• Nenhum resultado encontrado

Instrumentação & Desenvolvimento no LEPS: LIP, CERN e COTEC- Perspectiva 2019/2023

N/A
N/A
Protected

Academic year: 2021

Share "Instrumentação & Desenvolvimento no LEPS: LIP, CERN e COTEC- Perspectiva 2019/2023"

Copied!
9
0
0

Texto

(1)

Instrumentação & Desenvolvimento no LEPS:

LIP, CERN e COTEC- Perspectiva 2019/2023

COTEC - Coordenação de Desenvolvimento Tecnológico

Laboratório de Eletrônica e Processamento de Sinais - LEPS

Colaborador: Fabio Marujo da Silva, M.Sc.

Líder: Gabriel Azzi, M.Sc.

Coordenador: Marcelo Portes de Albuquerque, D.Sc.

December 3, 2019

(2)

Agenda

Colaborações

Nacionais - COMAN - CBPF

Interacionais - CERN

Interacionais - LIP Lisboa

Laboratório de Eletrônica

Fonte HV

Acadêmico

Sistemas Embarcados

Publicações

(3)

Colaborações

Nacionais - COMAN - CBPF

Apoio em Engenharia no Laboratório de Magnetismo

da COMAN Prof

o

Luiz Carlos Sampaio Lima, D.Sc.

Projeto: Transferência de Campo Magnético para alimentar

circuitos eletrônicos (fim-março/2020)

Infraestrutura em Laboratório:

Execução em:

Preparação de amostras

Medidas de precisão

Design & montagem

Cock Croft Walton

AC⇒DC

Cabos especiais

(4)

Colaborações

Interacionais - CERN

Desenvolvimento do Slow Controller para o novo

sistema eletrônico de Back-End da RPC

Projeto de Doutoramento no CEFET/RJ, COHEP/CBPF (mar/19)

Firmware na FPGA da KC705 Evaluation Board

Implementação na FPGA no Rack

(5)

Colaborações

Interacionais - LIP Lisboa

Upgrade of the Observatory Pierre Auger

Desenvolvimento do Slow Control no detector Tipo RPC para o

experimento MARTA (Defesa Mestrado: 18/03/19)

Perspectiva p/ 1

o

Semestre 2020 de integração

Nova HV ± 7000 V

Instrumentação Nuclear-NIM

Nova Interface gráfica

Qt Creator: Eraldo Jr. (COHEP)

Sistema Embarcado

RPi Pi 3B+ (Controle)

RPC

Sensores

Id

HV ± 7000 volts

Massa gás R134

Novo RPC Slow Control

(6)

Laboratório de Eletrônica

Projetos

Fase final de montagem da Fonte HV ± 7000 V

Novo layout & Design para módulo NIM

Perspectiva para 1

o

Semestre 2020

Hardware:

Novo Transformador

Tipo CCFL

(Coilcraft)

Estabilidade

>

Ganho N1:N2

Software:

Integração no controle via I

2

C

Programa gráfico

(7)

Acadêmico

RPi3B+ & Arduino

Perspectiva de docência no Mestrado Profissional

IoT & Sistemas Embarcados

Duas disciplinas previstas para 1

o

e/ou 2

o

semestre de 2020:

1. Desenvolvimento de protótipos de sistemas IoT (Internet of

Things)

5

a

EAFEXP (fev/2020) e 2

o

Semestre de 2020

Horário: 3as e 6as, 17 às 19hs

Local: Núcleo de Informação C&T e Biblioteca (NIB)

Supervisão: Nilton Alves Júnior, D.Sc.

2. Sistemas Embarcados Linux

1

o

e/ou 2

o

Semestre de 2020

Horário: 3as e 6as, 17 às 19hs

Local: à definir

Supervisão: Marcelo Portes de Albuquerque, D.Sc.

(8)

Publicações

Perspectiva de Publicações

Artigos, Notas Técnicas e Trabalhos em Congressos

Artigo 03/2020

Slow control system of the MARTA experiment using RPC

Fabio Marujo1,2, GESUALDI,A.R.2, ZACHI, A. R. L.2 1Centro Brasileiro de Pesquisas Fsicas - CBPF 2Programa de Ps-graduao em Engenharia Eltrica - PPEEL E-mail: fmarujo@cbpf.br December 2019

Abstract.The MARTA (Muon Auger RPC for the Tank Array) experiment will permit an improvement in mesurament of muon showers, event by event. It uses RPC (Resistive Plate Chamber) detectors to identify muons in Cherenkov tanks. These tanks also act as shielding to the electromagnetic shower component. In addition, each RPC detector will be below a precast concrete structure, or above the tank. The electronics of each detector will have trigger information for DAQ (data acquisition) synchronization as well as the supply of its own power source. Slow Control, which consists of a centralized system that monitors and/or controls one or more systems for fault prevention, monitoring, direct control by the user or automated control. The architecture is based on an embedded system, with features for data collection and component control, with integration of all readings of the system involved through a local interface. An IDE is used for the development of a system of control of connected systems, unite the subsystems into one, providing more support in the data of each detector providing a feedback in time of the system state. Keywords: Showers, Detectors, Slow control, Hardware Submitted to: J. Phys. G: Nucl. Part. Phys.

New Slow Control MARTA

Technical Design Report 2021

CERN-LHCC-2017-012

/

CMS-TDR-016

11/02/2018

CERNEuropean Organization for Nuclear Research Organisation europ´eenne pour la recherche nucl´eaire

CERN-LHCC-2017-012 CMS-TDR-016 12 September 2017

CMS

The Phase-2 Upgrade of the

CMS Muon Detectors

TECHNICAL DESIGN REPORT

CMS-LS2 Upgrade

Perspectiva 2019-2023

Instrumentações;

Softwares

Fonte HV

Slow Controller

(CERN)

(9)

Back-up Slides

Referências

Documentos relacionados

Sulfonamide acidity was found to be linearly correlated with the charge of the SO 2 group in the case of para-aryl substitution in agreement with previously reported works, whereas

Museu Nacional de História Natural e da Ciência Lisboa – Portugal 1768 (1798) Misto Universitário Visitável Museu Geológico da Universidade do Porto Porto – Portugal 1838

• Critérios de Classificação para os Campeões do Circuito Trail 7K 2021: ✓ 1º Maior Número de Pontos no Ranking. ✓ 2º Maior Número de Provas Realizadas no Circuito ✓

Precauções para manuseio seguro do produto químico: Deve-se evitar respirar os vapores e/ou névoas e prevenir respingos nos olhos ou na pele.. Não consumir

Também relativamente ao projeto CTM, iniciaram-se, no último trimestre de 2012, as atividades para o envio de mais voluntários para missões em Moçambique, nas Honduras e, pela

Uma erva de uso extremamente ritual difere em suas cores para diferenciar os orixás que pegam cada uma delas e são extremamente apreciadas para rituais de sacudimento, acompanhadas

Contrário a isso observa-se uma expansão volumétrica nos pontos (e linhas) das estruturas cristalizadas pelo perfil convexo na superficie das amostras. Desse modo,

Os animais a exportar foram mantidos em isolamento sob o controlo dos veterinários oficiais do país exportador durante pelo menos 21 dias antes da exportação e foram