoria
LiderA Environmental Management System increasing use
Evolução do número de empresas certificadas ISO 14001 em Portugal
14001 em Portugal
Manuel Duarte
Mais de 10 % associados à Construção (Obra ou Produto)
Pinheiro www.lidera.info
Mais de 10 % associados à Construção (Obra ou Produto)
(Peglau, 2006 e outras fontes)
Aumento na procura, referencial mais utilizado
LiderA EMS – SGA E MELHORIA CONTINUA
Environmental Performance
D h
Environmental Policy Economic
Performance Desempenho
Desempenho Ambiental
Politica Ambiental
Plan
Planeamento Económico
EMS/
EMS/SGA SGA
D Act - Revisão da
Gestão
EMS/
EMS/SGA SGA
Do
Implementação e Operação Check -
Verificaçãoe Acções
Manuel Duarte
Risk Riscos e R
Environmental
I t
Correctiva
s
Pinheiro www.lidera.info
Responsa- bilidades Impact
Impactes
Ambientais
LiderA
Challenge at several Challenge at several
l l levels
Desafio a diferentes níveis
Manuel Duarte
níveis
Pinheiro www.lidera.info
LiderA Environmental Aspects
Construction ‐ Obra ¾ Product ‐ Produto
Nova Construção
Edificado
Infra‐Estrutura
Manuel
Duarte
Demolição Etar Frielas
Remodelação
Pinheiro
www.lidera.info
Life Cycle ‐ Forma de Produção – Concepção, Construção à Gestão
LiderA Diferentes contributos (directo e indirecto)
Uso de energia privada 7.8 toneladas / habitação:
(directo e indirecto)
15,5 ton. CO2 por edificado
Transporte Individual
Climatização
Produção e transporte Climatização Água quente, através de electricidade doméstica Produção e transporte de produtos e serviços ‐ 7.8 toneladas /
habitação:
Transporte de bensp Indústria de transformação,
agricultura
A i t á t
Manuel Duarte
Sustentabilidade pode implicar
Aquecimento, água quente e electricidade especifica para o trabalho
Fonte: Ademe, Contribuição habitações francesas 2002
Pinheiro www.lidera.info
Sustentabilidade pode implicar
reduções importantes !
LiderA
Manuel
Duarte
Wigum 2004:40
Pinheiro www.lidera.info
Wigum, Kristin Støren (2004). Human and ecological problem solving through radical design thinking: Analyses and development of design theory and design framework based on long‐term human needs and ecological sustainable principles. Doctoral thesis (NTNU)
2004 317 p.
Wigum, 2004:40
LiderA
Manuel
Duarte
Wigum 2004:40
Pinheiro www.lidera.info
Wigum, Kristin Støren (2004). Human and ecological problem solving through radical design thinking: Analyses and development of design theory and design framework based on long‐term human needs and ecological sustainable principles. Doctoral thesis (NTNU) 2004
317 p.
Wigum, 2004:40
LiderA
S i bl
Sustainable Management g
Manuel Duarte Pinheiro www.lidera.info
LiderA Sustainable Built Environment
S t t bilid d bi t t íd Sustentabilidade ambientes construídos
¾ Search sustainable
¾ Search sustainable
Social Economic
Environment
E=SUST
Manuel Duarte
Need to improve factorial
Pinheiro www.lidera.info
I=PAT
LiderA Sustainable Management ?
