A R C H I V E S
o f
F O U N D R Y E N G I N E E R I N G
Published quarterly as the organ of the Foundry Commission of the Polish Academy of Sciences
ISSN (1897-3310)
Volume 7
Issue 1/2007
157– 160
34/1
У
в
в
в
в
в
в
.
в
,
,
. .
2, 350 – 9509
,
e – mail: jjktmiop@prz.rzeszow.pl:
Received 08.02.2007; Approved for print on: 12.03.2007
И
KAIZEN . ,
, ,
,
- ,
.
в в : , , , .
1.
Вв
: ,
. - ,
,
,
.
, ,
,
. [1,2,3]. ,
1, : , ,
, ,
, .
: , ,
, , .
30% : ,
,
. Ц :
,
, .
2.
У
в
в
в
в
,
.1
,
. Э .
, .2, :
-
, ,
, ,
-
, -
, [4].
Gühring
– ,
4 – 6% [5,6]. ,
,
, , ,
15% . , , .
, : , , , .
,
. Gühring
Tool Managment :
, , ,
,
[7]/. .
, .
, , Tool Managament. : ,
. , -
.
, ,
, .
.2. , ,
3.
с
, ,
, , .
-
. ,
, ,
, .
, .
- , [8].
, , ; ,
- ,
.
,
, .
.
, . , ,
. ,
.
.
,
,
. ,
.
-
.
. ,
, . , .
4.
,
:
- , ,
,
- , , ,
- ,
- ,
,
- .
.,
, . .
, .
[1] M. Rother, R. Harris, Creating continuous flow, Brookline, The Lean Enterprise Institute, 2001.
[2] A. Pęciak, K. Wójcik, Lean Thinking in the company Inter Mind. Lean Manufacturing Conference, Wrocław, 2003 (in Polish).
[3] J. Womack, D. Jones, D. Ross, The machine thut changed the world: Based on the automobile, New York, Rawson Associates, 1990.
[4] J. Jaworski, Application possibility of tools made of low- alloy high- speed steels in the planned housing, Archives of Foundry vol.5, No.17 (2005) 115-122 (in Polish).
[5] J. Jaworski
[6] A. Strobel, R. Subbotko, Methods of distribution of tool at units based on TM software of Guhring, Production Engineering Wrocław University of Technology,(2006) 273-280 (in Polish).
[7] A. Kosicki, A. Bocheński, Cost sources in Mahle- Krotoszyn. Plants and methodes of thier reduction, Mechanics 58 Rzeszów 2002.
[8] Information materials of Guhring company (in Polish). [9] Rother M., Shok J. Learn to see. Wrocław Centr for
Technology Transfer, Wrocław University of Technology 2003 (in Polish).
MANAGAMENT QUALITY OF TOOLS IN THE PLANNED HOUSING
CASTING
S
UMMARYThe Kaizen method of housing casting designing was presented in the paper. Algorithm making possibility of identification of tools limiting efficiency of tooling process was formulated. The system of tool management consisting of various modules was shown.
Key words: