• Nenhum resultado encontrado

[PDF] Top 20 Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints

Has 10000 "Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints " found on our website. Below are the top 20 most common "Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints ".

Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints

Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints

... tackles the single machine scheduling problem with dependent setup time and precedence ...constraints. The primary objective of ... See full document

8

Optimization of rewards in single machine scheduling in the rewards-driven systems

Optimization of rewards in single machine scheduling in the rewards-driven systems

... In the meantime, single machine scheduling problem is one of the most scheduling problems due to its practical ...importance. The significance of the ... See full document

10

A MAX-MIN ANT SYSTEM TO MINIMIZE TOTAL TARDINESS ON A SINGLE MACHINE WITH SEQUENCE DEPENDENT SETUP TIMES IMPLEMENTING A LIMITED BUDGET LOCAL SEARCH

A MAX-MIN ANT SYSTEM TO MINIMIZE TOTAL TARDINESS ON A SINGLE MACHINE WITH SEQUENCE DEPENDENT SETUP TIMES IMPLEMENTING A LIMITED BUDGET LOCAL SEARCH

... the problem was developed by Tan and Narasimhan (1997) ...between the BB, GA, SA, and random-start adjacent pairwise interchange ...that the local improvement method offers ... See full document

11

Scheduling Problem with Human Energy Recovery Function under Nonlinear Time-dependent Deterioration

Scheduling Problem with Human Energy Recovery Function under Nonlinear Time-dependent Deterioration

... assignment and weighted number of tardy jobs, in which the actual processing time of a job is a linear increasing function of its starting ...study the problem of ... See full document

7

A SearchCol Algorithm for the unrelated parallel machine scheduling problem with job splitting

A SearchCol Algorithm for the unrelated parallel machine scheduling problem with job splitting

... Logendran and Subur [2004] studied the UPMSP, with job splitting and distinct release dates for jobs and machines, to minimize total weighted ...tardiness. ... See full document

163

Optimization of Realistic Multi-Stage Hybrid Flow Shop Scheduling Problems with Missing Operations Using Meta-Heuristics

Optimization of Realistic Multi-Stage Hybrid Flow Shop Scheduling Problems with Missing Operations Using Meta-Heuristics

... on the same benchmark ...shop scheduling with machines which are not continuously available due to preventive maintenance ...between the machines in the design of loop layout. ... See full document

13

A MULTICRITERIA PERMUTATION FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES

A MULTICRITERIA PERMUTATION FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES

... Abstract: The permutation flow shop scheduling problem has been completely concentrated on in late decades, both from single objective and additionally from multi-objective points of ... See full document

11

4 A Dynamical Ant Colony Optimization with Heuristics for Scheduling Jobs on a Single Machine with a Common Due Date

4 A Dynamical Ant Colony Optimization with Heuristics for Scheduling Jobs on a Single Machine with a Common Due Date

... (GAs) and Tabu Search (TS) have been proposed to find the near optimal solutions for the problem of scheduling jobs on a single ma- chine with a common due date [6, 7, 9] ... See full document

14

Unrelated parallel machine scheduling problem: a cement industry case study

Unrelated parallel machine scheduling problem: a cement industry case study

... total weighted completion time of jobs and proposed seven DRs based ...instances, and provided good solutions. Also in parallel machine environments, Na et ...dealt with a ... See full document

126

A Fast Heuristic for a Lot Splitting and Scheduling Problem of a Textile Industry

A Fast Heuristic for a Lot Splitting and Scheduling Problem of a Textile Industry

... Yalaoui and Chu (2003) and Tahar et ...for the identical parallel machine scheduling problem with job splitting and with sequence dependent ... See full document

6

A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

... offline scheduling structure, all the details about the jobs are gathered before the process ...that the offline version of single machine batching problem is ... See full document

12

Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

... services. The problem considered in this paper concerns scheduling of maintenance tasks under resource (maintenance teams) ...This problem is generally known as unrelated parallel ... See full document

10

Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms

Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms

... for minimizing � ��� (Patterson et al., 1989; Talbot, 1982). But, during the last 2 decades, scientists have developed more RCPSP problems considering varied ...RCPSP with four optimization criteria: ... See full document

18

Economic lot scheduling problem with consideration of money time value

Economic lot scheduling problem with consideration of money time value

... that the payment are made to the suppliers immediately after receiving the ...of time for settling the account on a day-to-day basis (Aggarwal and Jaggi ...consider the ... See full document

18

J. Braz. Soc. Mech. Sci. & Eng.  vol.33 número1

J. Braz. Soc. Mech. Sci. & Eng. vol.33 número1

... Hejazi and Saghafian (2005) made a comprehensive literature review concerning the flow shop production ...environment. The authors showed that most of the research done in this area considers ... See full document

5

Solving Public Transit Scheduling Problems

Solving Public Transit Scheduling Problems

... models and techniques. This phase of the planning process comprises vehicle scheduling, crew scheduling and rostering ...describe the integrated vehicle-crew-rostering ... See full document

32

Scheduling problem in a distribution center with two cranes subject to non-interference constraints

Scheduling problem in a distribution center with two cranes subject to non-interference constraints

... Este trabalho ´e motivado pelo impacto econˆomico de problemas de sequenciamento na cadeia de suprimento e pela sua aplicabilidade em ambientes industriais e de servi¸cos. Este estudo trata do sequenciamento de tarefas ... See full document

103

Effect of Annealing Time for Quenching CuAl7Fe5Ni5W2Si2 Bronze on the Microstructure and Mechanical Properties

Effect of Annealing Time for Quenching CuAl7Fe5Ni5W2Si2 Bronze on the Microstructure and Mechanical Properties

... of the sample during heat treatment and heat treatment of the characteristic parameters of the tested bronze samples shown in Figure ...4. The heat treatment process consisted of ... See full document

18

Performance Enhancement of Scheduling Algorithm in Heterogeneous Distributed Computing Systems

Performance Enhancement of Scheduling Algorithm in Heterogeneous Distributed Computing Systems

... Considering the application DAG shown in Fig. 4, Table 1 shows the computation ...matrix. The generated schedule along with stepwise trace of the HCPT algorithm and NDCP ... See full document

9

en 0104 530X gp 0104 530X1874 14

en 0104 530X gp 0104 530X1874 14

... encouraged the implementation of mixed assembly lines in many industrial environments (Mendes et ...in the same assembly line (AL) (Becker & Scholl, 2006), and different sales cycles may be ... See full document

15

Show all 10000 documents...