Solutions
Manuel Duarte
Importance
M t d
Importance of
Pinheiro www.lidera.info
Management and Maintenance
Users
LiderA EMS
ISO 14001 frontiers:
ISO 14001 frontiers:
¾ ISO 14001 go to environmental performance
¾ ISO 14001 go to environmental performance
¾ is a base to improve organization and can be neutral, since it is not focused in a specific level of environmental performance, and so the practical results are not necessarily a more sustainable organization or building. In order to assure that environmental performance is achieved, assessment tools will be need;
tools will be need;
¾ ISO 14001 from command to influence
¾ is design to command and control and in cases of buildings environmental management, the users
b i f d d i fl d b t d i t il d h th l i t
can be informed and influenced but command is not necessarily a good approach, so the logic must be to adjust in order to inform and influence several stakeholders;
¾ ISO 14001 applied to different phases
¾
¾ can be applied to different phases, from the idea, to construction, operation and demolition or deconstruction, but usually it is applied to a specific phase, in most of the cases in construction and partially in operational phase, and do not interlink information and management between phases, which constitutes an important step;
Manuel Duarte
¾ ISO 14001 adjust formal procedures
¾ requires specific formal procedures which must be adjust depending of the phases, uses types, for example the applications in construction phase can demand for the need of simpler formal approach and in the operation of a hotel can call for further formal strategies
Pinheiro www.lidera.info
and in the operation of a hotel can call for further formal strategies.
LiderA
Performance and Factorial position Factorial position
Manuel Duarte Pinheiro www.lidera.info
LiderA
C27 building C27 use
C27 Wastewa ter recycling
Factorial position and potential improvement
(i l di )
C26 building C26 use
C26 Wastewa ter treatmen t
W r
(including use)
C19 building C19 use
p dC19 - Rainwate r collection
C16 C18 building
C18 use
r mp n r s
C18 - Consump tion and
losses control
Improvement 25 %
C15 use C16 building C16 use
- me ncy
C16 - Wa
ter consum tion in interio spaces
Improvement 37,5 %
C12 use C15 building C15 use
2 ricit mp rom wabl rces
C15 - Equipm nt efficien
Factor 2 Factor 4 F t 10
Manuel
Duarte C11 use
C12 building
11 tricit y ump on
C12 Electr y
consu tion f
r renew e sour Factor 4 Factor 10
50% 75%
Practice 90%+
Pinheiro
www.lidera.info
0 1 2 3 4 5 6 7 8 9 10
C11 building
C1 Elect y consu tio Existing
Potential
LiderA
From EMS to Sustainable Management System
Management System (SMS)
(SMS)
Manuel Duarte Pinheiro www.lidera.info
LiderA
Local and integration
3 Landscape
C5 Local integration (C LiderA level)
4 Amenities
C7 Valorisation (B)
Hotel Jardim Atlântico, Madeira
Valorisation (B) Resources
6 Energy
C11 Electricity consumption (B)
C15 Equipment efficiency (A)
7 Water
7 Water
C16 Domestic water use (B)
C19 Rainwater collection and use (C)
C20 Storm water management (B) Environmental Loadings
Effl
9 Effluents
C25 Wastewater production (B)
C26 Wastewater treatment (A)
C27 Wastewater recycling (A)
10 Solid Waste
C31 Waste production (C)
C31 Waste production (C)
C32 Toxic waste (C)
C33 Waste recycling (A)
13 Thermal Effects
C35 Heat Island (C) Interior Environment
Interior Environment
14 Indoor environmental air quality
C36 Natural ventilation (C)
C38 Micro contaminant prevention (B)
15 Thermal comfort
C39 Ad t ti f t (A)
Manuel Duarte
C39 Adaptative comfort (A) Durability and Accessibility
20 Accessibility
C47 Relations with the community (C) Environmental Management and Innovation
Pinheiro www.lidera.info
21 Environmental Management
C48 Environmental Information (A)
C49 Recognize Environmental
Management System
LiderA
C27 building C27 use
C27 Wastewa ter recycling
C26 building C26 use
C26 Wastewa ter treatmen t
W r
C19 building C19 use
p dC19 - Rainwate r collection
C16 C18 building
C18 use
r mp n r s
C18 - Consump tion and
losses control
C15 use C16 building C16 use
- me ncy
C16 - Wa
ter consum tion in interio spaces
C12 use C15 building C15 use
2 ricit mp rom wabl rces
C15 - Equipm nt efficien
Manuel
Duarte C11 use
C12 building
11 tricit y ump on
C12 Electr y
consu tion f
r renew e sour
Pinheiro
www.lidera.info
0 1 2 3 4 5 6 7 8 9 10
C11 building
C1 Elect y consu tio Existing
Potential
LiderA Implement ‐ Influence and Control
Manuel Duarte Pinheiro www.lidera.info
LiderA For example, in 2006 (HJA, 2007b) when compared 2007b) when compared with an average of 4
star Hotels in Madeira, , the average shows a:
67% reduction in consumption of
electricity by night and b
by user;
22% reduction in propane gas by night propane gas by night and by user;
55 % reduction in water
Manuel Duarte
55 % reduction in water consumption by night and by user.
Pinheiro www.lidera.info
LiderA
life cycle approach life cycle approach
Desafio a diferentes níveis
Manuel Duarte
níveis
Pinheiro www.lidera.info
LiderA Sustentabilidade desafia a construção aos diferentes níveis
Produtos e Materiais
Equipamentos Requisitos
Clientes
Obra
Operação Concepção
Manuel Duarte
Manutenção/
Pinheiro www.lidera.info
Manutenção/
Renovação Fim de Vida
Orientações e Requisitos
Legais
LiderA Sustentabilidade desafia a construção aos diferentes níveis
Produtos e
Rotulagem Níveis de Emissão
Produtos e Materiais
Equipamentos
g Ecológica Preocupações
Requisitos
Clientes
Critérios e Projectos
Ambientais nas Obras Ambientais
fic aç ão
Critérios Ambientais
Obra
Gestão Ambiental
Integrar ambiente Obra vel e Certi
b ie nta l
Operação Concepção
Ecodesign g
na concepção
Su ste ntá v
stã o Am b
E i
Certificação Energética
e Qualidade n st ru çã o S
Ge s
Energia CO
2Manuel Duarte
Manutenção/
do Ar
Valorização RCDs Co n
Pinheiro www.lidera.info
Manutenção/
Renovação Fim de Vida
Orientações e Requisitos
Legais
LiderA Desafio‐ Challenge
¾ A construção vai crescentemente incorporar a sustentabilidade e a
i t bi t i
Sustainable
Built Environmental
dl dl
gerir os seus aspectos ambientais nas diferentes fases
Design
Cradle to cradle
¾ Concepção
es g
Construction
¾ Obra Construction
O ti
¾ Operação e Manutenção
¾ Desactivação
Operation End
Manuel Duarte
¾ Desactivação
¾ Tal coloca‐lhe um desafio estruturante
End life
l
Pinheiro www.lidera.info
¾ Tal coloca lhe um desafio estruturante
e novas perspectivas cycle
LiderA
Conclusion Conclusion
Manuel Duarte Pinheiro www.lidera.info
LiderA Sustainable and stakeholders(CIRIA, 2006)
Sustainable Development
e
p tion p
Desenvolvimento Sustentável
Sustainable Communities
mplexidade
o nsum p
onsumo ustentávelSustainable Communities
Comunidades Sustentáveis
mento da co
C o
Co SuSustainable Built Environment
exity ‐Aum
Services
Serviços Sustentáveis
Ambiente Construído Sustentável
Sustainable Construction
Compl
Sustainable Habitat
Habitats Sustentáveis
o duction
dução entávelManuel Duarte
Construção Sustentável
Pr o
Prod SustPinheiro
www.lidera.info
Stakeholders‐Aumento no número de actores
Por vezes diferentes perspectivas e interpretações e reflexos a diferentes níveis - Necessidade de gestão
LiderA Conclusion
Management (EMS) have an important responsibility in real performance
Users could have an important proactive role in the search of performance
p
Define what is actual position and potential improvement (factorial) is a central aspect
S i bl h diff l l f
Sustainable management, must have different levels of intervention, including influence and involvement
Manuel Duarte
LiderA System could be use to support sustainable
management and achieve a good real performance
Pinheiro www.lidera.info